99-21242. Postage Evidencing Product Submission Procedures  

  • [Federal Register Volume 64, Number 158 (Tuesday, August 17, 1999)]
    [Notices]
    [Pages 44760-44766]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-21242]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    POSTAL SERVICE
    
    
    Postage Evidencing Product Submission Procedures
    
    AGENCY: Postal Service.
    
    ACTION: Proposed Procedure.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Federal Register, dated September 2, 1998, provided 
    proposed product submission procedures for all postage evidencing 
    products, including those in the Information Based Indicia Program 
    (IBIP). In response to the solicitation of public comments, only one 
    submission was received. The comments in this submission were 
    considered in making the changes incorporated in the current version. 
    The current proposed procedures revise, clarify, and expand the earlier 
    proposed procedures to include a new section on approval of product 
    changes and a new section addressing intellectual property issues. The 
    proposed procedures now indicate where steps in the product submission 
    process can be concurrent rather than sequential and discuss the Postal 
    Service response. Providers are asked to update documentation to 
    reflect the ``as approved'' product prior to final approval. The 
    current proposed procedures address all postage evidencing products, 
    including, but not limited to, traditional meter products and IBI 
    products. However, changes clarify which requirements apply only to 
    IBIP products and not to traditional meter products. A requirement was 
    added for a document describing how the Address Matching System (AMS) 
    CD-ROM will be integrated in an IBIP Open System product. A requirement 
    was added to the comprehensive test plan to include a test of the 
    physical security of the Provider's site and firewall where applicable, 
    and of the processes for administrative access and configuration 
    control. Requirements were also added with respect to the 
    responsibilities of the laboratories testing products with 
    cryptographic modules.
    
    DATES: Comments must be received on or before October 18, 1999.
    
    ADDRESSES: Written comments should be mailed or delivered to the 
    Manager, Metering Technology Management, Room 8430, 475 L'Enfant Plaza 
    SW, Washington DC 20260-2444. Copies of all written comments will be 
    available at the above address for inspection and photocopying between 
    9 a.m. and 4 p.m. Monday through Friday.
    
    FOR FURTHER INFORMATION CONTACT: Nicholas S. Stankosky, (202) 268-5311.
    
    SUPPLEMENTARY INFORMATION: With the expansion of postage application 
    methods and technologies, it is essential that product submission 
    procedures for all postage evidencing products be clearly stated and 
    defined. The Postal Service evaluation process can be effective and 
    efficient if these procedures are followed explicitly by all suppliers. 
    In this way, secure and convenient technology will be made available to 
    the mailing public with minimal delay and with the complete assurance 
    that all Postal Service technical, quality, and security requirements 
    have been met. These procedures apply to all proposed postage 
    evidencing products and systems, whether the Provider is new or is 
    currently authorized by the Postal Service.
        39, Code of Federal Regulations (CFR) Section 501.9, Security 
    Testing, currently states, ``the Postal Service reserves the right to 
    require or conduct additional examination and testing at any time, 
    without cause, of any meter submitted to the Postal Service for 
    approval or approved by the Postal Service for manufacture and 
    distribution.'' For products meeting the performance criteria for 
    postage evidencing under the Information Based Indicia Program (IBIP), 
    including PC Postage products, the equivalent section is 39 CFR Section 
    502.10, Security Testing, published as a proposed rule in the Federal 
    Register, September 2, 1998. When the Postal Service elects to retest a 
    previously approved product, the Provider will be required to resubmit 
    the product for evaluation according to part or all of the proposed 
    procedures. Full or partial compliance with the procedures will be 
    determined by the Postal Service prior to resubmission by the Provider.
        The proposed submission procedures will be referenced in 39 CFR 
    Parts 501 and 502 but will be published as a separate document as 
    Metering Technology Management, Postage Evidencing Product Submission 
    Procedures.
    
    1. Product Submission Procedures
    
        In submitting any postage evidencing product for Postal Service 
    evaluation, the proposed Provider must provide detailed documentation 
    and comply with requirements in the following areas:
    
     Letter of Intent
     Nondisclosure Agreements
     Concept of Operations (CONOPS)
     Software and Documentation Requirements
     Provider Infrastructure Plan
     USPS Address Matching System (AMS) CD-ROM Integration
     Product Submission/Testing
     Provider Infrastructure Testing
     Field Test (Beta) Approval (Limited Distribution)
     Provider/Product Approval (Full Distribution)
    
        The Provider shall indicate the specific requirement(s) addressed 
    by each document submitted in compliance with these Postage Evidencing 
    Product Submission Procedures. The Postal Service requests that the 
    documentation includes a matrix showing where each specific requirement 
    is addressed. Documentation shall be in English and formatted for 
    standard letter size (8.5''  x  11'') paper, except for engineering 
    drawings, which shall be folded to the required size. Where 
    appropriate, documentation shall be marked as ``Confidential.'' The 
    steps in the Postage Evidencing Product Submission Procedures must be 
    completed in sequential order, except as detailed below.
    
    1.1. Letter of Intent
    
        The Provider must submit a Letter of Intent to the Manager, 
    Metering Technology Management, United States Postal Service, 475 
    L'Enfant Plaza SW, Room 8430, Washington DC 20260-2444.
        A. The Letter of Intent must include:
        (1) Date of correspondence.
        (2) Name and address of all parties involved in the proposal. In 
    addition to the Provider, the parties listed shall
    
    [[Page 44761]]
    
    include those responsible for assembly, distribution, management of the 
    product/device,\1\ hardware/firmware/software development, testing, and 
    other organizations involved (or expected to be involved) with the 
    product, including suppliers of significant product components.
    ---------------------------------------------------------------------------
    
        \1\ When speaking generically about processes, etc., the term 
    ``product'' is used. However, the term ``product'' includes 
    ``product/device.''
    ---------------------------------------------------------------------------
    
        (3) Name and phone number of official point of contact for each 
    company identified.
        (4) Provider's business qualifications (i.e., proof of financial 
    viability, certifications and representations, proof of ability to be 
    responsive and responsible).
        (5) Product/device concept narrative.
        (6) Provider infrastructure concept narrative.
        (7) Narrative that identifies the internal resources knowledgeable 
    of current Postal Service policies, procedures, performance criteria, 
    and technical specifications to be used to develop security, audit, and 
    control features of the proposed product.
        (8) The target Postal Service market segment the proposed product 
    is envisioned to serve.
        B. The Provider must submit with the Letter of Intent a proposed 
    product development plan of actions and milestones (POA&M) with a start 
    date coinciding with the date of the Letter of Intent. Reasonable 
    progress must be shown against these stated milestones.
        C. The Manager, Metering Technology Management, will acknowledge in 
    writing the receipt of the Provider's Letter of Intent and will 
    designate a Postal Service point-of-contact. Upon receipt of this 
    acknowledgment, the Provider may continue with the sequential 
    requirements of the product submission process.
    
    1.2. Nondisclosure Agreements
    
        These agreements are intended to ensure confidentiality and 
    fairness in business. The Postal Service is not obligated to provide 
    product submission status to any parties not identified in the Letter 
    of Intent. After obtaining signed nondisclosure agreements, the 
    Provider may continue with the sequential requirements of the product 
    submission process.
    
    1.3. Concept of Operations
    
        A. The Provider must submit a Concept of Operations (CONOPS) that 
    discusses at a moderate level of detail the features and usage 
    conditions for the proposed product. The Provider should submit 10 
    serialized hard copies and one electronic copy on a PC-formatted 3.5'' 
    floppy disk. Additionally, the Provider must also submit a detailed 
    process model supporting each CONOPS section.
    
        Note: The Postal Service will not be obligated to provide 
    consulting guidance on any current Postal Service policy, procedure, 
    performance criteria, or specification beyond publicly available 
    publications.
    
        B. At a minimum, the CONOPS should cover the following areas:
    
    (1) System Overview
        (a) Concept overview/business model
        (b) Concept of production/maintenance administration
        (c) For Information Based Indicia (IBI) PC Postage products, the 
    system design overview, including:
        (i) Postal Security Device (PSD) implementation (stand-alone, LAN, 
    WAN, hybrid)
        (ii) Features
        (iii) Components, including the digital signature algorithm
        (d) Product lifecycle overview
        (e) Adherence to industry standards, such as Federal Information 
    Processing Standard (FIPS) 140-1, as required by the Postal Service
    (2) For proposed IBI PC Postage products, the system design details, 
    including:
        (a) PSD features and functions
        (b) Host system features and functions
        (c) Other components required for normal use conditions
    (3) Product Lifecycle
        (a) Manufacturer
        (b) Postal Service certification of product/device
        (c) Production
        (d) Distribution
        (e) Product/device licensing and registration
        (f) Initialization
        (g) Product authorization and installation
        (h) Postage Value Download (PVD) process
        (i) Product and support system audits
        (j) Inspections
        (k) Product withdrawal/replacement
        (i) Overall process
        (ii) Product failure/malfunction procedures
        (l) Scrapped product process
    (4) Finance Overview
        (a) Customer account management
        (i) Payment methods
        (ii) Statement of account
        (iii) Refund
        (b) Individual product finance account management
        (i) PVD
        (ii) Refund
        (c) Daily account reconciliation
        (i) Provider reconciliation
        (ii) Postal Service detailed transaction reporting
        (d) Periodic summaries
        (i) Monthly reconciliation
        (ii) Other reporting, as required by the Postal Service
    (5) Interfaces
        (a) Communications and message interfaces with Postal Service 
    infrastructure, including but not limited to:
        (i) PVDs
        (ii) Refunds
        (iii) Inspections
        (iv) Product audits
        (v) Lost or stolen product procedures
        (b) Communications and message interfaces with applicable Postal 
    Service financial functions, including but not limited to:
        (i) Postage settings, including those done remotely
        (ii) Daily account reconciliation
        (iii) Refunds
        (c) Communication and message interfaces with Customer 
    Infrastructure, including but not limited to:
        (i) Cryptographic key management
        (ii) Product audits (device and host system)
        (iii) Inspections
        (d) Message error detection and handling
    (6) Technical Support and Customer Service
        (a) User training and support
        (b) Software Configuration Management (CM) and update procedures
        (c) Hardware/firmware CM and update procedures
    (7) Other
        (a) Change control procedures
        (b) Postal rate change procedures
        (c) Address Management System ZIP+4 CD-ROM updates, if applicable
        (d) Physical security
        (e) Personnel/site security
    
        C. Supplementary requirements, CONOPS.
        (1) The CONOPS must be accompanied by substantiated market analysis 
    supporting the target Postal Service market segment the proposed 
    product is envisioned to serve, as identified in the Letter of Intent.
        (2) The CONOPS must include a list and a detailed explanation of 
    any proposed deviations from Postal Service performance criteria or 
    specifications. Any proposed deviation to audit and control functions 
    required by current Postal Service policy, procedure, performance 
    criteria, or specification must be accompanied by an independent 
    assessment by a nationally recognized, independent, certified
    
    [[Page 44762]]
    
    public accounting firm attesting to the proposed auditing method. The 
    report of this information is to be signed by an officer of the 
    accounting firm.
        D. Postal Service response.
        (1) The Postal Service will respond in a timely manner.
        (2) For each submission, the Postal Service will appoint a Product 
    Review Control Officer. All communications between the Provider and the 
    Postal Service are to be coordinated through the Product Review Control 
    Officer.
        (3) The Postal Service will acknowledge, in writing, receipt of the 
    CONOPS and perform an initial review. The Postal Service will provide 
    the Provider with a written summary of the CONOPS review. In the 
    written review, the Postal Service will provide authorization to 
    continue with the product submission process, or a listing of CONOPS 
    requirements that are not met.
        (4) If, in the sole opinion of the Postal Service, it is determined 
    that significant CONOPS deficiencies do exist, the Postal Service, at 
    the discretion of the Manager, Metering Technology Management, may 
    return the CONOPS to the Provider without further review. It will then 
    be incumbent on the Provider to resubmit a corrected CONOPS.
        (5) The Provider may continue with the product submission process 
    upon receipt of authorization to proceed from the Postal Service.
    
    1.4. Software and Documentation Requirements
    
        A. The Provider must submit to the Postal Service five copies of 
    executable code and one copy of full and source code for all software 
    included in the product.
        B. The Provider must submit a detailed design document of the 
    product. For IBI products, this shall include the proposed IBIP indicia 
    design, which must be approved by the Manager, Metering Technology 
    Management.
        C. Additionally, depending on the product, the Postal Service 
    requires design documentation that includes, but is not limited to, the 
    following:
    
    (1) Operations manuals for product usage
    (2) Interface description documents for all proposed communications 
    interfaces
    (3) Maintenance manuals
    (4) Schematics
    (5) Product initialization procedures
    (6) Finite state machine models/diagrams
    (7) Block diagrams
    (8) Security features descriptions
    (9) Cryptographic operations descriptions
    
        Detailed references for much of this documentation are listed in 
    FIPS 140-1, Appendix A. The Postal Service will determine the number of 
    copies needed of the aforementioned documentation based on the CONOPS 
    review. The Postal Service will notify the Provider of the required 
    number of copies. The required number of copies are to be uniquely 
    numbered for control purposes.
        D. The Provider must submit a comprehensive test plan that will 
    validate that the product meets all Postal Service requirements and, 
    where appropriate, the requirements of FIPS 140-1. With respect to the 
    Provider's internet server, the test plan shall indicate how the 
    Provider will test to ensure the physical security of the Provider's 
    server and administrative site and the firewall, and to ensure the 
    security of the processes for remote administrative access and 
    configuration control. With respect to the process for initializing 
    customer accounts, the test plan shall describe the tests for ensuring 
    secure distribution or transmission of software and cryptographic keys. 
    The test plan must list the parameters to be tested, test equipment, 
    procedures, test sample sizes, and test data formats. Also, the plan 
    must include detailed descriptions, specifications, design drawings, 
    schematic diagrams, and explanations of the purposes for all special 
    test equipment and nonstandard or noncommercial instrumentation. 
    Finally, this test plan must include a proposed schedule of major test 
    milestones.
        E. The Provider must submit a benchmark assessment plan. Postal 
    Service Engineering will provide reference standards, performance 
    criteria, specifications, etc., to be used as a basis for the Provider 
    to produce this plan.
        F. Postal Service Response:
        (1) The Postal Service will provide its response in a timely 
    manner.
        (2) The Postal Service will acknowledge, in writing, receipt of the 
    Provider's design and test plans and will perform an initial review. 
    The Postal Service will furnish the Provider with a written summary of 
    the design plan and test plan reviews. In the written review, the 
    Postal Service will provide authorization to continue with the product 
    submission process, or will provide a listing of design plan 
    requirements or test plan requirements that are not met, and perhaps 
    other deficiencies.
        (3) If, in the sole opinion of the Postal Service, it is determined 
    that significant design plan or test plan deficiencies do exist, the 
    Postal Service, at the discretion of the Manager, Metering Technology 
    Management, may return the plans to the Provider without further 
    review. It will then be incumbent on the Provider to resubmit revised 
    plans that address the identified deficiencies.
        (4) The Provider may continue with the product submission process 
    upon receipt of authorization to proceed from the Postal Service.
    
    1.5. Provider Infrastructure Plan
    
        A. The Provider Infrastructure Plan may be submitted concurrently 
    with the design and test plans described in paragraph 1.4, Software and 
    Documentation Requirements. At this point in the product submission 
    process, the Postal Service will provide additional performance 
    criteria and specifications for the IBIP public key infrastructure, if 
    required for the product/device, for use as a basis for the applicable 
    elements of the Provider's Infrastructure Plan.
        B. The Provider must submit a Provider Infrastructure Plan that 
    describes how the processes and procedures described in the CONOPS will 
    be met or enforced. This includes, but is not limited to, a detailed 
    description of all Provider-related and Postal Service-related 
    operations, computer systems, and interfaces with both customers and 
    the Postal Service that the Provider shall use in manufacturing, 
    producing, distribution, customer support, product/device lifecycle, 
    inventory control, print readability quality assurance, and reporting.
    
    C. Postal Service Response
    
        (1) The Postal Service will respond in a timely manner.
        (2) The Postal Service will acknowledge in writing the receipt of 
    the Provider's Infrastructure Plan and will perform an initial review. 
    The Postal Service will provide the Provider with a written summary of 
    the Infrastructure Plan review. In the written review, the Postal 
    Service will provide authorization to continue with the product 
    submission process, or a listing of the Infrastructure Plan 
    requirements that are not met, and perhaps other deficiencies.
        (3) If, in the sole opinion of the Postal Service, it is determined 
    that significant Provider Infrastructure Plan deficiencies do exist, 
    the Postal Service, at the discretion of the Manager, Metering 
    Technology Management, may return the Infrastructure Plan to the 
    Provider without further review. It will then be incumbent on the 
    Provider to resubmit
    
    [[Page 44763]]
    
    a revised Infrastructure Plan to address the identified deficiencies.
        (4) The Provider may continue with the product submission process 
    upon receipt of authorization to proceed from the Postal Service.
    
    1.6. USPS Address Matching System (AMS) CD-ROM Integration
    
        A. The USPS AMS CD-ROM is a required component of IBIP open 
    systems. For such systems, the Provider shall initiate an agreement 
    with the USPS National Customer Support Center (NCSC). This signed 
    agreement shall describe responsibilities of the AMS CD-ROM supply 
    chain processes, including roles of the Provider. The only 
    functionality of the AMS CD-ROM available through an IBIP system shall 
    be address matching and ZIP+4 coding of input addresses.
        B. The Provider shall submit a detailed description of how the USPS 
    AMS CD-ROM will be integrated in the product, including a description 
    of the process by which an address is ZIP+4 coded, including all 
    possible optional and required parameters. The Provider can submit this 
    information concurrent with submission of the Software and 
    Documentation Requirements and/or Provider Infrastructure Plan 
    described above.
        C. Any CONOPS or products proposed for which the Provider requests 
    a variance to the AMS CD-ROM requirements must be approved by the 
    Manager, Metering Technology Management, prior to proceeding with the 
    next step in the submission process.
    
    1.7. Product Submission/Testing
    
        A. The product/device Provider must be prepared to submit up to 
    five complete production systems of each product/device for which 
    Postal Service evaluation is requested. The required number of 
    submitted systems will be determined by the Postal Service. The 
    Provider must provide any equipment required in order to use the 
    submitted product/device in the manner contemplated by the CONOPS.
        Thorough Provider testing of the product prior to submission of the 
    product to the Postal Service will avoid unnecessary delays in the 
    review and evaluation process. If, in the opinion of the Postal 
    Service, it is determined that significant product deficiencies exist, 
    the Postal Service, at the discretion of the Manager, Metering 
    Technology Management, may return the product to the Provider without 
    further review. The Provider would have the option to resubmit a 
    corrected product.
        B. If the product contains a cryptographic module, the Provider 
    must submit the proposed product to a laboratory accredited under the 
    National Voluntary Laboratory Accreditation Program (NVLAP) for FIPS 
    140-1 certification, or equivalent, as authorized by the Postal 
    Service. Upon completion of the FIPS 140-1 certification, or 
    equivalent, the Postal Service requires the following to be forwarded 
    directly from the accredited laboratory to the Manager, Metering 
    Technology Management for review:
        (1) A copy of all information given to the laboratory by the 
    Provider, including a summary of all information transmitted orally.
        (2) A copy of all instructions from the Provider with respect to 
    what is or is not to be tested for.
        (3) A copy of the letter of recommendation for the product as 
    submitted by the laboratory to the National Institute of Standards and 
    Technology (NIST) of the United States of America.
        (4) Copies of all proprietary and nonproprietary reports and 
    recommendations generated during the test process.
        (5) A copy of the certificate, if any, issued by NIST for the 
    product.
        (6) Written full disclosure identifying any contribution of the 
    NVLAP laboratory to the design, development, or ongoing maintenance of 
    the product/device.
        C. If the product is submitted to an accredited test laboratory to 
    meet the requirements of paragraph B, above, the laboratory must meet 
    all the requirements specified by NIST in the Implementation Guidance 
    for FIPS PUB 140-1 and the Cryptographic Module Validation Program; 
    NIST document 150-17, Cryptographic Module Testing; and other documents 
    issued by NIST to govern the conduct of accredited laboratories.
        D. All products submitted to an accredited laboratory for testing 
    under paragraph B above shall be retained by the laboratory for three 
    years from date of product approval by the Postal Service.
        E. The Provider may submit the product to the Postal Service for 
    test and evaluation prior to completion of any required FIPS 140-1 
    testing, provided a letter is submitted from the NVLAP laboratory to 
    the Postal Service indicating:
        (1) That the product is being tested under FIPS 140-1 for the 
    required security levels, in accordance with the current, relevant 
    performance criteria.
        (2) That the product has a reasonable chance of meeting the FIPS 
    140-1/USPS security levels.
        (3) The timeline for FIPS 140-1 test completion.
        F. The Postal Service reserves the right to require or conduct 
    additional examination and testing at any time, without cause, of any 
    product submitted to the Postal Service for approval or approved by the 
    Postal Service for manufacture and distribution.
        G. Upon satisfactory completion of the Postal Service testing and 
    NVLAP laboratory testing (where required), the Postal Service will 
    provide authorization to continue the product submission process. The 
    Provider may continue with the product submission process upon receipt 
    of authorization to proceed from the Postal Service.
    
    1.8. Product Infrastructure Testing
    
        A. Prior to approval for distribution of any product/device, the 
    Provider must achieve test and approval of all reporting requirements, 
    including, but not limited to, Postal Service/customer licensing 
    support, product status activity reporting, total product population 
    inventory, irregularity reporting, lost and stolen reporting, financial 
    transaction reporting, account reconciliation, digital certificate 
    acquisition, product initialization, cryptographic key changes, rate 
    table changes, print quality assurance, device authorization, device 
    audit, product audit, and remote inspections.
        B. Testing of these activities and functions includes computer-
    based testing of all interfaces with the Postal Service, including but 
    not limited to the following:
    
    (1) Product manufacture and lifecycle (including leased, unleased, new 
    product/device stock, installation, withdrawal, replacement, key 
    management, lost, stolen, and irregularity reporting)
    (2) Product distribution and initialization (including product 
    authorization, product initialization, customer authorization, and 
    product maintenance)
    (3) Licensing (including license application, license update, and 
    license revocation)
    (4) Finance (including cash management, individual product financial 
    accounting, refund management, daily summary reports, daily transaction 
    reporting, and monthly summary reports)
    (5) Audits and inspections, including site audits
    
        C. The Provider must complete a ``Product-Provider Infrastructure-
    Financial Institution-USPS Infrastructure'' (Alpha) test involving all 
    entities in the proposed architecture. At
    
    [[Page 44764]]
    
    a minimum this includes the proposed product, Provider Infrastructure, 
    financial institution and Postal Service Infrastructure systems and 
    interfaces. Alpha testing is intended to demonstrate the proposed 
    product utility, and its functionality and compatibility with other 
    systems. Alpha testing may be conducted in a laboratory environment.
        D. Provider Infrastructure Testing (Alpha) test note: The Postal 
    Service reserves the right to require or conduct additional examination 
    and testing at any time, without cause, of any Provider Infrastructure 
    system supporting a postage evidencing product/device approved by the 
    Postal Service for manufacture and distribution. Initial Provider 
    Infrastructure testing and (Alpha) testing schedules will be supported 
    at the convenience of the Postal Service.
        E. Demonstrable evidence of successful completion for each test is 
    required prior to proceeding.
        F. The Provider may continue with the product submission process 
    upon receipt of authorization to proceed from the Postal Service.
    
    1.9. Field Test (Beta) Approval (Limited Distribution)
    
        A. The Provider will submit a proposed Field (Beta) Test Plan 
    identifying test parameters, product quantities, geographic location, 
    test participants, test duration, test milestones, and product recall 
    plan. The Beta Test Plan will be in accordance with the Beta Test 
    Strategy in effect for the given product type. The Postal Service will 
    supply the appropriate Beta Test Strategy to the Provider upon request. 
    The purpose of the Beta test is to demonstrate the proposed product's 
    utility, security, audit and control, functionality, and compatibility 
    with other systems, including mail entry, acceptance and processing, in 
    a real-world environment. The Beta test will employ available 
    communications and will interface with current operational systems to 
    conduct all product functions. The Manager, Metering Technology 
    Management, will determine acceptance of Provider-proposed Beta Test 
    Plans based on, but not limited to, assessed risk of the product, 
    product impact on Postal Service operations, and requirements for 
    Postal Service resources. Proposed candidates for Beta test 
    participation must be approved by the Postal Service. Beta test 
    approval consideration will be based in whole or in part on the 
    location, mail volume, mail characteristics, and mail origination and 
    destination patterns.
        B. The Provider has a duty to report security weaknesses to the 
    Postal Service to ensure that each product/device model and every 
    product/device in service protects the Postal Service against loss of 
    revenue at all times. Beta participants must agree to a nondisclosure 
    confidentiality agreement when reporting product security, audit, and 
    control issues, deficiencies, or failures to the Provider and the 
    Postal Service. A grant of Field Test Approval (FTA) does not 
    constitute an irrevocable determination that the Postal Service is 
    satisfied with the revenue-protection capabilities of the product/
    device. After approval is granted to manufacture and distribute a 
    product/device, no change affecting the basic features or safeguards of 
    a product/device may be made except as authorized or ordered by the 
    Postal Service in writing from the Manager, Metering Technology 
    Management.
        C. The Provider may continue with the product submission process 
    upon receipt of authorization to proceed from the Postal Service.
    
    1.10. Provider/Product Approval (Full Distribution)
    
        A. Upon receipt of the final certificate of evaluation from the 
    national laboratory, where required, and after obtaining positive 
    results of internal testing of the product/device, successful 
    completion of Provider infrastructure testing, Alpha testing, 
    demonstration of limited distribution activities (Beta testing), and 
    audits of Provider site security, the Postal Service will 
    administratively review the submitted product, the Provider 
    infrastructure, and the Provider/manufacturer qualification 
    requirements for final approval of full distribution. In preparation 
    for the administrative review, the Provider shall update any product 
    submission documentation submitted in compliance with the requirements 
    of the Postage Evidencing Product Submission Procedure that is no 
    longer accurate with respect to the product in review.
    
        Note: Copies of Draft 39 CFR Part 502 containing IBIP Provider/
    Manufacturer qualification requirements as published in the Federal 
    Register on September 2, 1998, are available by contacting USPS, 
    Metering Technology Management, 475 L'Enfant Plaza SW, Room 8430, 
    Washington DC 20260-2444. Copies of CFR Part 501 pertaining to 
    postage meters are available also at the above address.
    
        B. The Postal Service may require, at any time, that models/
    versions of approved products, and the design and user manuals and 
    specifications applicable to such product, and any revisions thereof, 
    be deposited with the Postal Service.
    
    2. Change Control Procedure
    
    2.1. Overview
    
        A. After approval is granted to manufacture and distribute a 
    product/device, no change affecting the basic features or safeguards of 
    a product/device may be made except as authorized or ordered by the 
    Postal Service in writing from the Manager, Metering Technology 
    Management. The submission of a change proposal and the subsequent test 
    and acceptance of a product change are designed to ensure not only that 
    the changed product meets all requirements and performance criteria but 
    also that the stated changes made to a product do not introduce any 
    unintended, unidentified, unexpected, or undesirable changes to the 
    form, fit, function, or security of the product.
        B. Once a postage evidencing product/device has received final 
    approval from the Postal Service, the Provider is required to submit 
    any change(s) to that product for Postal Service approval. Changes 
    covered by this process include, but are not limited to, the following:
    
    (1) Changes to the form, fit, function, or security of the product/
    device
    (2) Changes resulting from new Postal Service regulations, such as an 
    updated postal rate table
    (3) Changes to the software or firmware
    (4) Changes to the PSD, for products using such a device
    (5) Changes to the physical configuration of the product
    (6) Changes to product documentation or packaging
    (7) Changes to product distribution methods
    (8) Changes to third-party providers of significant product components
    
        C. For an IBI product, the changed product shall be in compliance 
    with the IBI performance criteria and all other Postal Service 
    regulations in effect at the time the change is implemented. All 
    changes to previously approved products must be approved by the Postal 
    Service before implementation. The Postal Service must also approve the 
    timetable and procedures for implementing changes.
        D. Providers are encouraged to consolidate multiple changes in a 
    single change proposal to enable the Postal Service to expedite their 
    review of the changes.
        E. The Provider shall fully document all changes, in accordance 
    with the requirements described in the following sections.
    
    2.2. Provider Responsibilities
    
        A. The Provider shall be responsible for notifying the Postal 
    Service of any
    
    [[Page 44765]]
    
    proposed changes made as described in Section 2.1. The Provider shall 
    be responsible for having a Postal Service-approved process for 
    configuration management of the versions of each approved product. The 
    Provider's process shall ensure that no changes can be made without 
    proper tracing of design changes, records of authorization, and 
    notification to the Postal Service. The Provider is responsible for 
    submitting a change proposal in accordance with the requirements of 
    this procedure and for achieving Postal Service approval before 
    implementing any change.
        B. Detailed Provider Actions:
        (1) Letter of Intent to Change. The first step in the submission of 
    a change proposal is to submit a Letter of Intent to Change, similar to 
    the Letter of Intent described under Product Submission Procedures, 
    above. The Letter of Intent to Change shall be submitted to the 
    Manager, Metering Technology Management, United States Postal Service, 
    475 L'Enfant Plaza SW, Room 8430, Washington DC 20260-2444. The letter 
    must include:
        (a) Date of correspondence.
        (b) Name and address of all parties involved in the change 
    proposal, including those responsible for assembly, distribution, 
    management of the product/device, hardware/firmware/software 
    development or testing, and other organizations involved (or expected 
    to be involved) with the changed product.
        (c) Name and phone number of official point of contact for each 
    party identified above.
        (d) Change concept narrative. A description of the proposed change, 
    identifying any changes to the form, fit, function, or security of the 
    product.
        (e) Discussion of the reasons for the change.
        (f) Discussion of the implications of the change for product 
    security, product identification, and Provider procedures such as 
    distribution, operations, or financial transactions, as well as any 
    cost impact and impact on product customers. The document shall also 
    discuss the impact of the change on Postal procedures such as mail 
    entry, mail acceptance, and mail processing, as well as the impact on 
    the interfaces between the Provider and the Postal Service and/or 
    customers.
        (g) An outline of the actions the Provider will take in support of 
    the change proposal, including a listing of the documentation the 
    Provider will submit in support of the change, and the testing that 
    will be performed to ensure the changes meet Postal Service 
    requirements.
        (h) The timetable for submission, test, acceptance, and 
    implementation of the proposed change.
        (i) The procedure for implementation of the proposed change.
        (2) Additional documentation. Once the Letter of Intent to Change 
    is submitted, the Provider shall review the following documents and 
    submit any changes needed to ensure they are still current. Additional 
    documentation may be required at the discretion of the Postal Service.
    
    (a) Nondisclosure Agreements
    (b) Concept of Operations
    (c) Software and Documentation
    (d) Provider Infrastructure Plan
    (e) USPS Address Matching System (AMS) CD-ROM Integration, if required 
    for the product.
    
        (3) Testing. The Provider will test the product changes as 
    described in the Postage Evidencing Product Submission Procedures to 
    the extent required by the proposed change, in accordance with Postal 
    Service direction. The Provider shall document the tests performed on 
    product changes and shall submit this documentation along with 
    verification of successful completion of the testing.
    
    2.3. Postal Service Responsibilities
    
        A. The Postal Service will execute its responsibilities in a timely 
    manner.
        B. The Postal Service will review the Letter of Intent to Change 
    and accept or reject each component of the Provider's proposed approach 
    for product change, documentation submittal and testing, and schedule 
    for release.
        C. The Postal Service will complete testing of the changes as 
    required to ensure the changes meet Postal Service performance criteria 
    and provide written comments to the Provider. Approval of the change 
    will be granted in writing by the Postal Service by the Manager, 
    Metering Technology Management.
        D. The Postal Service reserves the right to determine if a proposed 
    change is extensive enough to constitute a new product, rather than a 
    change to a previously approved product. If such a determination is 
    made, the Provider shall comply with all requirements of the Postage 
    Evidencing Product Submission Procedures, including field testing.
    
    3. Intellectual Property and License Considerations
    
        A Provider is responsible for determining if and how it can make 
    products that meet the Postal Service performance criteria or 
    specifications applicable to the given product/device, in view of 
    applicable technical, commercial, and legal constraints. Thus, it is 
    the Provider-not the Postal Service-who is responsible for determining 
    whether the production and use of a product/device requires the use of 
    patented technology. If so, the Provider is responsible for resolving 
    applicable intellectual property issues.
        In accordance with this policy, the Postal Service generally will 
    not evaluate or arbitrate conflicting patent claims by Providers, 
    publicly assess the validity or scope of the patents that have been 
    cited with respect to any performance criteria, or offer any opinion as 
    to whether a license is required under such patents to meet performance 
    criteria.
        Each Provider should seek its own legal counsel with respect to 
    these matters, and, if it determines that a patent license is required, 
    should procure one. Companies that are unwilling or unable to acquire 
    any necessary patent licenses to produce their proposed product should 
    assess the wisdom of remaining in the market or the possibility of 
    producing a different type of product.
        To implement this policy, the Postal Service may enter into an 
    agreement (``Agreement'') with the Provider stating that the Provider 
    is solely responsible for determining, on an ongoing basis, whether its 
    approved products are subject to any third-party patents. If so, the 
    Provider must procure any required licenses to allow the Provider to 
    make, use, sell, or (if applicable) import its products, and to allow 
    the Provider's customers to use the products to create postage indicia, 
    apply the indicia to mail, and deposit the mail with the Postal 
    Service.
        Providers would not be responsible under such an Agreement for 
    procuring any license rights with respect to mailing activities 
    conducted by the Postal Service. However, each Provider is required to 
    indemnify the Postal Service for any claims against the Postal Service 
    based on the Provider's failure to procure necessary patent or other 
    rights with respect to its product offering.
    
    4. Request for Comment
    
        It is emphasized that the proposed procedures for initial product 
    submission and changes to already approved products are being published 
    for comments and are subject to final definition.
        Although exempt from the notice and comment requirements of the 
    Administrative Procedure Act (5 U.S.C. 553 (b), (c)) regarding proposed 
    rule making by 39 U.S.C. 410 (a), the Postal
    
    [[Page 44766]]
    
    Service invites public comments on the proposed procedures.
    Stanley F. Mires,
    Chief Counsel, Legislative.
    [FR Doc. 99-21242 Filed 8-16-99; 8:45 am]
    BILLING CODE 7710-12-P
    
    
    

Document Information

Published:
08/17/1999
Department:
Postal Service
Entry Type:
Notice
Action:
Proposed Procedure.
Document Number:
99-21242
Dates:
Comments must be received on or before October 18, 1999.
Pages:
44760-44766 (7 pages)
PDF File:
99-21242.pdf