98-22500. Columbia Gas Transmission Corporation; Notice of Request Under Blanket Authorization
[Federal Register Volume 63, Number 162 (Friday, August 21, 1998)]
[Notices]
[Page 44854]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-22500]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP98-711-000]
Columbia Gas Transmission Corporation; Notice of Request Under
Blanket Authorization
August 17, 1998.
Take notice that on August 6, 1998, Columbia Gas Transmission
Corporation (Columbia), 12801 Fair Lakes Parkway, Fairfax, Virginia
22030, filed in Docket No. CP98-711-000 a request pursuant to Sections
157.205 and 157.211 of the Commission's Regulations under the Natural
Gas Act (18 CFR 157.205, 157.211) for authorization to construct and
operate a new point of delivery at the request of the City of Lancaster
in Fairfield County, Ohio, under Columbia's blanket certificate issued
in Docket No. CP83-76-000 pursuant to Section 7 of the Natural Gas Act,
all as more fully set forth in the request that is on file with the
Commission and open to public inspection.
Columbia states that the construction of the new delivery point has
been requested by City of Lancaster for firm transportation service for
residential, commercial and industrial service. City of Lancaster has
not requested an increase in its total firm entitlements in conjunction
with this request. The estimated cost to construct the new point of
delivery is $23,164 and City of Lancaster will reimburse Columbia 100%
for the cost. Columbia states that the estimated quantities of natural
gas to be delivered at the new point of delivery is 15,000 Dth/day and
1,000,000 Mcf/annually. Interconnecting facilities will consist of a 6-
inch tap and valve.
Columbia states that the new point of delivery will have no effect
on peak day and annual deliveries, that its existing tariff does not
prohibit addition of new delivery points and that deliveries will be
accomplished without detriment of disadvantage to its other customers
and that the total volumes delivered will not exceed total volumes
authorized prior to this request.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 98-22500 Filed 8-20-98; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 08/21/1998
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 98-22500
- Pages:
- 44854-44854 (1 pages)
- Docket Numbers:
- Docket No. CP98-711-000
- PDF File:
-
98-22500.pdf