SUMMARY:
This notice announces the availability of the ROD to fund implementation of Crooked River Valley Rehabilitation Project in Idaho County, Idaho. BPA has decided to fund implementation of Alternative 2 identified in the Crooked River Valley Rehabilitation Project Final Environmental Impact Statement (DOE/EIS-0506, June 2015). Alternative 2 consists of: (1) Constructing a 6,000 foot temporary bypass channel and temporary access road/levee and, following construction of the channel, removing and decommissioning these structures; (2) regrading approximately 115 acres of floodplain by moving dredge tailings; (3) filling in approximately 10,960 feet of the current channel, reconstructing approximately 7,400 feet of new channel, and constructing more than 2,700 feet of side channels; (4) replanting the valley bottom with native and approved non-native plant species; (5) staging materials and equipment at campgrounds; and (6) monitoring project activities and effectiveness. All mitigation measures identified in the environmental impact statement (EIS) are adopted.
ADDRESSES:
Copies of the ROD and EIS may be obtained by calling BPA's toll-free document request line, 1-800-622-4520. The ROD and EIS Summary are also available on our Web site, www.bpa.gov/goto/CrookedRiver.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Brenda Aguirre, Bonneville Power Administration—KEC-4, P.O. Box 3621, Portland, Oregon, 97208-3621; toll-free telephone number 1-800-622-4519; fax number 503-230-5699; or email baguirre@bpa.gov.
Start SignatureIssued in Portland, Oregon: August 13, 2015.
Elliot E. Mainzer,
Administrator and Chief Executive Officer.
[FR Doc. 2015-20603 Filed 8-19-15; 8:45 am]
BILLING CODE 6450-01-P
Document Information
- Published:
- 08/20/2015
- Department:
- Bonneville Power Administration
- Entry Type:
- Notice
- Action:
- Notice of availability of Record of Decision (ROD).
- Document Number:
- 2015-20603
- Pages:
- 50616-50616 (1 pages)
- PDF File:
- 2015-20603.pdf
- Supporting Documents:
- » Meetings: Fiscal Year 2022-2023 Proposed Power and Transmission Rate Adjustments Public Hearing and Opportunities for Public Review and Comment
- » Environmental Impact Statements; Availability, etc.: Crystal Springs Hatchery Program Termination
- » Proposed Open Access Transmission Tariff: Public Hearing and Opportunities for Public Review and Comment
- » Bonneville Purchasing Instructions and Bonneville Financial Assistance Instructions
- » Final Rules of Procedure
- » Environmental Impact Statements; Availability, etc.: Melvin R. Sampson Hatchery, Yakima Basin Coho Project
- » Records of Decisions: Electrical Interconnection of Vantage to Pomona Heights Transmission Line Project
- » Bonneville Purchasing Instructions and Bonneville Financial Assistance Instructions; Availability
- » Bonneville Purchasing Instructions and Bonneville Financial Assistance Instructions
- » Fiscal Year 2018-2019 Proposed Power and Transmission Rate Adjustments