[Federal Register Volume 64, Number 160 (Thursday, August 19, 1999)]
[Notices]
[Pages 45253-45254]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-21498]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Tendered for Filing With the Commission and
Soliciting Additional Study Requests
August 13, 1999.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: New Major License.
b. Project No.: 2589-024.
c. Date Filed: July 29, 1999.
d. Applicant: Marquette Board of Light and Power.
e. Name of Project: Marquette Hydroelectric Project.
f. Location: On the Dead River near the city of Marquette,
Marquette County, Michigan. The project does not use federal lands.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. David E. Hickey, Marquette Board of Light
and Power, 2200 Wright Street, Marquette, MI 49855, (906) 228-0322.
i. FERC Contact: Any questions on this notice should be addressed
to Lee Emery, E-mail address lee.emery@ferc.fed.us, or telephone 202-
219-2779.
j. Deadline for filing additional study requests: September 27,
1999.
All documents (original and eight copies) should be filed with:
David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE, Washington, DC 20426.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Status of environmental analysis: This application is not ready
for environmental analysis at this time.
l. Description of the Project: The project consists of the
following two existing facilities: The Marquette Development No. 2
includes (1) Forestville Reservoir with a surface area of 110 acres and
a storage volume of 2,900 acre-feet, impounded by (2) a 202-foot-long,
62-foot high, concrete-capped Cyclopean masonry dam with crest
elevation 771.0 feet NGVD, which acts as a spillway under extremely
high flows, with (a) a 197-foot-long concrete retaining wall, (b) a 75-
foot-long training wall, and (c) a 33-foot-wide intake structure, with
inclined trashracks, which discharges into (3) a 90-inch-diameter,
wood-stave penstock, about 4,200 feet long, which conveys the water to
(4) a concrete surge tank. From the surge tank, the water is carried by
(5) two 440-foot-long, 78-inch-diameter steel penstocks to (6)
Powerhouse No. 2, which is a 40-foot by 96-foot reinforced
[[Page 45254]]
concrete and brick structure containing (7) two, two-phase, 60-cycle
horizontal turbine-generator sets with a combined generating capacity
of 3,200 kilowatts, which transmit power to the 12,500 kV power
distribution system.
The Marquette Development No. 3 includes (8) Tourist Park Reservoir
with a surface area of 100 acres and a storage volume of 875 acre-feet,
impounded by (9) a dam composed of (a) a 37-foot-long left spillway
dike with a crest elevation of 642.84 feet NGVD, (b) an 80-foot long,
21-foot high, uncontrolled concrete ogee-shaped overflow spillway, with
a crest elevation of 638.84 feet NGVD, (c) a gated spillway with two
electric-hoist-operated, 10-foot-high by 10-foot-wide Taintor gates
with a crest elevation of 629.84 feet NGVD, (d) a 758-foot-long right
dike, with a reinforced concrete core wall with a crest elevation of
642.84 feet NGVD, and (e) a reinforced concrete intake structure with
inclined trash racks, located 123 feet from the right end of the right
dike, and having a single 20-foot-wide by 17-foot high bay. This bay
controls water flowing into (10) an 8-foot-diameter, 150-foot long
steel penstock, supported on nine reinforced-concrete pedestals spaced
16 feet apart, which carries water to (11) Powerhouse No. 3, which is a
28-foot by 40-foot reinforced concrete and brick structure containing
(12) one two-phase, 60-cycle vertical turbine-generator set, which
transmits power to the 12,500 kV power distribution system.
m. Locations of the application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE, Room 2A, Washington,
DC 20426, or by calling (202) 208-1371. This filing may be viewed on
the web at http://www.ferc.fed.us/online/rims.htm (call 202-208-2222
for assistance. A copy is also available for inspection and
reproduction at the address in item h above.
n. With this notice, we are initiating consultation with the State
Historic Preservation Officer as required by Sec. 106, National
Historic Preservation Act, and the regulations of the Advisory Council
on Historic Preservation, 36 CFR at Sec. 800.4.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 99-21498 Filed 8-18-99; 8:45 am]
BILLING CODE 6717-01-M