94-20484. Arizona Public Service Company, et al.; Electric Rate and Corporate Regulation Filings, August 12, 1994.  

  • [Federal Register Volume 59, Number 161 (Monday, August 22, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-20484]
    
    
    [[Page Unknown]]
    
    [Federal Register: August 22, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    Federal Energy Regulatory Commission
    [Docket No. EL94-53-000, et al.]
    
     
    
    Arizona Public Service Company, et al.; Electric Rate and 
    Corporate Regulation Filings, August 12, 1994.
    
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Arizona Public Service Company
    
    [Docket No. EL94-53-000]
    
        Take notice that on August 5, 1994, Arizona Public Service Company 
    (APS) tendered for filing revised Fuel Cost Adjustment Cost Rate Sheet 
    Exhibits to reflect accounting treatment afforded Spent Nuclear 
    Disposal Cost refunds issued by the United States Department of Energy 
    covering the period October, 1986, through January, 1994, in accordance 
    with a Commission Letter Order dated July 22, 1994, issued in this 
    Docket.
        APS requests a waiver of the Commission Notice Requirements, 18 CFR 
    35.3 to allow for an effective date of October 1, 1986. APS also 
    requests waiver of Sec. 35.14 to the extent necessary.
        Copies of this filing have been served upon the California Public 
    Utilities Commission, the Arizona Corporation Commission and the 
    affected parties, as follows: 
    
    ------------------------------------------------------------------------
                                                                    APS/FPC/
                                                                      FERC  
                            Customer name                             rate  
                                                                    schedule
                                                                       No.  
    ------------------------------------------------------------------------
    Electrical District No. 3.....................................        12
    Tohomo O'Odham Utility Authority\1\...........................        52
    Welton-Mohawk Irrigation & Drainage District..................        58
    Arizona Power Authority.......................................        59
    Colorado River Indian Irrigation Project......................        65
    Electrical District No. 1.....................................        68
    Town of Wickenburg............................................        74
    Southern California Edison Company............................       120
    Electrical District No. 6.....................................       126
    Electrical District No. 7.....................................       128
    Electrical District No. 8.....................................       140
    Aguila Irrigation District....................................       141
    McMullen Valley Water Conservation & Drainage District........       142
    Tonopah Irrigation District...................................       143
    Citizens Utilities Company....................................       149
    Harquahala Valley Power District..............................       153
    Buckeye Water Conservation & Drainage District................       155
    Roosevelt Irrigation District.................................       158
    Maricopa County Municipal Water Conservation District.........       168
    City of Williams..............................................       192
    San Carlos Indian Irrigation Project..........................    \2\201
    ------------------------------------------------------------------------
    \1\Previously Papago Tribal Utility Authority.                          
    \2\Previously APS-FPC Rate Schedule No. 66.                             
    
        Comment date: August 26, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    2. North American Energy Conservation, Inc.
    
    [Docket No. ER94-152-002]
    
        Take notice that on July 28, 1994, North American Energy 
    Conservation, Inc. filed certain information as required by the 
    Commission's February 10, 1994, letter order in Docket No. ER94-152-
    000. Copies of North American Energy Conservation, Inc.'s informational 
    filing are on file with the Commission and are available for public 
    inspection.
    
    3. Howell Power Systems, Inc.
    
    [Docket No. ER94-178-002]
    
        Take notice that on August 1, 1994, Howell Power Systems, Inc. 
    filed certain information as required by the Commission's January 14, 
    1994, letter order in Docket No. ER94-178-000. Copies of Howell Power 
    Systems, Inc.'s informational filing are on file with the Commission 
    and are available for public inspection.
    
    4. DC Tie, Inc.
    
    [Docket No. ER91-435-013]
    
        Take notice that on July 29, 1994, DC Tie, Inc. (DC Tie) filed 
    certain information as required by the Commission's July 11, 1991, 
    letter order in Docket No. ER91-435-000. Copies of DC Tie's 
    informational filing are on file with the Commission and are available 
    for public inspection.
    
    5. Louis Dreyfus Electric Power, Inc.
    
    [Docket No. ER92-850-007]
    
        Take notice that on July 26, 1994, Louis Dreyfus Electric Power, 
    Inc. (Dreyfus) filed certain information as required by the 
    Commission's December 2, 1992, letter order in this proceeding, 61 FERC 
    61,303 (1992). Copies of Dreyfus' informational filing are on file 
    with the Commission and are available for public inspection.
    
    6. AES Power, Inc.
    
    [Docket No. ER94-890-002]
    
        Take notice that on July 29, 1994, AES Power, Inc. filed certain 
    information as required by the Commission's April 8, 1994, letter order 
    in Docket No. ER94-890-000. Copies of AES Power, Inc.'s informational 
    filing are on file with the Commission and are available for public 
    inspection.
    
    7. Electric Clearinghouse, Inc.
    
    [Docket No. ER94-968-002]
    
        Take notice that on July 29, 1994, Electric Clearinghouse, Inc. 
    filed certain information as required by the Commission's April 7, 
    1994, letter order in Docket No. ER94-968-000. Copies of Electric 
    Clearinghouse, Inc.'s informational filing are on file with the 
    Commission and are available for public inspection.
    
    8. Eclipse Energy, Inc.
    
    [Docket No. ER94-1099-001]
    
        Take notice that on July 29, 1994, Eclipse Energy, Inc. (Eclipse), 
    filed certain information as required by the Commission's June 15, 
    1994, letter order in Docket No. ER94-1099-000. Copies of Eclipse's 
    informational filing are on file with the Commission and are available 
    for public inspection.
    
    9. Direct Electric Inc.
    
    [Docket No. ER94-1161-001]
    
        Take notice that on August 1, 1994, Direct Electric Inc. (Direct), 
    filed certain information as required by the Commission's June 15, 
    1994, letter order in Docket No. ER94-1161-000. Copies of Direct's 
    informational filing are on file with the Commission and are available 
    for public inspection.
    
    10. New York State Electric & Gas Corporation
    
    [Docket No. ER94-1535-000]
    
        Take notice that on August 4, 1994, New York State Electric & Gas 
    Corporation (NYSEG) tendered for filing pursuant to Sec. 35.12 of the 
    Federal Energy Regulatory Commission's Rules of Practice and Procedure, 
    18 CFR 35.12 (1993), as an initial rate schedule, an agreement with 
    Allegheny Electric Cooperative (AEC). The agreement provides a 
    mechanism pursuant to which the parties can enter into separately 
    scheduled transactions under which NYSEG will sell to AEC and AEC will 
    purchase from NYSEG either capacity and associated energy or energy 
    only as the parties may mutually agree.
        NYSEG requests that the agreement become effective on August 5, 
    1994, so that the parties may, if mutually agreeable, enter into 
    separately scheduled transactions under the agreement. NYSEG has 
    requested waiver of the notice requirements for good cause shown.
        NYSEG served copies of the filing upon the New York State Public 
    Service Commission and AEC.
        Comment date: August 26, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    11. New England Power Company
    
    [Docket No. ER94-1537-000]
    
        Take notice that on August 5, 1994, New England Power Company 
    (NEP), tendered for filing a proposed addition of two entitlements for 
    Boston Edison Company under NEP's FERC Electric Tariff, Original Volume 
    No. 3.
        Comment date: August 26, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    12. Equitable Resources Marketing Company
    
    Equitable Power Services Company
    
    [Docket No. ER94-1539-000]
    
        Take notice that on August 5, 1994, Equitable Resources Marketing 
    Company (Equitable) tendered for filing pursuant to 18 CFR 35.15 a 
    notice of withdrawal of its FERC Electric Rate Schedule No. 1, 
    effective no less than 60 days from the date of filing. Equitable 
    Resources is canceling its rate schedule so that Equitable Power 
    Services Company (Equitable Power) can take over its electric power 
    marketing business. Equitable Power, in turn, tendered for filing 
    pursuant to Rule 205, 18 CFR 385.205, a petition for waivers and 
    blanket approvals under various regulations of the Commission and for 
    an order accepting its FERC Electric Rate Schedule No. 1 to be 
    effective October 4, 1994.
        Equitable Power intends to engage in electric power and energy 
    transactions as a marketer and a broker. In transactions where 
    Equitable Power sells electric energy it proposes to make such sales on 
    rates, terms, and conditions to be mutually agreed to with the 
    purchasing party. Equitable Power is not in the business of generating, 
    transmitting, or distributing electric power.
        Comment date: August 26, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    13. Alabama Power Company
    
    [Docket No. ER94-1540-000]
    
        Take notice that on August 8, 1994, Alabama Power Company, tendered 
    for filing a Delivery Point Specification Sheet dated as of August 15, 
    1994, which reflect the addition of a delivery point to the City of 
    Dothan. This delivery point will be served under the terms and 
    conditions of the Agreement for Partial Requirements Service and 
    Complementary Services between Alabama Power Company and the Alabama 
    Municipal Electric Authority dated February 24, 1986, being designated 
    at FERC Rate Schedule No. 165. The parties request an effective date of 
    August 15, 1994, for the addition of said delivery point.
        Comment date: August 26, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    14. Illinois Power Company
    
    [Docket No. ER94-1541-000]
    
        Take notice that on August 8, 1994, Illinois Power Company (IP) 
    tendered for filing a change to Appendix A to the Interconnection 
    Agreement between Central Illinois Power Service Company (CIPS), 
    Illinois Power Company (IP), and Union Electric Company (UE). The 
    change provides for an additional point of interconnection between CIPS 
    and IP, CIPS-IP Connection 42--Rising. IP proposes an effective date of 
    July 18, 1994, and therefore, requests waiver of the Commission's 
    notice requirement.
        IP also advises that it is cancelling Appendix ``C'' to the Reserve 
    and Emergency Interchange Agreement dated December 15, 1993.
        IP also tenders for filing changes to the Facility Use Agreement 
    between IP and CIPS dated January 17, 1956, including the addition of 
    Appendix ``V'' and cancellation of Appendix ``E''.
        Copies of the filing have been served on CIPS, UE, and the Illinois 
    Commerce Commission.
        Comment date: August 26, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    15. Black Hills Corporation
    
    [Docket No. ER94-1542-000]
    
        Take notice that Black Hills Corporation, which operates its 
    electric utility business under the assumed name of Black Hills Power 
    and Light Company (Black Hills) on August 8, 1994, tendered for filing 
    an Economy Power Sale tariff and executed service agreements with Tri-
    State Generation and Transmission Association, Inc. and Public Service 
    Company of Colorado.
        Copies of the filing were provided to Basin Electric Power 
    Cooperative, City of Gillette, Wyoming, Pacific Power & Light Company, 
    Montana Power Company, Platte River Power Authority, Public Service 
    Company of Colorado, Tri-State Generation and Transmission Association, 
    Western Area Power Administration (Loveland and Billings area), and the 
    regulatory commission of each of the states of Montana, South Dakota, 
    and Wyoming.
        Black Hills has requested that further notice requirement be waived 
    and the tariff and executed service agreements be allowed to become 
    effective August 8, 1994.
        Comment date: August 26, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    16. Portland General Electric
    
    [Docket No. ER94-1543-000 Company]
    
        Take notice that on August 9, 1994, Portland General Electric 
    Company (PGE), tendered for filing a tariff of general service 
    providing for: Firm capacity/Energy service; Economy Energy Service; 
    Provisional Energy Service; Exchange Service; Unit Contingent Capacity 
    and/or Energy Service; Emergency Energy Service; Storage and Return of 
    Energy Service.
        Copies of the filing were served upon the list of entities, 
    including all proposed customers under this tariff, appearing on the 
    Certificate of Service attached to the filing letter.
        Comment date: August 26, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    17. Pennsylvania Electric Company
    
    [Docket No. ER94-1544-000]
    
        Take notice that on August 9, 1994, Pennsylvania Electric Company 
    (Penelec) tendered for filing a proposed reduction in its charges to 
    Allegheny Electric Cooperative, Inc. (Allegheny Cooperative, (which is 
    registered to do business in New Jersey, so as to eliminate from such 
    charges Pennsylvania gross receipts taxes with respect to the 
    deliveries by Penelec to Allegheny Cooperative for Allegheny 
    Cooperative's resale to its New Jersey member cooperative, Sussex Rural 
    Electric Cooperative (Sussex), and subsequently to the New Jersey 
    members and customers of Sussex. Such power and energy is sold and 
    delivered to Allegheny Cooperative through a delivery point located in 
    Wantage Township, Sussex County, New Jersey and will be billed by 
    Penelec to Allegheny Electric Cooperative, Inc., P.G. Box 190, 
    Philipsburg, NJ 08865. The parties intend for the reduction in charges 
    to become effective as of July 1, 1994, and Penelec requests waiver of 
    the Commission's prior notice requirements. Penelec states that it has 
    served copies of this filing on the Pennsylvania Public Utility 
    Commission.
        Comment date: August 26, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    18. Iowa-Illinois Gas and Electric Company
    
    [Docket No. ER94-1547-000]
    
        Take notice that Iowa-Illinois Gas and Electric Company (Iowa-
    Illinois), 206 East Second Street, P.O. Box 4350, Davenport, Iowa 
    52808, on August 10, 1994, tendered for filing pursuant to Sec. 35.12 
    of the Regulations under the Federal Power Act the initial rate 
    schedules in the form of Facilities Schedule No. 3, relating to Walcott 
    Substation, dated July 12, 1994, and Facilities Schedule No. 4, 
    relating to Blue Grass REC, dated July 12, 1994, to Service Schedule C 
    to the Interconnection Agreement dated June 13, 1983, between Iowa-
    Illinois and Central Iowa Power Cooperative (CIPCO).
        Iowa-Illinois states that the Facilities Schedules are a part of a 
    major economic development effort by government and business leaders in 
    the state of Iowa to locate a new $360 million steel mill to be owned 
    and operated by IPSCO, Inc. (IPSCO) within the state. As a part of the 
    effort, the state of Iowa enacted new legislation to provide economic 
    incentives to IPSCO to locate the mill in Muscatine County, Iowa. The 
    construction of the mill in Iowa is expected to provide approximately 
    350 additional jobs by 1997 and an increase in state and local tax 
    revenues of approximately $143 million.
        CIPCO will provide electric energy to the steel mill. However, to 
    deliver the electric energy to the steel mill, utilization of Iowa-
    Illinois' transmission facilities and the construction of new 
    transmission facilities by CIPCO will be required. The Facilities 
    Schedules provide for the utilization, construction and modification of 
    these facilities.
        CIPCO plans to serve IPSCO's steel mill through two transmission 
    sources utilizing Iowa-Illinois' transmission facilities. One source 
    will require CIPCO to convert an existing 69 kV line between Iowa-
    Illinois' Substation 56 and CIPCO's Fair Station to 161 kV, disconnect 
    the line at Fair Station and connect it to the IPSCO Substation. The 
    other source will require CIPCO to construct a new 345 kV transmission 
    line extending from the new Walcott Substation and terminating at the 
    IPSCO Substation adjacent to the steel mill. Under Facilities Schedule 
    No. 3, CIPCO's new line will interconnect at the Walcott Substation 
    with Iowa-Illinois's 345 kV transmission line which extends from Hills 
    Substation to Substation 56. CIPCO will own Walcott Substation and 
    Iowa-Illinois will operate and maintain the substation at CIPCO's 
    expense.
        The portion of the transmission service which uses the 
    interconnection at Substation 56 will be provided pursuant to the 
    Agreement for Interconnection of Transmission Facilities dated March 4, 
    1963 entered into by Iowa-Illinois, Iowa Electric Light and Power 
    Company (predecessor in interest to IES Utilities Inc.) and Eastern 
    Iowa Light and Power Cooperative (predecessor in interest to CIPCO). 
    The remaining transmission service will be provided as required by 
    Facilities Schedule No. 3.
        Under Facilities Schedule No. 4, Iowa-Illinois will supply all 
    energy required at CIPCO's Blue Grass REC Substation to the Point of 
    Connection between CIPCO and Iowa-Illinois. CIPCO will deliver an 
    equivalent amount of energy including losses on a scheduled basis to 
    Iowa-Illinois at the Point of Connection.
        The Facilities Schedules provide that they will be effective upon 
    their acceptance for filing by the Commission. Iowa-Illinois requests 
    the Commission to accept the Facilities Schedules for filing by 
    November 30, 1994.
        Copies of the filing were served upon the Illinois Commerce 
    Commission, the Iowa Utilities Board and CIPCO.
        Comment date: August 26, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    19. Nevada Power Company
    
    [Docket No. FA92-38-002]
    
        Take notice that on August 1, 1994, Nevada Power Company tendered 
    for filing its refund report in the above-referenced docket. Nevada 
    Power Company's revised refund report corrects for certain errors 
    contained in its initial refund report filed on September 20, 1993, and 
    noticed on October 27, 1993, under Docket No. FA92-38-001.
        Comment date: August 26, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    20. Washington Power Company, L.P.
    
    [Docket No. QF88-20-001]
    
        On August 4, 1994, as supplemented on August 5, 1994, Washington 
    Power Company, L.P. (Applicant) of 7201 Hamilton Boulevard, Allentown, 
    Pennsylvania 18195-1501, submitted for filing an application for 
    certification of a facility as a qualifying small power production 
    facility pursuant to Sec. 292.207(b) of the Commission's Regulations. 
    No determination has been made that the submittal constitutes a 
    complete filing.
        The facility, which will be located in Robinson Township, 
    Washington County, Pennsylvania, consists of two circulating fluidized 
    bed boilers, a steam turbine generator, and a 3/4 mile 138 kV 
    transmission line, with a net electric power production capacity of 
    approximately 85 MW. According to the Applicant, the primary energy 
    source of the facility is bituminous coal waste. Construction of the 
    facility commenced in July of 1994.
        Comment date: Thirty days after publication of this notice in the 
    Federal Register in accordance with Standard Paragraph E at the end of 
    this notice.
    
    Standard Paragraphs
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C. 
    20426, in accordance with Rules 211 and 214 of the Commission's Rules 
    of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    
    Lois D. Cashell,
    Secretary.
    [FR Doc. 94-20484 Filed 8-19-94; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
08/22/1994
Department:
Federal Energy Regulatory Commission
Entry Type:
Uncategorized Document
Document Number:
94-20484
Dates:
August 26, 1994, in accordance with Standard Paragraph E at the end of this notice.
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: August 22, 1994, Docket No. EL94-53-000, et al.