-
Start Preamble
AGENCY:
Coast Guard, DHS.
ACTION:
Temporary final rule.
SUMMARY:
The Coast Guard is establishing a temporary safety zone for certain navigable waters on the Piscataqua River in Portsmouth, New Hampshire. The safety zone is needed to protect personnel, vessels, and the marine environment from potential hazards created by cross-channel repair work on the submarine cables and removal of concrete cable mats on the Sarah Mildred Long Bridge in Portsmouth, NH. Entry of vessels or persons into this zone is prohibited unless specifically authorized by the Captain of the Port Northern New England (COTP) or a Designated Representative.
DATES:
This rule is effective without actual notice from August 19, 2021, through October 31, 2021. For the purposes of enforcement, actual notice will be used from September 1, 2021, until August 19, 2021.
ADDRESSES:
To view documents mentioned in this preamble as being available in the docket, go to https://www.regulations.gov,, type USCG-2021-0519 in the search box and click “Search.” Next, in the Document Type column, select “Supporting & Related Material.”
Start Further InfoFOR FURTHER INFORMATION CONTACT:
If you have questions on this rule, call or email LT Shaun Doyle, Sector Northern New England Waterways Management Division, U.S. Coast Guard; telephone 207-347-5015, email Shaun.T.Doyle@uscg.mil.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
I. Table of Abbreviations
CFR Code of Federal Regulations
COTP Captain of the Port Northern New England
DHS Department of Homeland Security
FR Federal Register
NPRM Notice of proposed rulemaking
§ Section
U.S.C. United States Code
II. Background Information and Regulatory History
The Coast Guard is issuing this temporary rule without prior notice and opportunity to comment pursuant to authority under section 4(a) of the Administrative Procedure Act (APA) (5 U.S.C. 553(b)). This provision authorizes an agency to issue a rule without prior notice and opportunity to comment when the agency for good cause finds that those procedures are “impracticable, unnecessary, or contrary to the public interest.” Under 5 U.S.C. 553(b)(B), the Coast Guard finds that good cause exists for not publishing a notice of proposed rulemaking (NPRM) with respect to this rule because we must establish the temporary safety zone by September 1, 2021, for this unscheduled critical repair work and insufficient time exists to execute the full NPRM process. Additionally, delaying the effective date of this rule would be contrary to the public interest as it is necessary to establish this safety zone to protect personnel and vessels from hazards associated with submarine cable repairs and concrete mat removal on the Sarah Mildred Long Bridge.
Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good cause exists for making this rule effective less than 30 days after publication in the Federal Register. Delaying the effective date of this rule would be impracticable because immediate action is needed to respond to the potential safety hazards associated with submarine cable repairs and concrete mat removal on the Sarah Mildred Long Bridge.
III. Legal Authority and Need for Rule
The Coast Guard is issuing this rule under authority in 46 U.S.C. 70034 (previously 33 U.S.C. 1231). The Captain of the Port Northern New England (COTP) has determined that potential hazards associated with submarine cable repairs and concrete mat removal starting September 1, 2021, will be a safety concern for anyone within a 100-yard radius of crane barges Start Printed Page 46602and associated machinery conducting repairs to the Sarah Mildred Long Bridge. This rule is needed to protect personnel, vessels, and the marine environment in the navigable waters within the safety zone while the bridge is being repaired.
IV. Discussion of the Rule
This rule establishes a safety zone from September 1, 2021 through October 31, 2021. The safety zone will cover all navigable waters within a 100-yard radius of crane barges and associated machinery conducting repairs on the Sarah Mildred Long Bridge. The safety zone will be enforced during 4.5 hour periods around slack tide, either once or twice a day, on each prescribed day within the effective period listed above. During periods of enforcement, the Sarah Mildred Long Bridge will remain in the closed position and all vessels will be prohibited from transiting under the bridge. The duration of the zone is intended to protect personnel, vessels, and the marine environment in these navigable waters while the bridge is being repaired. No vessel or person will be permitted to enter the safety zone without obtaining permission from the COTP or a Designated Representative.
V. Regulatory Analyses
We developed this rule after considering numerous statutes and Executive orders related to rulemaking. Below we summarize our analyses based on a number of these statutes and Executive orders, and we discuss First Amendment rights of protestors.
A. Regulatory Planning and Review
Executive Orders 12866 and 13563 direct agencies to assess the costs and benefits of available regulatory alternatives and, if regulation is necessary, to select regulatory approaches that maximize net benefits. This rule has not been designated a “significant regulatory action,” under Executive Order 12866. Accordingly, this rule has not been reviewed by the Office of Management and Budget (OMB).
This regulatory action determination is based on the size, location, duration, and time-of-day of the safety zone. The safety zone is only in effect for navigable waters within a 100-yard radius of crane barges and associated machinery conducting repairs on the Sarah Mildred Long Bridge. The safety zone will only be enforced during 4.5 hour periods around slack tide, either once or twice a day, on each prescribed day while the crane barge is on site and actively engaged in bridge repairs. Persons or vessels desiring to enter the safety zone may do so with the permission from the COTP or a Designated Representative. The Coast Guard will notify the public of the enforcement of this rule through appropriate means, which may include, but are not limited to, publication in the Local Notice to Mariners and Broadcast Notice to Mariners via VHF-FM marine channel 16.
B. Impact on Small Entities
The Regulatory Flexibility Act of 1980, 5 U.S.C. 601-612, as amended, requires Federal agencies to consider the potential impact of regulations on small entities during rulemaking. The term “small entities” comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations of less than 50,000. The Coast Guard certifies under 5 U.S.C. 605(b) that this rule will not have a significant economic impact on a substantial number of small entities.
While some owners or operators of vessels intending to transit the safety zone may be small entities, for the reasons stated in section V.A above, this rule will not have a significant economic impact on any vessel owner or operator.
Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Pub. L. 104-121), we want to assist small entities in understanding this rule. If the rule would affect your small business, organization, or governmental jurisdiction and you have questions concerning its provisions or options for compliance, please call or email the person listed in the FOR FURTHER INFORMATION CONTACT section.
Small businesses may send comments on the actions of Federal employees who enforce, or otherwise determine compliance with, Federal regulations to the Small Business and Agriculture Regulatory Enforcement Ombudsman and the Regional Small Business Regulatory Fairness Boards. The Ombudsman evaluates these actions annually and rates each agency's responsiveness to small business. If you wish to comment on actions by employees of the Coast Guard, call 1-888-REG-FAIR (1-888-734-3247). The Coast Guard will not retaliate against small entities that question or complain about this rule or any policy or action of the Coast Guard.
C. Collection of Information
This rule will not call for a new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).
D. Federalism and Indian Tribal Governments
A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on the States, on the relationship between the National Government and the States, or on the distribution of power and responsibilities among the various levels of government. We have analyzed this rule under that Order and have determined that it is consistent with the fundamental federalism principles and preemption requirements described in Executive Order 13132.
Also, this rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it does not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes.
E. Unfunded Mandates Reform Act
The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions that may result in the expenditure by a State, local, or tribal government, in the aggregate, or by the private sector of $100,000,000 (adjusted for inflation) or more in any one year. Though this rule will not result in such an expenditure, we do discuss the effects of this rule elsewhere in this preamble.
F. Environment
We have analyzed this rule under Department of Homeland Security Directive 023-01, Rev. 1, associated implementing instructions, and Environmental Planning COMDTINST 5090.1 (series), which guide the Coast Guard in complying with the National Environmental Policy Act of 1969 (42 U.S.C. 4321-4370f), and have determined that this action is one of a category of actions that do not individually or cumulatively have a significant effect on the human environment. This rule involves establishing a safety zone on the Piscataqua River that will prohibit entry within a 100-yard radius of crane barges and associated machinery being used by personnel to repair the Sarah Mildred Long Bridge. It is categorically excluded from further review under paragraph L60(a) of Appendix A, Table 1 of DHS Instruction Manual 023-01-001-01, Start Printed Page 46603Rev. 1. A Record of Environmental Consideration supporting this determination is available in the docket. For instructions on locating the docket, see the ADDRESSES section of this preamble.
G. Protest Activities
The Coast Guard respects the First Amendment rights of protesters. Protesters are asked to call or email the person listed in the FOR FURTHER INFORMATION CONTACT section to coordinate protest activities so that your message can be received without jeopardizing the safety or security of people, places or vessels.
Start List of SubjectsList of Subjects in 33 CFR Part 165
- Harbors
- Marine safety
- Navigation (water)
- Reporting and recordkeeping requirements
- Security measures
- Waterways
For the reasons discussed in the preamble, the Coast Guard amends 33 CFR part 165 as follows:
Start PartPART 165—REGULATED NAVIGATION AREAS AND LIMITED ACCESS AREAS
End Part Start Amendment Part1. The authority citation for part 165 continues to read as follows:
End Amendment Part Start Amendment Part2. Add § 165.T01-0519 to read as follows:
End Amendment PartSafety Zone; SML Bridge Repairs, Portsmouth, NH.(a) Location. The following area is a safety zone: All navigable waters of the Piscataqua River, from surface to bottom, within a 100-yard radius around crane barges and associated machinery conducting repairs on the Sarah Mildred Long Bridge.
(b) Definitions. As used in this section, Designated Representative means a Coast Guard Patrol Commander, including a Coast Guard coxswain, petty officer, or other officer operating a Coast Guard vessel and a Federal, State, and local officer designated by or assisting the Captain of the Port Northern New England (COTP) in the enforcement of the safety zone.
(c) Regulations. (1) Under the general safety zone regulations in subpart C of this part, you may not enter the safety zone described in paragraph (a) of this section unless authorized by the COTP or the COTP's Designated Representative.
(2) To seek permission to enter, contact the COTP or the COTP's Designated Representative via VHF-FM marine channel 16 or by contacting the Coast Guard Sector Northern New England Command Center at (207) 741-5465. Those in the safety zone must comply with all lawful orders or directions given to them by the COTP or the COTP's Designated Representative.
(d) Enforcement period. This section is effective from September 1, 2021, through October 31, 2021, but will only be enforced during periods when bridge repairs are active. When enforced, the Sarah Mildred Long Bridge will remain in the closed position and all vessels will be prohibited from transiting under the bridge. The Coast Guard will notify the public of the enforcement of this rule through appropriate means, which may include, but are not limited to, publication in the Local Notice to Mariners and Broadcast Notice to Mariners via VHF-FM marine channel 16.
Dated: August 4, 2021.
A.E. Florentino,
Captain, U.S. Coast Guard, Captain of the Port Northern New England.
[FR Doc. 2021-17753 Filed 8-18-21; 8:45 am]
BILLING CODE 9110-04-P
Document Information
- Effective Date:
- 8/19/2021
- Published:
- 08/19/2021
- Department:
- Coast Guard
- Entry Type:
- Rule
- Action:
- Temporary final rule.
- Document Number:
- 2021-17753
- Dates:
- This rule is effective without actual notice from August 19, 2021, through October 31, 2021. For the purposes of enforcement, actual notice will be used from September 1, 2021, until August 19, 2021.
- Pages:
- 46601-46603 (3 pages)
- Docket Numbers:
- Docket Number USCG-2021-0519
- RINs:
- 1625-AA00: Safety Zone Regulations
- RIN Links:
- https://www.federalregister.gov/regulations/1625-AA00/safety-zone-regulations
- Topics:
- Harbors, Marine safety, Navigation (water), Reporting and recordkeeping requirements, Security measures, Waterways
- PDF File:
- 2021-17753.pdf
- Supporting Documents:
- » Safety Zone SML Bridge Repairs Portsmouth NH - Project Approved
- » Safety Zone; SML Bridge Repairs, Portsmouth, NH
- CFR: (1)
- 33 CFR 165.T01-0519