-
Start Preamble
AGENCY:
Federal Energy Regulatory Commission, COE.
ACTION:
Notice of information collection and request for comments.
SUMMARY:
In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the information collection, FERC-725I (Mandatory Reliability Standards for the Northeast Power Coordinating Council) which will be submitted to the Office of Management and Budget (OMB) for a review of the information collection requirements.
DATES:
Comments on the collection of information are due October 17, 2016.
ADDRESSES:
You may submit comments (identified by Docket No. RD16-8-000) by either of the following methods:
- eFiling at Commission's Web site: http://www.ferc.gov/docs-filing/efiling.asp.
- Mail/Hand Delivery/Courier: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE., Washington, DC 20426.
Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676 (toll-free), or (202) 502-8659 for TTY.
Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email at DataClearance@FERC.gov, telephone at (202) 502-8663, and fax at (202) 273-0873.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Title: FERC-725I, Mandatory Reliability Standards for the Northeast Power Coordinating Council.
OMB Control No.: 1902-0258.
Type of Request: Three-year approval of the FERC-725I information collection requirements, as modified.
Abstract: On June 9, 2016, the North American Electric Reliability Corporation (NERC) and the Northeast Power Coordination Council, Inc. (“NPCC”) filed a petition for Commission approval, pursuant to section 215(d)(1) of the Federal Power Act (“FPA”) [1] and Section 39.5 [2] of the Federal Energy Regulatory Commission's regulations, of the retirement of NPCC Regional Reliability Standard PRC-002-NPCC-01 (Disturbance Monitoring) and the two related NPCC regional definitions, Current Zero Time and Generating Plant.
Type of Respondents: Public utilities.
Estimate of Annual Burden: [3] The Commission estimates the reduction (due to the retirement of Reliability Standard PRC-002-NPCC-01) in the annual public reporting burden for the information collection as follows:
Start Printed Page 54572Information collection requirements Number of respondents Annual number of responses per respondent Total number of responses Average burden (hours) Total annual burden (hours) (1) (2) (1)*(2)=(3) (4) (3)*(4)=(5) R13: GO 4 and TO to have evidence it acquired and installed dynamic disturbance recorders and a mutually agreed upon implementation schedule with the RC (record retention) 1 1 1 10 10 R14.5: GO and TO to have evidence of a maintenance and testing program for stand-alone disturbance monitoring equipment including monthly verification of active analog quantities 169 12 2028 5 10,140 R14.7: GO and TO to record efforts to return failed units to service if it takes longer than 90 days 5 33 1 33 10 330 R14.7: GO and TO record retention 33 1 33 10 330 R17: RC provide certain disturbance monitoring equipment data to the Regional Entity upon request 5 1 5 5 25 R17: RC record retention 5 1 5 10 50 Total Reductions 2,105 10,885 4 For purposes of these charts, generation owner is abbreviated to GO, transmission owner is abbreviated to TO, reliability coordinator is abbreviated to RC, and planning coordinator is abbreviated to PC. 5 We estimate that an entity will experience a unit failure greater than 90 days once every five years. Therefore, 20 percent of NPCC's 169 generator owners and transmission owners will experience a unit failure of this duration each year. Comments: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency's estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology.
Start SignatureDated: August 10, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Footnotes
1. 16 U.S.C. 824o (2012).
Back to Citation2. 18 CFR 39.5 (2015).
Back to Citation3. The Commission defines burden as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. For further explanation of what is included in the information collection burden, reference 5 Code of Federal Regulations 1320.3.
Back to Citation[FR Doc. 2016-19474 Filed 8-15-16; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 08/16/2016
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Action:
- Notice of information collection and request for comments.
- Document Number:
- 2016-19474
- Dates:
- Comments on the collection of information are due October 17, 2016.
- Pages:
- 54571-54572 (2 pages)
- Docket Numbers:
- Docket No. RD16-8-000
- PDF File:
- 2016-19474.pdf