98-22372. Northern Natural Gas Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 63, Number 161 (Thursday, August 20, 1998)]
    [Notices]
    [Page 44614]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-22372]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP98-715-000]
    
    
    Northern Natural Gas Company; Notice of Request Under Blanket 
    Authorization
    
    August 14, 1998.
        Take notice that on August 10, 1998, Northern Natural Gas Company 
    (Northern), 1111 South 103rd Street, Omaha, Nebraska 68124-1000, filed 
    a request with the Commission in Docket No. CP98-715-000, pursuant to 
    Sections 157.205 and 157.212 of the Commission's Regulations under the 
    Natural Gas Act (NGA) for authorization to install and operate a new 
    delivery point and appurtenant facilities, located in Yoakum County, 
    Texas, authorized in blanket certificate issued in Docket No. CP82-401-
    000, all as more fully set forth in the request on file with the 
    Commission and open to public inspection.
        Northern proposes to install and operate a new delivery point and 
    appurtenant facilities to provide natural gas transportation service to 
    Golden Spread Electric Cooperative, Inc., Electric Generating 
    Cooperative, Inc. and Denver City Energy Associates, L.P. (hereinafter 
    referred to as Golden Spread). Northern would install two (2) taps at 
    its Plains Compressor Station plus install EFM and scada equipment at a 
    downstream measurement/interconnect point between Northern's and Golden 
    Spread's facilities. Northern states that service would be provided to 
    Golden Spread pursuant to currently effective throughput service 
    agreement(s). Northern reports that Golden Spread has requested the 
    proposed delivery point to provide fuel for its Mustang Plant.
        Northern further reports that the volumes to be delivered to Golden 
    Spread would be 90,000 MMBtu on a peak day and 16,420,000 MMBtu on an 
    annual basis. Northern estimates a facility cost of approximately 
    $132,000 which would be reimbursed by Golden Spread. Golden Spread 
    would construct or cause to be constructed, approximately 0.6 miles of 
    pipeline from the taps to the proposed delivery point at its own 
    expense.
        Any person or the Commission's staff may, within 45 days after the 
    Commission has issued this notice, file pursuant to Rule 214 of the 
    Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or 
    notice of intervention and pursuant to Section 157.205 of the 
    Regulations under the NGA (18 CFR 157.205) a protest to the request. If 
    no protest is filed within the allowed time, the proposed activity 
    shall be deemed to be authorized effective the day after the time 
    allowed for filing a protest. If a protest is filed and not withdrawn 
    within 30 days after the time allowed for filing a protest, the instant 
    request shall be treated as an application for authorization pursuant 
    to Section 7 of the NGA.
    David P. Boergers,
    Secretary.
    [FR Doc. 98-22372 Filed 8-19-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
08/20/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-22372
Pages:
44614-44614 (1 pages)
Docket Numbers:
Docket No. CP98-715-000
PDF File:
98-22372.pdf