2017-17245. Air Plan Approval; SC: Standards for Volatile Organic Compounds and Oxides of Nitrogen  

  • Start Preamble

    AGENCY:

    Environmental Protection Agency (EPA).

    ACTION:

    Proposed rule.

    SUMMARY:

    The Environmental Protection Agency (EPA) is proposing to approve changes to the South Carolina State Implementation Plan (SIP) that revise several miscellaneous rules for control standards for process industries. Specifically, changes are made to standards for volatile organic compounds and oxides of nitrogen. EPA is proposing to approve portions of SIP revisions submitted by the State of South Carolina, through the South Carolina Department of Health and Environmental Control, on the following dates: October 1, 2007, June 17, 2013, and January 20, 2016. These actions are being proposed pursuant to the Clean Air Act.

    DATES:

    Written comments must be received on or before September 15, 2017.

    ADDRESSES:

    Submit your comments, identified by Docket ID No. EPA-R04-OAR-2017-0388 at https://www.regulations.gov. Follow the online instructions for submitting comments. Once submitted, comments cannot be edited or removed from Regulations.gov. EPA may publish any comment received to its public docket. Do not submit electronically any information you consider to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Multimedia submissions (audio, video, etc.) must be accompanied by a written comment. The written comment is considered the official comment and should include discussion of all points you wish to make. EPA will generally not consider comments or comment contents located outside of the primary submission (i.e. on the web, cloud, or other file sharing system). For additional submission methods, the full EPA public comment policy, information about CBI or multimedia submissions, and general guidance on making effective comments, please visit https://www2.epa.gov/​dockets/​commenting-epa-dockets.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    D. Brad Akers, Air Regulatory Management Start Printed Page 38866Section, Air Planning and Implementation Branch, Air, Pesticides and Toxics Management Division, U.S. Environmental Protection Agency, Region 4, 61 Forsyth Street, SW., Atlanta, Georgia 30303-8960. Mr. Akers can be reached via telephone at (404) 562-9089 or via electronic mail at akers.brad@epa.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    In the Final Rules Section of this Federal Register, EPA is approving the State's SIP revision as a direct final rule without prior proposal because the Agency views this as a noncontroversial submittal and anticipates no adverse comments. A detailed rationale for the approval is set forth in the direct final rule. If no adverse comments are received in response to this rule, no further activity is contemplated. If EPA receives adverse comments, the direct final rule will be withdrawn and all public comments received will be addressed in a subsequent final rule based on this proposed rule. EPA will not institute a second comment period on this document. Any parties interested in commenting on this document should do so at this time.

    Start Signature

    Dated: August 3, 2017.

    V. Anne Heard,

    Acting Regional Administrator, Region 4.

    End Signature End Supplemental Information

    [FR Doc. 2017-17245 Filed 8-15-17; 8:45 am]

    BILLING CODE 6560-50-P

Document Information

Published:
08/16/2017
Department:
Environmental Protection Agency
Entry Type:
Proposed Rule
Action:
Proposed rule.
Document Number:
2017-17245
Dates:
October 1, 2007, June 17, 2013, and January 20, 2016. These actions are being proposed pursuant to the Clean Air Act.
Pages:
38865-38866 (2 pages)
Docket Numbers:
EPA-R04-OAR-2017-0388, FRL-9966-21-Region 4
PDF File:
2017-17245.pdf
Supporting Documents:
» SC_10-1-2007_Submittal Combined
» SC_6-17-2013_Submittal Combined
» SC_1-20-2016_Submittal Combined
» SC Clarification Letter for Permitting Regulations and SIP Backlog
CFR: (1)
40 CFR 52