[Federal Register: August 18, 1994]
-----------------------------------------------------------------------
DEPARTMENT OF AGRICULTURE
Rural Electrification Administration
South Mississippi Electric Power Association; Notice of Intent To
Hold Scoping Meeting and Prepare an Environmental Assessment and/or
Environmental Impact Statement
AGENCY: Rural Electrification Administration, USDA.
ACTION: Notice of Intent to Hold Scoping Meeting and Prepare an
Environmental Assessment and/or Environmental Impact Statement.
-----------------------------------------------------------------------
SUMMARY: Notice is hereby given that the Rural Electrification
Administration (REA), pursuant to the National Environmental Policy Act
of 1969 (NEPA) (42 U.S.C. 4321 et seq.), the Council on Environmental
Quality (CEQ) Regulations for Implementing NEPA (40 CFR Parts 1500-
1508), and REA Environmental Policies and Procedures (7 CFR Part 1794)
may prepare an Environmental Assessment and/or an Environmental Impact
Statement (EIS) for its Federal action related to a proposal by South
Mississippi Electric Power Association to construct a 230 kV
transmission line. REA may provide financing assistance to South
Mississippi Electric Power Association for project construction costs.
DATES: REA will conduct a scoping meeting in an open house forum as
follows: Paulding, Mississippi, September 21, 1994, 7-9:30 p.m.
ADDRESSES: Jasper County Courthouse, Highway 503, Paulding,
Mississippi.
FOR INFORMATION CONTACT: Lawrence R. Wolfe, Chief, Environmental
Compliance Branch, Electric Staff Division, room 1246, South
Agriculture Building, Rural Electrification Administration, Washington,
DC 20250, telephone (202) 720-1784.
SUPPLEMENTARY INFORMATION: South Mississippi Electric Power Association
proposes to construct a 230 kV transmission line from an existing
substation located west of Waynesboro in Wayne County, Mississippi,
through the southwest corner of Clarke County, Mississippi, to the
eastern part of Jasper County, Mississippi, where South Mississippi
Electric Power Association will construct a 230/69 kV substation near
the community of Missionary. The total length of the line will be 36
miles. Additions will be necessary at the existing substation west of
Waynesboro to accommodate the new transmission line.
Alternatives to be considered by REA and South Mississippi Electric
Power Association include: (a) no action, (b) adding new capacitor
banks at other substations on South Mississippi Electric Power
Association's transmission system, (c) constructing a 230/161 kV
substation near Homewood, Mississippi, a 230/69 kV substation near
Missionary, Mississippi, and 29 miles of 230 kV transmission line from
Homewood to Missionary, and (d) alternative transmission line routes.
To be presented at the public scoping meeting will be an
alternative evaluation and macro-corridor study prepared by South
Mississippi Electric Power Association. The alternative evaluation and
macro-corridor study is available for public review at REA at the
address provided in this notice or at South Mississippi Electric Power
Association, 7037 U.S. Highway 49, Hattiesburg, Mississippi. It can
also be reviewed at the Mary Weems Parker Memorial Library, in
Heidelberg, Mississippi, the East Mississippi Regional Library, 116
Water Street, Quitman, Mississippi, and the Waynesboro Library, 712
Wayne Street, Waynesboro, Mississippi.
Government agencies, private organizations, and the public are
invited to participate in the planning and analysis of the proposed
project. Representatives from REA and South Mississippi Electric Power
Association will be available to discuss REA's environmental review
process, describe the project and alternatives under consideration,
discuss the scope of environmental issues to be considered, answer
questions, and accept oral and written comments. Written comments will
be accepted for at least 30 days after the September 21 public scoping
meeting. Written comments should be sent to REA at the address provided
in this notice.
From information provided in the alternative evaluation and macro-
corridor study, input from government agencies, private organizations,
and the public, South Mississippi Electric Power Association will
prepare an environmental analysis to be submitted to REA for review. If
significant effects are not evident based on a review of the
environmental analysis and other relevant information, REA will prepare
an environmental assessment to determine if the preparation of an EIS
is warranted.
Should REA determine that the preparation of an EIS is not
warranted, it will prepare a finding of no significant impact (FONSI).
The FONSI will be made available for public review and comment for 30
days. REA will not take its final action related to the project prior
to the expiration of the 30-day period.
Any final action by REA related to the proposed project will be
subject to, and contingent upon, compliance with all relevant Federal
environmental laws and regulations and completion of environmental
procedures as prescribed by CEQ and REA environmental policies and
procedures.
Dated: August 12, 1994.
Adam M. Golodner,
Deputy Administrator--Program Operations.
[FR Doc. 94-20307 Filed 8-17-94; 8:45 am]