2016-19099. Notice of Draft National Pollutant Discharge Elimination System (NPDES) General Permit for the Eastern Portion of the Outer Continental Shelf (OCS) of the Gulf of Mexico (GEG460000); Availability of Draft Environmental Assessment  

  • Start Preamble

    AGENCY:

    Environmental Protection Agency (EPA).

    ACTION:

    Notice of Proposed Reissuance of NPDES General Permit, Notice to States of Mississippi, Alabama and Florida for Consistency Review with approved Coastal Management Programs.

    SUMMARY:

    The Regional Administrator of EPA Region 4 (the “Region”) is today proposing to reissue the National Start Printed Page 55197Pollutant Discharge Elimination System (NPDES) general permit for the Outer Continental Shelf (OCS) of the Gulf of Mexico (General Permit No. GEG460000) for discharges in the Offshore Subcategory of the Oil and Gas Extraction Point Source Category. The draft permit pertains to discharges from exploration, development, and production facilities located in and discharging, to all Federal waters of the eastern portion of the Gulf of Mexico seaward of the outer boundary of the territorial seas, and covers existing and new source facilities with operations located on Federal leases occurring in water depths seaward of 200 meters, occurring offshore the coasts of Alabama and Florida. The western boundary of the coverage area is demarcated by Mobile and Visoca Knoll lease blocks located seaward of the outer boundary of the territorial seas from the coasts of Mississippi and Alabama. Individual permits will be issued for operating facilities on lease blocks traversed by and shoreward of the 200 meter water depth.

    As proposed, this Draft NPDES general permit includes, best conventional pollutant control technology (BCT), and best available technology economically achievable (BAT) limitations for existing sources and new source performance standards (NSPS) limitations for new sources as promulgated in the effluent guidelines for the offshore subcategory. The draft permit also includes the following changes to the expired permit: (1) New electronic reporting requirements; (2) new whole effluent toxicity testing sampling and reporting requirements for well treatment, completion, and workover fluids not discharged with produced wastewaters; (3) requirements to submit additional information pertaining to the chemicals and additives used in well treatment, completion and workover operations; and (4) clarification regarding types of operators. Region 4 is also making available a Draft Environmental Assessment (EA) for review during the 30 day public comment period for this general permit. The Draft EA addresses potential impacts from proposed changes to the general permit, and it considers recent technical studies.

    DATES:

    Comments must be received by September 17, 2016.

    ADDRESSES:

    The Draft NPDES general permit, permit fact sheet, Draft EA and other relevant documents are on file and may be inspected any time between 8:15 a.m. and 4:30 p.m., Monday through Friday at the address shown below. Copies of the Draft NPDES general permit, permit fact sheet, Draft EA and other relevant documents may be obtained by writing the U.S. EPA-Region 4, Water Protection Division (WPD), NPDES Section, Sam Nunn Atlanta Federal Center, 61 Forsyth Street SW., Atlanta, Georgia 30303-8960, Attention: Ms. Bridget Staples, or by calling (404) 562-9783. Alternatively, copies of the Draft NPDES general permit, permit fact sheet, Draft EA, Essential Fish Habitat Determination and preliminary Ocean Discharge Criteria Evaluation may be downloaded at: http://www.epa.gov/​aboutepa/​about-epa-region-4-southeast. Submit comments to the WPD, U.S. EPA-Region 4, NPDES Permitting Section, Sam Nunn Atlanta Federal Center, 61 Forsyth Street SW., Atlanta, GA 30303-8960, Attention: Ms. Bridget Staples.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Ms. Bridget Staples, EPA Region 4, WPD, NPDES Section, by mail at the Atlanta address given above, by telephone at (404) 562-9783 or by email at Staples.Bridget@epa.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    I. Procedures for Reaching a Final Permit Decision

    Pursuant to 40 CFR 124.13, any person who believes any condition of the permit is inappropriate must raise all reasonably ascertainable issues and submit all reasonably available arguments in full, supporting their position, by the close of the comment period. All comments on the Draft NPDES general permit and the Draft EA received within the 30-day comment period will be considered in the formulation of final determination regarding the National Environmental Policy Act (NEPA) review and the permit reissuance. After consideration of all written comments and the requirements and policies in the CWA and appropriate regulations, the EPA Regional Administrator will make a determination regarding the Final EA, Finding of No Significant Impact, and permit reissuance. If the determination results in a permit that is substantially unchanged from the draft permit announced by this notice, the Regional Administrator will so notify all persons submitting written comments. If the determination results in a permit that is substantially changed, the Regional Administrator will issue a public notice indicating the revised determination.

    A formal hearing is available to challenge any NPDES permit issued according to the regulations at 40 CFR 124.15 and 124.19, except for a general permit, as provided at 40 CFR 124.19(o). Persons affected by a general permit may not challenge the conditions of a general permit as a right in further Agency proceedings. They may instead either challenge the general permit in court, or apply for an individual permit as authorized at 40 CFR 122.28, in accordance with the application requirements set forth at 40 CFR 122.21, and then request a formal hearing on the issuance or denial of an individual permit. Additional information regarding these procedures is available by contacting Mr. Paul Schwartz, Associate Regional Counsel, Office of Regional Counsel, at (404) 562-9576.

    II. Procedures for Obtaining General Permit Coverage

    Notice of Intent requirements for obtaining coverage for operating facilities are stated in Part I Section A.4 of the general permit. Coverage under the reissued general permit is effective upon receipt of notification of coverage with an assignment of an NPDES general permit number from the EPA-Region 4, Director of the Water Protection Division. EPA will act on the Notice of Intent (NOI) within a reasonable period of time.

    III. Exclusion of Non-Operational Leases

    This permit does not apply to non-operational leases, i.e., those on which no discharge has taken place in the two (2) years prior to the effective date of the reissued general permit. EPA will not initially accept NOIs for such leases, and the general permit will not cover such leases, except as set forth below. Non-operational leases will lose coverage under the previous general permit on the effective date of the reissued general permit. No subsequent exploration, development or production activities may take place on these leases until and unless the lessee has obtained coverage under the new general permit or an individual permit. EPA will not accept an NOI or individual permit application for non-operational or new acquired leases until such time as an Exploration Plan Document or the Development Operations Coordination Document has been prepared and submitted to Bureau of Energy Management.

    IV. State Water Quality Certification

    Because state waters are not included in the area covered by the OCS general permit, its effluent limitations and monitoring requirements are not subject to state water quality certification under CWA Section 401. However, the states of Alabama, Florida and Mississippi have been provided a copy of this draft Start Printed Page 55198general permit, Draft EA to review and submit comments. Copies of these documents have also been provided to EPA Headquarters for their review.

    V. State Consistency Determination

    This Notice will also serve as Region 4's requirement under the Coastal Zone Management Act (CZMA) to provide all necessary information for the States of Mississippi, Alabama and Florida to review this action for consistency with their approved Coastal Zone Management Programs. A copy of the consistency determination on the proposed activities is being sent to each affected State, along with a letter including this FR notice, which provides the EPA Web site where electronic copies can be obtained of the Draft NPDES general permit, permit fact sheet, preliminary Ocean Discharge Criteria Evaluation, and Draft EA. Other relevant information for their review is available upon request from each State. Comments regarding State Consistency are invited in writing within 30 days of this notice to the WPD, U.S. EPA-Region 4, NPDES Section, Sam Nunn Atlanta Federal Center, 61 Forsyth Street SW., Atlanta, GA 30303-8960, Attention: Ms. Bridget Staples.

    VI. Public Comment Period and Public Hearings

    The public comment period for the Draft NPDES permit, Draft EA will begin on the date of publication of this notice in the Federal Register and end 30 calendar days later.

    VII. Administrative Record

    The Draft NPDES general permit, permit fact sheet, Draft EA and other relevant documents are on file and may be inspected any time between 8:15 a.m. and 4:30 p.m., Monday through Friday at the address shown below. Copies of the Draft NPDES general permit, permit fact sheet, Draft EA and other relevant documents may be obtained by writing the U.S. EPA-Region 4, WPD, NPDES Permitting Section, Sam Nunn Atlanta Federal Center, 61 Forsyth Street SW., Atlanta, GA 30303-8960, Attention: Ms. Bridget Staples, or by calling (404) 562-9783. Alternatively, copies of the Draft NPDES general permit, permit fact sheet, Draft EA, Essential Fish Habitat Determination and preliminary Ocean Discharge Criteria Evaluation may be downloaded at: http://www.epa.gov/​aboutepa/​about-epa-region-4-southeast.

    VIII. Executive Order 12866

    Under Executive Order 12866 (58 FR 51735 (October 4, 1993)) the Agency must determine whether the regulatory action is “significant” and therefore subject to Office of Management and Budget (OMB) review and the requirements of the Executive Order. The Order defines “significant regulatory action” as one that is likely to result in a rule that may: (1) Have an annual effect on the economy of $100 million or more or adversely affect in a material way the economy, a sector of the economy, productivity, competition, jobs, the environment, public health, or safety, or State, local, or Tribal governments or communities; (2) create a serious inconsistency or otherwise interfere with an action taken or planned by another agency; (3) materially alter the budgetary impact of entitlements, grants, user fees, or loan programs or the rights and obligations of recipients thereof; or (4) raise novel legal or policy issues arising out of legal mandates, the President's priorities, or the principles set forth in the Executive Order. OMB has exempted review of NPDES general permits under the terms of Executive Order 12866.

    IX. Regulatory Flexibility Act

    The Regulatory Flexibility Act (RFA) generally requires an agency to prepare a regulatory flexibility analysis of any rule subject to notice and comment rule making requirements under the Administrative Procedures Act (APA) or any other statute, unless the agency certifies that the rule will not have a significant economic impact on a substantial number of small entities. Small entities include small businesses, small organizations, and small governmental jurisdictions.

    Issuance of an NPDES general permit is not subject to rule making requirements, including the requirement for a general notice of proposed rule making, under APA Section 533 or any other law, and is thus not subject to the RFA requirements.

    The APA defines two broad, mutually exclusive categories of agency action—“rules” and “orders.” APA Section 551(4) defines rule as “an agency statement of general or particular applicability and future effect designed to implement, interpret or prescribe law or policy or describing the organization, procedure, or practice or requirements of an agency . . . ” APA Section 551(6) defines orders as “a final disposition . . . of an agency in a matter other than rule making but including licensing.” APA Section 551(8) defines “license” to “include . . . an agency permit . . . ” The APA thus categorizes a permit as an order, which by the APA's definition is not a rule. Section 553 of the APA establishes “rule making” requirements. APA Section 551(5) defines “rule making” as “the agency process for formulating, amending, or repealing a rule.” By its terms, Section 553 applies only to rules and not to orders, exempting by definition permits.

    X. Unfunded Mandates Reform Act

    Title II of the Unfunded Mandates Reform Act of 1995 (UMRA), Public Law 104-4, establishes requirements for Federal agencies to assess the effects of their “regulatory actions” to refer to regulations. (See, e.g., UMRA Section 401, “Each agency shall . . . assess the effects of Federal regulatory actions . . . (other than to the extent that such regulations incorporate requirements specifically set forth in law).”) UMRA Section 102 defines “regulation” by reference to 2 U.S.C. 658 which in turn defines “regulation” and “rule” by reference to Section 601(2) of the RFA. That section of the RFA defines “rule” as “any rule for which the agency publishes a notice of proposed rule making pursuant to Section 553(b) of the APA, or any other law.”

    As discussed in the RFA section of this notice, NPDES general permits are not “rules” by definition under the APA and thus not subject to the APA requirement to publish a notice of proposed rule making. NPDES general permits are also not subject to such a requirement under the CWA. While EPA publishes a notice to solicit public comment on draft general permits, it does so pursuant to the CWA Section 402(a) requirement to provide an opportunity for a hearing. Therefore, NPDES general permits are not “rules” for RFA or UMRA purposes.

    XI. Paperwork Reduction Act

    The information collection required by this permit has been approved by OMB under the provisions of the Paperwork Reduction Act, 44 U.S.C. 3501 et seq., in submission made for the NPDES permit program and assigned OMB control numbers 2040-0086 (NPDES permit application) and 2040-0004 [(NPDES Discharge Monitoring Reports (DMRs)].

    Because this permit is very similar in reporting and application requirements and in discharges which are required to be monitored as the previous Eastern Gulf of Mexico OCS general permit (GEG460000), the paperwork burdens are expected to be nearly identical. When it issued the previous OCS general permit, EPA estimated it would take an affected facility three hours to prepare the request for coverage and 38 hours per year to prepare DMRs. It is estimated that the time required to prepare the request for coverage and DMRs for the reissued permit will be approximately the same.

    Start Signature
    Start Printed Page 55199

    Dated: July 27, 2016.

    James D. Giattina,

    Director, Water Protection Division.

    End Signature End Supplemental Information

    [FR Doc. 2016-19099 Filed 8-17-16; 8:45 am]

    BILLING CODE 6560-50-P