E9-19602. Clean River Power MR-8, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications  

  • Start Preamble August 6, 2009.

    On March 25, 2009, Clean River Power MR-8, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Zanesville Lock and Dam Water Power Project, to be located at the State of Ohio's Zanesville lock and dam on the Muskingum River in Muskingum County, Ohio.

    The proposed Zanesville Lock and Dam Project would consist of: (1) The existing 12-foot-high, 514-foot-long concrete dam; (2) the existing 470-acre reservoir with a 3,410 acre-foot storage capacity; (3) a new 150-foot-long, 75-foot-wide intake structure; (4) a 150-foot-long, 75-foot-wide power canal; (5) a new powerhouse containing three proposed generating units with a total installed capacity of 4.0 megawatts; (6) a new 500-foot-long tailrace; (7) a new switchyard containing a single three-phase step-up transformer; and (8) a new 100-foot-long, 34.5-kilovolt overhead transmission line. The project would have an estimated average annual generation of 15,900 megawatt-hours.

    Applicant Contact: Mr. Alan Skelly, 8425 Beechmont Avenue, Cincinnati, OH 45255, phone (513) 375-9242.

    FERC Contact: Michael Spencer, (202) 502-6093.

    Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the “e-Filing” link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission's Web site located at http://www.ferc.gov/​filing-comments.asp. More information about this project can be viewed or printed on the “eLibrary” link of Commission's Web site at http://www.ferc.gov/​docs-filing/​elibrary.asp. Enter the docket number (P-13412) in the docket number field to access the document. For assistance, call toll-free 1-866-208-3372.

    Start Signature

    Nathaniel J. Davis, Sr.,

    Deputy Secretary.

    End Signature End Preamble

    [FR Doc. E9-19602 Filed 8-14-09; 8:45 am]

    BILLING CODE P

Document Information

Comments Received:
0 Comments
Published:
08/17/2009
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
E9-19602
Pages:
41416-41416 (1 pages)
Docket Numbers:
Project No. 13412-000
EOCitation:
of 2009-08-06
PDF File:
e9-19602.pdf