Start Preamble
AGENCY:
Federal Highway Administration (FHWA), Department of Transportation (DOT).
ACTION:
Notice of Limitation on Claims for Judicial Review of Actions by the California Department of Transportation (Caltrans).
SUMMARY:
The FHWA, on behalf of Caltrans, is issuing this notice to announce actions taken by Caltrans, that are final. The actions relate to a proposed highway project, the modification of the existing Hazel Avenue/U.S. 50 interchange in the County of Sacramento, State of California. Those actions grant licenses, permits, and approvals for the project.
DATES:
By this notice, the FHWA, on behalf of Caltrans, is advising the public of final agency actions subject to 23 U.S.C. 139(/)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before January 19, 2021. If the Federal law that authorizes judicial review of a claim provides a time period of less than 150 days for filing such claim, then that shorter time period applies.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
For Caltrans: Julia K Green, Branch Chief, Caltrans Office of Environmental Management, M-4 California Department of Transportation-District 3, 703 B Street, Marysville, CA 95901 Office Hours: 8:00 a.m.-5:00 p.m., Pacific Standard Time, telephone (530) 741-5181 or email Julia.green@dot.ca.gov. For FHWA, contact David Tedrick at (916) 498-5024 or email david.tedrick@dot.gov.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Effective July 1, 2007, FHWA assigned, and Caltrans assumed, environmental responsibilities for this project pursuant to 23 U.S.C. 327. Notice is hereby given that the Caltrans has taken final agency actions subject to 23 U.S.C. 139(/)(1) by issuing licenses, permits, and approvals for the following highway project in the State of California.
The County of Sacramento, in cooperation with Caltrans and the City of Rancho Cordova, proposes to modify the existing Hazel Avenue/US 50 interchange, and extend and grade-separate Hazel Avenue over Folsom Boulevard and the SPTC-JPA rail corridor. Hazel Avenue will be extended south to a proposed intersection with the future Atlanta Street (a new roadway that will be constructed as part of the Easton Place development). The project limits along US 50 begin approximately 3,200 feet west of the existing Hazel Avenue overcrossing and extend 2,500 feet east of the Natoma Overhead (post miles 15.1 to 15.4). Improvements along Folsom Boulevard would extend from approximately 1,200 feet west of the Start Printed Page 51545Hazel Avenue intersection to 900 feet east of the intersection. The project purpose is to reduce congestion, improve traffic operations, accommodate travel demand due to planned and approved developments, and improve safety of all modes of travel, including bicycles and pedestrians. The actions by the Federal agencies, and the laws under which such actions were taken, are described in the Final Environmental Assessment (FEA)/Finding of No Significant Impact (FONSI) for the project, approved on July 2, 2020, and in other documents in Caltrans' project records.
The FEA, FONSI and other project records are available by contacting Caltrans at the addresses provided above.
This notice applies to all Federal agency decisions as of the issuance date of this notice and all laws under which such actions were taken, including but not limited to:
1. Council on Environmental Quality Regulations
2. National Environmental Policy Act of 1969, as amended, 42 U.S.C. 4321 et seq.
3. Federal-Aid Highway Act of 1970, 23 U.S.C 109
4. MAP-21, the Moving Ahead for Progress in the 21st Century Act (Pub. L. 112-141)
5. Clean Air Act Amendments of 1990 (CAAA)
6. Clean Water Act of 1977 and 1987
7. Federal Water Pollution Control Act of 1972 (see Clean Water Act of 1977 & 1987)
8. Federal Land Policy and Management Act of 1976 (Paleontological Resources)
9. Noise Control Act of 1972
10. Safe Drinking Water Act of 1944, as amended
11. Endangered Species Act of 1973
12. Executive Order 11990, Protection of Wetlands
13. Executive Order 13112, Invasive Species
14. Executive Order 13186, Migratory Birds
15. Fish and Wildlife Coordination Act of 1934, as amended
16. Migratory Bird Treaty Act
17. Water Bank Act Wetlands Mitigation Banks, ISTEA 1991, Sections I 006-1007
18. Wildflowers, Surface Transportation and Uniform Relocation Act of 1987 Section 130
19. Coastal Zone Management Act of 1972
20. Coastal Zone Management Act Reauthorization Amendments Of 1990
21. Executive Order 11988, Floodplain Management
22. Department of Transportation (DOT) Executive Order 5650.2—Floodplain Management and Protection (April 23, 1979)
23. Rivers and Harbors Appropriation Act of 1899, Sections 9 and 10
24. Title VI of the Civil Rights Act of 1964, as amended
25. Executive Order 12898, Federal Actions to Address Environmental Justice and Low Income Populations
(Catalog of Federal Domestic Assistance Program Number 20.205, Highway Planning and Construction. The regulations implementing Executive Order 12372 regarding intergovernmental consultation on Federal programs and activities apply to this program.)
Start SignatureRodney Whitfield,
Director, Financial Services, Federal Highway Administration, California Division.
[FR Doc. 2020-18301 Filed 8-19-20; 8:45 am]
BILLING CODE 4910-RY-P
Document Information
- Published:
- 08/20/2020
- Department:
- Federal Highway Administration
- Entry Type:
- Notice
- Action:
- Notice of Limitation on Claims for Judicial Review of Actions by the California Department of Transportation (Caltrans).
- Document Number:
- 2020-18301
- Dates:
- By this notice, the FHWA, on behalf of Caltrans, is advising the public of final agency actions subject to 23 U.S.C. 139(/)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before January 19, 2021. If the Federal law that authorizes judicial review of a claim provides a time period of less than 150 days for filing such claim, then that shorter time period applies.
- Pages:
- 51544-51545 (2 pages)
- PDF File:
- 2020-18301.pdf
- Supporting Documents:
- » Final Federal Agency Actions: Proposed Highway in California
- » Final Federal Agency Actions: Proposed Highway Projects in Texas
- » Transfer and Sanction Programs
- » Experimental Project To Evaluate Proposals for Delegation of Certain Program-Wide FHWA Responsibilities to States
- » Environmental Impact Statements; Availability, etc.: Multiple Counties in Alabama; Rescission
- » Federal Agency Actions: SH 205 From North of John King (Rockwall County Line) to SH 78 in Collin County, TX
- » Federal Agency Actions: Interstate 95 in City of Fredericksburg and Counties of Spotsylvania, Stafford, Prince William, and Fairfax, VA
- » Environmental Impact Statements; Availability, etc.: I-495 and I-270 Managed Lanes Study, Montgomery and Prince George's Counties, MD and Fairfax County, VA
- » Federal Agency Actions: Proposed Highway in California
- » Federal Agency Actions: California; Proposed Highway