95-20572. Environmental Impact Statements and Regulations; Availability of EPA Comments  

  • [Federal Register Volume 60, Number 160 (Friday, August 18, 1995)]
    [Notices]
    [Pages 43146-43147]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-20572]
    
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    [ER-FRL-4725-8]
    
    
    Environmental Impact Statements and Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared July 03, 1995 Through July 
    07, 1995 pursuant to the Environmental Review Process (ERP), under 
    Section 309 of the Clean Air Act and Section 102(2)(c) of the National 
    Environmental Policy Act as amended. Requests for copies of EPA 
    comments can be directed to the Office of Federal Activities at (202) 
    260-5076.
        An explanation of the ratings assigned to draft environmental 
    impact statements (EISs) was published in FR dated April 14, 1995 (60 
    FR 19047).
    
    Draft EISs
    
        ERP No. D-AFS-J65236-MT Rating EC2, North Fork Decision Area Fire 
    Recovery Project, Timber Salvage, Implementation, Kootenai National 
    Forest, Rexford Ranger District, Lincoln County, MT.
        Summary: EPA expressed environmental concerns about the potential 
    impacts of the proposed action on the watershed of the North Fork of 
    Big Creek where the majority of activities are proposed. Peak stream 
    flow thresholds are already being exceeded here and EPA suggested 
    additional information be supplied to fully assess and mitigate all 
    potential environmental impacts.
        ERP No. D-AFS-K65170-AZ Rating EO2, Pocket/Baker Ecosystem and Land 
    Management Plan, Implementation, Mogollen Rim, Coconino National 
    Forest, Coconino County, AZ.
        Summary: EPA expressed environmental objections to the components 
    of the preferred alternative which exceed management activity 
    thresholds in the draft Mexican Spotted Owl (MOS) Recovery Plan and 
    dispersal habitat guidelines. The draft EIS does not adequately 
    evaluate potential impacts to water quality and air quality.
        ERP No. D-AFS-L65244-ID Rating EC2, Fall Creek Post-Fire Project, 
    Harvesting Fire-Killed and Damage Trees, Implementation, McCall Ranger 
    District, Payette National Forest, Valley County, ID.
        Summary: EPA expressed environmental concerns based on potential 
    effects on water quality from timber salvage and road construction. 
    Additional information is needed on watershed effects, water supply, 
    water quality/fish habitat effectiveness 
    
    [[Page 43147]]
    monitoring and documentation for environmental effect predictions.
        ERP No. D-GSA-K80036-CA Rating EC2, Fresno--United States 
    Courthouse, Site Selection and Construction, City of Fresno, Fresno 
    County, CA.
        Summary: EPA expressed environmental concerns regarding potential 
    Clean Air Act conformity issues, hazardous waste issues and energy 
    efficiency/water conservation issues. EPA recommended that these issues 
    be clarified in the final document.
        ERP No. D-IBR-K34010-AZ Rating EO2, Tucson Aqueduct System 
    Reliability Investigation (TASRI), Central Arizona Project, Surface 
    Storage Reservoir Construction, COE Section 404 Permit, Gila River, 
    City of Tucson, Pima County, AZ.
        Summary: EPA expressed environmental objections over potential 
    impact to the proposed action in light of recent Tucson reevaluation of 
    use of CAP water. EPA also requested additional information concerning 
    the habitat for the Pima pineapple cactus and would incur other 
    biological and water quality impacts.
        ERP No. D-NPS-K61137-AZ Rating EO2, Organ Pipe Cactus National 
    Monument General Management Plan and Development Concept Plan 
    Implementation, Portion of the Sonoran Desert, Pima County, AZ.
        Summary: EPA expressed environmental objections based on the lack 
    of an analysis of a full range of alternatives and that there is 
    inadequate discussion of impacts to the resources and respective 
    mitigation measures.
        ERP No. D-NPS-L61201-WA Rating EC2, Mountain Goat Management Within 
    Olympic National Park, Implementation, Clallan, Grays Harbor, Jefferson 
    and Mason Counties, WA.
        Summary: EPA expressed environmental concerns with the lack of 
    coordination of goat management efforts in and outside the park. The 
    final EIS should define overall ecosystem management objections 
    including minimizing impacts associated with control programs, further 
    addressing mitigation of impacts from helicopter overflights and 
    alternatives to using helicopters, and better defining the evaluation 
    criteria.
    
    Final EISs
    
        ERP No. F-AFS-K65168-CA, Falls Road Realignment and Reconstruction, 
    Permit Approval, San Bernardino National Forest, San Bernardino County, 
    CA.
        Summary: Review of the final EIS was not deemed necessary. No 
    formal comment letter was sent to the preparing agency.
        ERP No. F-FHW-L40189-WA, WA-525/Paine Field Boulevard Project, 
    Improvements, between WA-99 to WA-526, Funding and COE Section 404 
    Permit, City of Mukitteo, Snohomish County, WA.
        Summary: EPA had no objection to the project as proposed.
        ERP No. F-HUD-J81007-UT, Guadalupe Neighborhood Project, 
    Demolition, Rehabilitation, Construction and Development, Funding, Salt 
    Lake City, Salt Lake City County, UT.
        Summary: EPA had no objection to the action as proposed.
        ERP No. FS-FHW-K40105-CA, Devil's Slide Bypass Improvements, CA-1 
    To Half Moon Bay Airport to Linda Mar Boulevard, Funding and COE 
    Section 404 Permit, Pacifica and San Mateo Counties, CA.
        Summary: Review of the final EIS was not deemed necessary. No 
    formal comment letter was sent to the preparing agency.
    
    Regulations
    
        ERP No. R-BIA-A99203-00, Notice of Proposed Revised Procedures 
    Implementing the National Environmental Policy Act (NEPA) for the 
    Bureau of Indian Affairs.
        Summary: EPA commented that BIA should seek the cooperation of the 
    EPA in NEPA review of commercial waste disposal facilities on Indian 
    lands, and recommended that BIA should define its categorical 
    exclusions more narrowly.
    
        Dated: August 15, 1995.
    William D. Dickerson,
    Director, NEPA Compliance Division, Office of Federal Activities.
    [FR Doc. 95-20572 Filed 8-17-95; 8:45 am]
    BILLING CODE 6560-50-U
    
    

Document Information

Published:
08/18/1995
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
95-20572
Pages:
43146-43147 (2 pages)
Docket Numbers:
ER-FRL-4725-8
PDF File:
95-20572.pdf