96-21272. Application to Export Electric Energy; Edison Source  

  • [Federal Register Volume 61, Number 163 (Wednesday, August 21, 1996)]
    [Notices]
    [Pages 43232-43233]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-21272]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    [Dockets No. EA-119 and EA-120]
    
    
    Application to Export Electric Energy; Edison Source
    
    AGENCY: Office of Fossil Energy, DOE
    
    AGENCY: Notice of Application.
    
    -----------------------------------------------------------------------
    
    SUMMARY: Edison Source has submitted applications to export electric 
    energy to Mexico and Canada pursuant to section 202(e) of the Federal 
    Power Act. Edison Source is both a broker and a marketer of electric 
    energy. It does not own or control any electric generation or 
    transmission facilities.
    
    DATES: Comments, protests or requests to intervene must be submitted on 
    or before September 20, 1996.
    
    ADDRESSES: Comments, protests or requests to intervene should be 
    addressed as follows: Office of Coal & Electricity (FE-52), Office of 
    Fuels Programs, Office of Fossil Energy, Department of Energy, 1000 
    Independence Avenue, SW, Washington, DC 20585 (FAX 202-287-5736).
    
    FOR FURTHER INFORMATION CONTACT: Warren E. Williams (Program Office) 
    202-586-9629 or Michael Skinker (Program Attorney) 202-586-6667.
    
    SUPPLEMENTARY INFORMATION: Exports of electricity from the United 
    States to a foreign country are regulated and require authorization 
    under section 202(e) of the Federal Power Act (FPA) (16 U.S.C. 
    Sec. 824a(e)).
        On July 31, 1996, Edison Source filed two applications with the 
    Office of Fossil Energy (FE) of the Department of Energy (DOE) for 
    authorization to export electric energy, as a power marketer, to Mexico 
    and Canada pursuant to section 202(e) of the FPA. Edison Source neither 
    owns nor controls any facilities for the transmission or distribution 
    of electricity, nor does it have a franchised service area. Rather, 
    Edison Source is a power marketer authorized by the Federal Energy 
    Regulatory Commission (FERC) to engage in wholesale sale of electricity 
    in interstate commerce at negotiated rates pursuant to its filed rate 
    schedules.
        The electric energy Edison Source proposes to transmit to Mexico 
    and Canada will be purchased from electric utilities and other entities 
    as permitted by the FERC. Edison Source agrees to comply with the terms 
    and conditions contained in the export authorization issued for those 
    cross-border facilities it proposes to use as well as any other 
    conditions imposed by DOE, including providing written evidence that 
    sufficient transmission access to compete the export transaction has 
    been obtained.
        In Docket EA-119, Edison Source proposed to export the electric 
    energy to Mexico over one or more of the following international 
    transmission lines for which Presidential permits (PP) have been 
    previously issued:
    
    ----------------------------------------------------------------------------------------------------------------
                   Location                        Voltage                   Owner             Presidential permit  
    ----------------------------------------------------------------------------------------------------------------
    Miguel, CA...........................  230 kV.................  SDG&E..................  PP-68.                 
    Imperial Valley, CA..................  230 kV.................  .......................  PP-79.                 
    Diablo, NM...........................  115 kV.................  El Paso Electric.......  PP-92.                 
    Ascarate, TX.........................  115 kV.................  .......................  PP-48.                 
    Brownsville, TX......................  138 kV.................  CPL....................  PP-94.                 
    Eagle Pass, TX.......................  138 kV.................  CFE....................  PP-50.                 
    Laredo, TX...........................  138 kV.................  CFE....................  PP-57.                 
    Falcon Dam, TX.......................  138 kV.................  CFE....................  Not required.          
    ----------------------------------------------------------------------------------------------------------------
    
        In docket EA-120, Edison Source proposes to export the electric 
    energy to Canada over one or more of the following international 
    transmission lines for which Presidential permits (PP) have been 
    previously issued:
    
    [[Page 43233]]
    
    
    
    ----------------------------------------------------------------------------------------------------------------
                   Location                        Voltage                   Owner             Presidential permit  
    ----------------------------------------------------------------------------------------------------------------
    Tioga, ND............................  230-kV.................  Basin Electric.........  PP-64.                 
    Blaine, WA...........................  2-500-kV...............  BPA....................  PP-10.                 
    Nelway, BC...........................  230-kV.................  .......................  PP-36.                 
    Nelway, BC...........................  230-kV.................  .......................  PP-46.                 
    Derby Line, VT.......................  120-kV.................  Citizens Utilities.....  PP-66.                 
    St. Clair, MI........................  345-kV.................  Detroit Edison.........  PP-38.                 
    Maryville, MI........................  230-kV.................  .......................  PP-21.                 
    Detroit, MI..........................  230-kV.................  .......................  PP-21.                 
    St Clair, MI.........................  345-kV.................  .......................  PP-58.                 
    Franklin, VT.........................  120-kV 1...............  Joint Owners of the      PP-82.                 
                                                                     Highgate Project.                              
    Houlton, ME..........................  345-kV.................  Maine Electric Power Co  PP-43.                 
    Arostock Cnty, ME....................  138-kV.................  Maine Public Svs.......  PP-29.                 
    Intnl Falls, MN......................  115-kV.................  Minnesota Power........  PP-78.                 
    Roseau Cnty, MN......................  230-kV.................  Minnkota Power Corp....  PP-61.                 
    Massena, NY..........................  2-230-kV...............  NYPA...................  PP-25.                 
    Devils Hole, NY......................  230-kV.................  .......................  PP-30.                 
    Massena, NY..........................  765-kV.................  .......................  PP-56.                 
    Niagara Falls, NY....................  2-345-kV...............  .......................  PP-74.                 
    Devils Hole, NY......................  230-kV.................  Niagara Mohawk.........  PP-30.                 
    Red River, ND........................  230-kV.................  Northern States........  PP-45.                 
    Roseau, MN...........................  500-kV.................  Power Co...............  PP-63.                 
    Norton, VT...........................  450-kV DC..............  Vermont Electric         PP-76.                 
                                                                     Transmission Co.                               
    ----------------------------------------------------------------------------------------------------------------
    \1\ These facilities were constructed at 345-kV but operated at 120-kV.                                         
    
    Procedural Matters
    
        Any persons desiring to be heard or to protest this application 
    should file a petition to intervene or protest at the address provided 
    above in accordance with Secs. 385.211 or 385.214 of the Rules of 
    Practice and Procedures (18 CFR 385.211, 385.214). Fifteen copies of 
    such petitions and protests should be filed with the DOE on or before 
    the date listed above. Comments on Edison Source's request to export to 
    Mexico should be clearly marked with Docket No. EA-119. Comments on 
    Edison Source's request to export to Canada should be clearly marked 
    with Docket No. EA-120. Additional copies are to be filed directly 
    with: Joseph C. Bell, Jolanta Sterbenz, Hogan & Hartson L.L.P., Counsel 
    for Edison Source, 555 Thirteenth Street, NW, Washington, DC 20004-
    11009.
        A final decision will be made on this applications after the 
    environmental impacts have been evaluated pursuant to the National 
    Environmental Policy Act of 1969 (NEPA), and a determination is made by 
    the DOE that the proposed action will not adversely impact on the 
    reliability of the U.S. electric power supply system.
        Copies of this application will be made available, upon request, 
    for public inspection and copying at the address provided above.
    
        Issued in Washington, DC on August 15, 1996.
    Anthony J. Como,
    Director, Office of Coal & Electricity, Office of Fuels Programs, 
    Office of Fossil Energy.
    [FR Doc. 96-21272 Filed 8-20-96; 8:45 am]
    BILLING CODE 6450-01-P
    
    
    

Document Information

Published:
08/21/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-21272
Dates:
Comments, protests or requests to intervene must be submitted on or before September 20, 1996.
Pages:
43232-43233 (2 pages)
Docket Numbers:
Dockets No. EA-119 and EA-120
PDF File:
96-21272.pdf