98-22251. Notice of Application Ready for Environmental Analysis  

  • [Federal Register Volume 63, Number 160 (Wednesday, August 19, 1998)]
    [Notices]
    [Page 44433]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-22251]
    
    
    
    [[Page 44433]]
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    
    
    Notice of Application Ready for Environmental Analysis
    
    August 13, 1998.
        Take notice that the following hydroelectric application has been 
    filed with the Commission and is available for public inspection:
        a. Type of Application: Minor License.
        b. Project No.: P-11150-000.
        c. Date Filed: May 24, 1991.
        d. Applicant: Cameron Gas and Electric Company.
        e. Name of Project: Smithville and Mix Hodro Project.
        f. Location: On the Grant River, near Eaton Rapids, in Eaton 
    County, Michigan.
        g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
        h. Applicant Contact: Ms. Jan Marie Evans, 4121 Okemos Road, Suite 
    23, Okemos, MI 48864, (517) 347-4048.
        i. FERC Contact: William Guey-Lee (202) 219-2808.
        j. Deadline Date: See paragraph D10.
        k. Status of Environmental Analysis: This application has been 
    accepted for filing and is ready for environmental analysis at this 
    time--see attached paragraph D10.
        l. Description of Project: The existing constructed project 
    consists of the following:
        A. The Mix Development comprising (1) an existing 188-foot-long and 
    7-foot-high dam; (2) an existing 150-acre reservoir having a storage 
    capacity of 500-acre-feet at elevation 184 feet (project datum); (3) a 
    powerhouse containing two generating units for a total installed 
    capacity of 202 kilowatts (kW); (4) an existing 300-foot-long, 15-
    Kilovolt transmission line; and (5) appurtenant facilities.
        B. The Smithville Development comprising (1) an existing 440-foot-
    long and 17-foot-high dam; (2) an existing 80-acre reservoir having a 
    storage capacity of 300-acre-feet at elevation 883.3 feet M.S.L.; (3) a 
    powerhouse containing three generating units for a total installed 
    capacity of 500-kW; (4) an existing 300-foot-long, 15-kV transmission 
    line; and (5) appurtenant facilities.
        The total project capacity would be 702-kW and the total average 
    annual generation for this project would be 3,000 MWh. The dam and 
    existing project facilities are owned by the applicant.
        m. This notice also consists of the following standard paragraphs: 
    A4 and D10.
        n. Available Location of Application: A copy of the application, as 
    amended and supplemented, is available for inspection and reproduction 
    at the Commission's Public Reference and Filed Maintenance Branch, 
    located at 888 First Street, NE, Room 2A-1, Washington, DC 20426, or by 
    calling (202) 208-1371. A copy is also available for inspection and 
    reproduction at Cameron Gas and Electric Company at 4121 Okemos Road, 
    Suite 23, Okemos, MI 48864, or by calling (517) 347-4048.
        A4. Development Application--Public notice of the filing of the 
    initial development application, which has already been given, 
    established the due date for filing competing applications or notices 
    of intent. Under the Commission's regulations, any competing 
    development application must be filed in response to and in compliance 
    with public notice of the initial development application. No competing 
    applications or notices of intent may be filed in response to this 
    notice.
        D10. Filing and Service of Responsive Documents--The application is 
    ready for environmental analysis at this time, and the Commission is 
    requesting comments, reply comments, recommendations, terms and 
    conditions, and prescriptions.
        The Commission directs, pursuant to Section 4.34(b) of the 
    Regulations (see Order No. 533 issued May 8, 1991, 56 FR 23108, May 20, 
    1991) that all comments, recommendations, terms and conditions and 
    prescriptions concerning the application be filed with the Commission 
    within 60 days from the issuance date of this notice. All reply 
    comments must be filed with the Commission within 105 days from the 
    date of this notice.
        Anyone may obtain an extension of time for these deadlines from the 
    Commission only upon a showing of good cause or extraordinary 
    circumstances in accordance with 18 CFR 385.2008.
        All filings must (1) bear in all capital letters the title 
    ``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDATIONS,'' ``TERMS AND 
    CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the 
    name of the applicant and the project number of the application to 
    which the filing responds; (3) furnish the name, address, and telephone 
    number of the persons submitting the filing; and (4) otherwise comply 
    with the requirements of 18 CFR 385.2001 through 385.2005. All 
    comments, recommendations, terms and conditions or prescriptions must 
    set forth their evidentiary basis and otherwise comply with the 
    requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
    application directly from the applicant. Any of these documents must be 
    filed by providing the original and the number of copies required by 
    the Commission's regulations to: The Secretary, Federal Energy 
    Regulatory Commission, 888 First Street, NE, Washington, DC 20426. An 
    additional copy must be sent to Director, Division of Project Review, 
    Office of Hydropower Licensing, Federal Energy Regulatory Commission, 
    at the above address. Each filing must be accompanied by proof of 
    service on all persons listed on the service list prepared by the 
    Commission in this proceeding, in accordance with 18 CFR 4.34(b), and 
    385.2010.
    David P. Boergers,
    Secretary.
    [FR Doc. 98-22251 Filed 8-18-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
08/19/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-22251
Dates:
See paragraph D10.
Pages:
44433-44433 (1 pages)
PDF File:
98-22251.pdf