99-21612. Notice of Application Accepted for Filing and Soliciting Motions to Intervene and Protests  

  • [Federal Register Volume 64, Number 161 (Friday, August 20, 1999)]
    [Notices]
    [Page 45533]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-21612]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    
    
    Notice of Application Accepted for Filing and Soliciting Motions 
    to Intervene and Protests
    
    August 16, 1999.
        Take notice that the following hydroelectric application has been 
    filed with the Commission and is available for public inspection:
        a. Type of Application: New Major License.
        b. Project No.: 2566-010.
        c. Date filed: March 30, 1999.
        d. Applicant: Consumers Energy Company.
        e. Name of Project: Webber Hydroelectric Project.
        f. Location: On the Grand River, in Lyons and Portland Townships, 
    near the City of Portland, Ionia County, Michigan. The project would 
    not utilize federal lands.
        g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
        h. Applicant Contact: David Battige, Consumers Energy Company, 
    Hydro Operations, 330 Chestnut Street, Cadillac, MI 49601, (616) 779-
    5506.
        i. FERC Contact: Tom Dean, thomas.dean@ferc.fed.us, (202) 219-2778.
        j. Deadline for filing motions to intervene and protests: 60 days 
    from the issuance date of this notice.
        All documents (original and eight copies) should be filed with: 
    David P. Boergers, Secretary Federal Energy Regulatory Commission, 888 
    First Street, NE, Washington, DC 20426.
        The Commission's Rules of Practice and Procedure require all 
    intervenors filing documents with the Commission to serve a copy of 
    that document on each person whose name appears on the official service 
    list for the project. Further, if an intervenor files comments or 
    documents with the Commission relating to the merits of an issue that 
    may affect the responsibilities of a particular resource agency, they 
    must also serve a copy of the document on that resource agency.
        k. Status of environmental analysis: This application is not ready 
    for environmental analysis at this time.
        l. Description of the Project: The project consists of the 
    following existing facilities: (1) A 32-foot-high, 1,200-foot-long dam 
    comprising: (a) A 157-foot-long concrete powerhouse section, (b) a 313-
    foot-high concrete spillway with 10 Taintor gates and one hydraulic 
    flap gate, and (c) two earth embankment sections having a combined 
    total length of 730 feet; (2) a 7-mile-long reservoir having a 660-acre 
    surface area at a normal pool elevation of 684.4 feet USGS; (3) a 
    powerhouse containing two generating units with a total installed 
    capacity of 3,250 kW; and (4) other appurtenances.
        m. Locations of the application: A copy of the application is 
    available for inspection and reproduction at the Commission's Public 
    Reference Room, located at 888 First Street, NE, Room 2A, Washington, 
    DC 20246, or by calling (202) 208-1371. The application may be viewed 
    on the web at http://www.ferc.fed.us/online/rims.htm (call(202) 208-
    2222 for assistance). A copy is also available for inspection and 
    reproduction at the address in item h. above.
        n. Individuals desiring to be included on the Commission's mailing 
    list should so indicate by writing to the Secretary of the Commission.
        Protests or Motions to Intervene--Anyone may submit a protest or a 
    motion to intervene in accordance with the requirements of Rules of 
    Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In 
    determining the appropriate action to take, the Commission will 
    consider all protests filed, but only those who file a motion to 
    intervene in accordance with the Commission's Rules may become a party 
    to the proceeding. Any protests or motions to intervene must be 
    received on or before the specified deadline date for the particular 
    application.
        Filing and Service of Responsive Documents--The application is not 
    ready for environmental analysis at this time; therefore, the 
    Commission is not now requesting comments, recommendations, terms and 
    conditions, or prescriptions.
        When the application is ready for environmental analysis, the 
    Commission will issue a public notice requesting comments, 
    recommendations, terms and conditions, or prescriptions.
        All filings must (1) bear in all capital letters the title 
    ``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading 
    the name of the applicant and the project number of the application to 
    which the filing responds; (3) furnish the name, address, and telephone 
    number of the person protesting or intervening; and (4) otherwise 
    comply with the requirements of 18 CFR 385.2001 through 385.2005. 
    Agencies may obtain copies of the application directly from the 
    applicant. Any of these documents must be filed by providing the 
    original and the number of copies required by the Commission's 
    regulations to: The Secretary, Federal Energy Regulatory Commission, 
    888 First Street, NE, Washington, DC 20426. An additional copy must be 
    sent to Director, Division of Project Review, Office of Hydropower 
    Licensing, Federal Energy Regulatory Commission, at the above address. 
    A copy of any protest or motion to intervene must be served upon each 
    representative of the applicant specified in the particular 
    application.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 99-21612 Filed 8-19-99; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
08/20/1999
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
99-21612
Pages:
45533-45533 (1 pages)
PDF File:
99-21612.pdf