97-21754. Williston Basin Interstate Pipeline Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 62, Number 159 (Monday, August 18, 1997)]
[Notices]
[Page 44005]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-21754]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP97-686-000]
Williston Basin Interstate Pipeline Company; Notice of Request
Under Blanket Authorization
August 12, 1997.
Take notice that on August 7, 1997, Williston Basin Interstate
Pipeline Company (Williston), 200 North Third Street, Suite 300,
Bismarck, ND 58501, filed in Docket No. CP97-686-000 a request pursuant
to Sections 157.205 and 157.216(b) of the Commission's Regulations
under the Natural Gas Act (18 CFR 157.205 and 157.216) for approval to
abandon 4,280 feet of four-inch lateral pipeline located in Richland
County, MT, under Wiliston's blanket certificate issued in Docket No.
CP82-487-000 et al., pursuant to Section 7(c) of the Natural Gas Act
(NGA), all as more fully set forth in the request which is on file with
the Commission and open to public inspection.
Williston asserts that the pipeline proposed to be abandoned herein
was originally constructed in 1978 to allow the receipt of gas from a
supplier at the Petrolane-Perry Gas Processing Company Plant (Plant)
and/or to deliver natural gas to the supplier to be used as field fuel.
Williston further asserts that the Plant was shut down in the early
1980's and that Williston has not received natural gas from the Plant
since 1983 or made deliveries of natural gas through this pipeline
since 1993. Williston thus proposes to purge this pipeline and abandon
it in place.
Any person or the Commission's Staff may, within 45 days of the
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Rules of Practice and Procedure (18 CFR
385.214), a motion to intervene and pursuant to Section 157.205 of the
regulations under the Natural Gas Act (18 CFR 157.205), a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activities shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 97-21754 Filed 8-15-97; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 08/18/1997
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 97-21754
- Pages:
- 44005-44005 (1 pages)
- Docket Numbers:
- Docket No. CP97-686-000
- PDF File:
-
97-21754.pdf