97-21753. El Paso Natural Gas Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 62, Number 159 (Monday, August 18, 1997)]
    [Notices]
    [Page 44002]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-21753]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP97-684-000]
    
    
    El Paso Natural Gas Company; Notice of Request Under Blanket 
    Authorization
    
    August 12, 1997.
        Take notice that on August 6, 1997, El Paso Natural Gas Company (El 
    Paso), P.O. Box 1492, El Paso, Texas 79978, filed in Docket No. CP97-
    684-000 a request pursuant to Sections 157.205 and 157.212 of the 
    Commission's Regulations under the Natural Gas Act (18 CFR 157.205, 
    157.212) for authorization to upgrade the existing Deming Industrial 
    Park Meter Station, located in Luna County, New Mexico, thereby 
    permitting additional firm deliveries of natural gas to the City of 
    Deming, New Mexico (Deming), under El Paso's certificate issued in 
    Docket No. CP82-435-000, pursuant to Section 7(c) of the Natural Gas 
    Act, all as more fully set forth in the request that is on file with 
    the Commission and open to public inspection.
        El Paso proposes to upgrade the existing Deming Industrial Park 
    Meter Station, located in Section 7, Township 24 South, Range 8 West, 
    Luna County, New Mexico, by adding one 2-inch O.D. senior orifice meter 
    and modifying the existing EFM for dual run capability. El Paso states 
    the upgraded metering facilities, upon completion, will have a maximum 
    peak day capacity of 1,800 Mcf of natural gas. El Paso asserts that it 
    has sufficient mainline peak day capacity to transport and deliver such 
    gas volumes without detriment or disadvantage to El Paso's other 
    customers.
        El Paso states that Deming will reimburse them for the costs 
    related to the upgrade of the Deming Industrial Park Meter Station, 
    estimated to be $17,300, including respective overhead and contingency 
    fees.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 97-21753 Filed 8-15-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
08/18/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-21753
Pages:
44002-44002 (1 pages)
Docket Numbers:
Docket No. CP97-684-000
PDF File:
97-21753.pdf