[Federal Register Volume 62, Number 162 (Thursday, August 21, 1997)]
[Notices]
[Pages 44468-44469]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-22207]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No CP97-691-000]
Southern Natural Gas Company; Notice of Application
August 15, 1997.
Take notice that on August 8, 1997, Southern Natural Gas Company
(Southern), P.O. Box 2563, Birmingham, Alabama 35202-2563, filed in
Docket No. CP97-691-000 an application, pursuant to Section 7(c) of the
Natural Gas Act, for a certificate of public convenience and necessity
authorizing it to construct and operate mainline looping and
measurement facilities, all as more fully set forth in the application
which is on file with the Commission and open to public inspection.
Southern states that it has executed contracts with three shippers,
Alabama Power Company, Kimberly Clark Corporation, and Interconn
Resources, Inc., to provide new firm transportation services under
Southern's Rate Schedule FT. It is indicated that the shippers have
subscribed a total of 34,125 Mcf per day (Mcfd) of new FT service.
To provide capacity to render the additional FT services, Southern
proposes to construct and operate 3.3 miles of 30-inch pipeline loop
extending from Mile Post 180.356 to Mile Post 183.659 on the South Main
3rd loop line in Dallas County, Alabama. In addition, Southern proposes
to install a meter station at Mile Post 208.498 which would consist of
two 6-inch meter runs and appurtenant facilities. Southern proposes to
place the facilities in service by November 1, 1998. Southern estimates
that the project would cost $4,191,300, which would be financed,
initially, through short-term instruments and cash available from
operations.
In addition to the basic project cost, Southern states that it has
agreed to make a Contribution in Aid of
[[Page 44469]]
Construction to Alabama Gas Corporation (Alagasco) to cover the cost of
construction of certain facilities necessary for Alagasco to provide a
distribution service to Alabama Power Corporation for the volumes
transported on Southern's system. Southern states that the cost of
Alagasco facilities is estimated at $3,000,000. Southern explains that
its cost of service calculations reflect the Alagasco contribution.
Southern requests that the Commission issue a predetermination that
rolled-in rates are appropriate for the proposed facilities. Southern
asserts that the facilities will be physically and operationally
integrated with Southern's existing facilities and will be used for the
benefit of all customers on the system. Specifically, Southern notes
revenues generated by the project will exceed expenses and that the
loop will enhance system reliability downstream of the Selma Compressor
Station.
Any person desiring to participate in the hearing process or to
make any protest with reference to said application should on or before
September 5, 1997, file with the Federal Energy Regulatory Commission,
Washington, D.C. 20426, a motion to intervene or a protest in
accordance with the requirements of the Commission's Rules of Practice
and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the
Natural Gas Act (18 CFR 157.10). All protests filed with the Commission
will be considered by it in determining the appropriate action to be
taken but will not serve to make the protestants parties to the
proceeding. Any person wishing to become a party to a proceeding or to
participate as a party in any hearing therein must file a motion to
intervene in accordance with the Commission's Rules.
A person obtaining intervenor status will be placed on the service
list maintained by the Secretary of the Commission and will receive
copies of all documents filed by the applicant and by every one of the
intervenors. An intervenor can file for rehearing of any Commission
order and can petition for court review of any such order. However, an
intervenor must submit copies of comments or any other filing it makes
with the Commission to every other intervenor in the proceeding, as
well as 14 copies with the Commission.
A person does not have to intervene, however, in order to have
comments considered. A person, instead, may submit two copies of
comments to the Secretary of the Commission. Commenters will be placed
on the Commission's environmental mailing list, will receive copies of
environmental documents and will be able to participate in meetings
associated with the Commission's environmental review process.
Commenters will not be required to serve copies of filed documents on
all other parties. However, commenters will not receive copies of all
documents filed by other parties or issued by the Commission and will
not have the right to seek rehearing or appeal the Commission's final
order to a federal court.
The Commission will consider all comments and concerns equally,
whether filed by commenters or those requesting intervenor status.
Take further notice that, pursuant to the authority contained in
and subject to the jurisdiction conferred upon the Federal Energy
Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and
the Commission's Rules of Practice and Procedure, a hearing will be
held without further notice before the Commission or its designee on
this application if no motion to intervene is filed within the time
required herein, if the Commission on its own review of the matter
finds that a grant of the certificate is required by the public
convenience and necessity. If a motion for leave to intervene is timely
filed, or if the Commission on its own motion believes that a formal
hearing is required, further notice of such hearing will be duly given.
Under the procedure herein provided for, unless otherwise advised,
it will be unnecessary for Southern to appear or be represented at the
hearing.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 97-22207 Filed 8-20-97; 8:45 am]
BILLING CODE 6717-01-M