2012-20487. Application To Export Electric Energy; TexMex Energy, LLC  

  • Start Preamble

    AGENCY:

    Office of Electricity Delivery and Energy Reliability, DOE.

    ACTION:

    Notice of application.

    SUMMARY:

    TexMex Energy, LLC (TexMex) has applied to renew its authority to transmit electric energy from the United States to Mexico pursuant to section 202(e) of the Federal Power Act (FPA).

    DATES:

    Comments, protests, or motions to intervene must be submitted on or before September 20, 2012.

    ADDRESSES:

    Comments, protests, or motions to intervene should be addressed to: Christopher Lawrence, Office of Electricity Delivery and Energy Reliability, Mail Code: OE-20, U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585-0350. Because of delays in handling conventional mail, it is recommended that documents be transmitted by overnight mail, by electronic mail to Christopher.Lawrence@hq.doe.gov, or by facsimile to 202-586-8008.

    Start Further Info Start Printed Page 50487

    FOR FURTHER INFORMATION CONTACT:

    Christopher Lawrence (Program Office) at 202-586-5260, or by email to Christopher.Lawrence@hq.doe.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Exports of electricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(f) of the Department of Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require authorization under section 202(e) of the FPA (16 U.S.C. 824a(e)).

    On February 22, 2007 the Department of Energy (DOE) issued Order No. EA-294-A, which authorized TexMex to transmit electric energy from the United States to Mexico as a power marketer for a five-year term using existing international transmission facilities. That authority expired on February 22, 2012. On July 23, 2012, TexMex filed an application with DOE for renewal of the export authority contained in Order No. EA-294-A for an additional five-year term.

    It is reasonable to presume that all of the electric energy that TexMex proposes to export to Mexico will be surplus energy purchased from electric utilities, Federal power marketing agencies, and other entities within the United States. The existing international transmission facilities to be utilized by TexMex have previously been authorized by Presidential permits issued pursuant to Executive Order 10485, as amended, and are appropriate for open access transmission by third parties.

    Procedural Matters: Any person desiring to be heard in this proceeding should file a comment or protest to the application at the address provided above. Protests should be filed in accordance with Rule 211 of the Federal Energy Regulatory Commission's (FERC) Rules of Practice and Procedures (18 CFR 385.211). Any person desiring to become a party to these proceedings should file a motion to intervene at the above address in accordance with FERC Rule 214 (385.214). Five copies of such comments, protests, or motions to intervene should be sent to the address provided above on or before the date listed above.

    Comments on the TexMex application to export electric energy to Mexico should be clearly marked with OE Docket No. EA-294-B. An additional copy is to be provided directly to Guillermo Gonzalez G., c/o Protama S.A. de C.V., Tonala 44, Col. Roma, Mexico D.F., Mexico 06700 and Douglas F. John and Matthew T. Rick, John & Hengerer, 1730 Rhode Island Ave. NW., Suite 600, Washington, DC 20036. A final decision will be made on this application after the environmental impacts have been evaluated pursuant to DOE's National Environmental Policy Act Implementing Procedures (10 CFR Part 1021) and after a determination is made by DOE that the proposed action will not have an adverse impact on the reliability of the U.S. electric power supply system.

    Copies of this application will be made available, upon request, for public inspection and copying at the address provided above, by accessing the program Web site at http://energy.gov/​node/​11845 or by emailing Angela Troy at Angela.Troy@hq.doe.gov.

    Start Signature

    Issued in Washington, DC, on August 14, 2012.

    Jon Worthington,

    Deputy Assistant Secretary, Office of Electricity Delivery and Energy Reliability.

    End Signature End Supplemental Information

    [FR Doc. 2012-20487 Filed 8-20-12; 8:45 am]