2011-20934. Integrated System Power Rates: Correction  

  • Start Preamble

    AGENCY:

    Southwestern Power Administration, DOE.

    ACTION:

    Notice of public review and comment; Correction.

    SUMMARY:

    Southwestern Power Administration published a document in the Federal Register (76 FR 48159) on August 8, 2011, announcing the public review and comment period on proposed rates. Inadvertently, the date listed for the combined Public Information and Comment Forum (Forum) was erroneously listed in the DATES section as of August 16, 2011. The correct date and time for the Forum, if requested, will be August 30, 2011, at 9 a.m.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Mr. James K. McDonald, Assistant Administrator, Office of Corporate Operations, Southwestern Power Administration, U.S. Department of Energy, One West Third Street, Tulsa, Oklahoma 74103, (918) 595-6690, jim.mcdonald@swpa.gov.

    Start Signature

    Dated: August 10, 2011.

    Jon Worthington,

    Administrator.

    End Signature End Further Info End Preamble

    [FR Doc. 2011-20934 Filed 8-12-11; 4:15 pm]

    BILLING CODE 6450-01-P

Document Information

Comments Received:
0 Comments
Published:
08/16/2011
Department:
Southwestern Power Administration
Entry Type:
Notice
Action:
Notice of public review and comment; Correction.
Document Number:
2011-20934
Pages:
50726-50726 (1 pages)
PDF File:
2011-20934.pdf
Supporting Documents:
» Integrated System Rate Schedules
» 2021 Continuation of Temporary Power Sales Program
» Rate Schedules: Integrated System, Sam Rayburn Dam, and Robert D. Willis
» Continuation of Temporary Power Sales Program
» Integrated System Rate Schedules
» Sam Rayburn Dam Rate Schedule
» Integrated System Power Rates
» Integrated System Rate Schedules
» Integrated System Rate Schedules
» Sam Rayburn Dam Project Power Rate,