98-22453. Railroad Safety Advisory Committee (RSAC); Working Group Activity Update  

  • [Federal Register Volume 63, Number 161 (Thursday, August 20, 1998)]
    [Notices]
    [Pages 44669-44670]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-22453]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    
    Federal Railroad Administration
    [Docket No. RSAC-96-1, Notice No. 13]
    
    
    Railroad Safety Advisory Committee (RSAC); Working Group Activity 
    Update
    
    AGENCY: Federal Railroad Administration (FRA), Department of 
    Transportation (DOT).
    
    ACTION: Announcement of Railroad Safety Advisory Committee (RSAC) 
    Working Group Activities.
    
    -----------------------------------------------------------------------
    
    SUMMARY: FRA is updating its announcement of RSAC's working group 
    activities to reflect the current status of working group activities.
    
    FOR FURTHER INFORMATION CONTACT: Vicky McCully, RSAC Coordinator, FRA, 
    400 7th Street, S.W. Washington, D.C. 20590, (202) 493-6305 or Grady 
    Cothen, Deputy Associate Administrator for Safety Standards Program 
    Development, FRA, 400 7th Street, S.W., Washington, D.C. 20590, (202) 
    493-6302.
    
    SUPPLEMENTARY INFORMATION: This notice serves to update FRA's last 
    announcement of working group activities and status reports on 11/5/97 
    (62 FR 59940). The eighth full Committee meeting was held May 14, 1998. 
    The next meeting of the full Committee is scheduled for September 9, 
    1998.
        Since its first meeting in April of 1996, the RSAC has accepted 
    fifteen tasks. Status for each of the tasks is provided below:
        Task 96-1--Revising the Freight Power Brake Regulations. This Task 
    was formally withdrawn from the RSAC on 6/24/97.
        Task 96-2--Reviewing and recommending revisions to the Track Safety 
    Standards (49 CFR Part 213). This task was accepted April 2, 1996, and 
    a Working Group was established. Consensus was reached on recommended 
    revisions and an NPRM incorporating these recommendations was published 
    in the Federal Register on 7/3/97 (62 FR 36138). The final rule was 
    published in the Federal Register on 6/22/98 (63 FR 33991). The 
    effective date of the rule is 9/21/98. Contact: Al MacDowell (202) 493-
    6206.
        Task 96-3--Reviewing and recommending revisions to the Radio 
    Standards and Procedures (49 CFR Part 220). This Task was accepted on 
    April 2, 1996, and a Working Group was established. Consensus was 
    reached on recommended revisions and an NPRM incorporating these 
    recommendations published in the Federal Register on 6/26/97 ( 62 FR 
    34544). FRA is nearing completion of a final rule. Contact: Gene Cox 
    (202) 493-6319.
        Task 96-4--Reviewing the appropriateness of the agency's current 
    policy regarding the applicability of existing and proposed regulations 
    to tourist, excursion, scenic, and historic railroads. This Task was 
    accepted on April 2, 1996, and a Working Group was established. The 
    Working Group is currently monitoring completion of the steam 
    locomotive regulations task. Contact: Grady Cothen (202) 493-6302.
        Task 96-5--Reviewing and recommending revisions to Steam Locomotive 
    Inspection Standards (49 CFR Part 230). Tasked to the Tourist and 
    Historic Working Group on July 24, 1996. Consensus was reached on an 
    NPRM and FRA is finalizing the regulatory analysis to accompany 
    publication of the NPRM. Contact: George Scerbo (202) 493-6349.
        Task 96-6--Reviewing and recommending revisions to miscellaneous 
    aspects of the regulations addressing Locomotive Engineer Certification 
    (49 CFR Part 240). This Task was accepted on October 31, 1996, and a 
    Working Group was established. Consensus on an NPRM was reached on May 
    14, 1998, and FRA is finalizing the regulatory analysis to accompany 
    publication of the NPRM. Contact: John Conklin (202) 493-6318.
        Task 96-7--Developing On-Track Equipment Safety Standards. This 
    task was assigned to the existing Track Standards Working Group on 
    October 31, 1996, and a Task Force was established. The Task Force has 
    reached agreement in principle on what should be included in a proposed 
    rule and has identified remaining issues to be resolved. Contact: Al 
    MacDowell (202) 493-6236.
         Task 96-8--This Planning Task evaluated the need for 
    action responsive to recommendations contained in a report to Congress 
    entitled, Locomotive Crashworthiness & Working Conditions. This Task 
    was accepted on October 31, 1996. A Planning Group was formed and 
    reviewed the report, grouping issues into categories.
         Task 97-1--Developing crashworthiness specifications to 
    promote the integrity of the locomotive cab in accidents resulting from 
    collisions. This Task was accepted on June 24, 1997. A Task Force on 
    engineering issues established by the Working Group on Locomotive 
    Crashworthiness has been actively reviewing collision history and 
    design options and has commissioned additional research that is being 
    guided toward completion over the next few months. Contact: Sean 
    Mehrvazi (202) 493-6237.
         Task 97-2--Evaluating the extent to which environmental, 
    sanitary, and other working conditions in locomotive cabs affect the 
    crew's health and the safe operation of locomotives, proposing 
    standards where appropriate. This Task was accepted June 24, 1997. The 
    Working Group on Cab Working Conditions is meeting to draft a standard 
    for locomotive sanitary conditions. Task forces on noise and 
    temperature have been formed and are actively meeting to identify and 
    address issues. Contact: Brenda Hattery (202) 493-6326.
         Task 97-3--Developing event recorder data survivability 
    standards. This Task was accepted on June 24, 1997. An Event Recorder 
    Working Group and Task Force have been established and are actively 
    meeting.
    
    [[Page 44670]]
    
    Contact: Edward English (202) 493-6321.
         Task 97-4 and Task 97-5--Defining Positive Train Control 
    (PTC) functionalities, describing available technologies, evaluating 
    costs and benefits of potential systems, and considering implementation 
    opportunities and challenges, including demonstration and deployment. 
    Task 97-6--Revising various regulations to address the safety 
    implications of processor-based signal and train control technologies, 
    including communications-based operating systems. These three tasks 
    were accepted on September 30, 1997, and assigned to a single Working 
    Group. A Data and Implementation Task Force was formed to address 
    issues such as assessment of costs and benefits and technical 
    readiness. A Standards Task Force was formed to develop PTC standards. 
    The Working Group and task forces are actively meeting. Contact: Grady 
    Cothen (202) 493-6302.
         Task 97-7--Determining damages qualifying an event as a 
    reportable train accident. This Task was accepted on September 30, 
    1997. A working group has been formed to address this task.
    
        Contact: Robert Finkelstein (202) 493-6280.
    
        Please refer to the notice published in the Federal Register on 
    March 11, 1996 (61 F.R. 9740) for more information about the RSAC.
    
        Issued in Washington, D.C. on August 17, 1998.
    S. Mark Lindsey,
    Chief Counsel.
    [FR Doc. 98-22453 Filed 8-19-98; 8:45 am]
    BILLING CODE 4910-06-P
    
    
    

Document Information

Published:
08/20/1998
Department:
Federal Railroad Administration
Entry Type:
Notice
Action:
Announcement of Railroad Safety Advisory Committee (RSAC) Working Group Activities.
Document Number:
98-22453
Pages:
44669-44670 (2 pages)
Docket Numbers:
Docket No. RSAC-96-1, Notice No. 13
PDF File:
98-22453.pdf