96-21539. Alabama Electric Cooperative; Finding of No Significant Impact
[Federal Register Volume 61, Number 165 (Friday, August 23, 1996)]
[Notices]
[Pages 43522-43523]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-21539]
-----------------------------------------------------------------------
DEPARTMENT OF AGRICULTURE
Rural Utilities Service
Alabama Electric Cooperative; Finding of No Significant Impact
AGENCY: Rural Utilities Service, USDA.
ACTION: Notice of finding of no significant impact.
-----------------------------------------------------------------------
SUMMARY: Notice is hereby given that the Rural Utilities Service (RUS)
has made a finding of no significant impact (FONSI) with respect to its
action related to the construction of two, 113 megawatt (MW) combustion
turbines and associated facilities by Alabama Electric Cooperative
(AEC). The FONSI is the conclusion of an Environmental Assessment
prepared by RUS. The Environmental Assessment is based on a
environmental analysis submitted to RUS by AEC. RUS conducted an
independent evaluation of the environmental analysis and concurs with
its scope and content.
FOR FURTHER INFORMATION CONTACT: Lawrence R. Wolfe, Senior
Environmental Protection Specialist, Engineering and Environmental
Staff, RUS, South Agriculture Building, Ag Box 1571, Washington, DC
20250, telephone (202) 720-1784.
SUPPLEMENTARY INFORMATION: The proposed new combustion turbines would
be installed at AEC's existing McIntosh Power Plant located on the west
side of Highway 43 at mile marker 41 in McIntosh, Alabama.
The McIntosh Combustion Turbine Project consists of the
installation of two Siemens v84.2 combustion turbine generators to be
located adjacent to AEC's existing McIntosh Power Plant Unit 1
(compressed air energy storage generating unit). The new units will be
located south of the existing unit 1 in the area formerly reserved for
a second compressed air energy storage unit which AEC has determined to
not be cost-effective. The proposed two new units will be referred as
McIntosh Power Plant Units 2 and 3. Each of the units will have a
normal maximum output rating of 109 MWs at 950 deg. Fahrenheit. The
units will be capable of burning either natural gas or fuel oil and
have a maximum rating of approximately 113 MWs during peak firing mode.
As part of the project, a new 1 million gallon fuel oil storage tank
and a 1.8 million gallon demineralized water tank will be constructed
at the western corners of Unit 1. There will also be modifications to
the existing transmission substation on site to link the electric power
output of the new units to the existing transmission line. The existing
gas transmission system in the area has adequate capacity to serve
Units 2 and 3. The existing 115 kilovolt (kV) electric transmission
lines have adequate capacity to feed the power output of the new units
to AEC's transmission grid. A 1.5-mile natural gas pipeline will be
constructed within an existing pipeline to intertie with Bay Gas
Storage's 20-inch market line.
Alternatives to be considered by RUS and Alabama Electric
Cooperative to Alabama Electric Cooperative constructing the generation
facility proposed include: (a) no action, (b) purchase of peaking
capacity from independent power producers, co-generators, and other
electric utilities, and (c) constructing the proposed generation
facilities at alternative site locations.
Copies of the environmental assessment and FONSI are available for
review at, or can be obtained from, RUS at the address provided herein
or from Mr. Mike Noel, Alabama Electric Cooperative, P.O. Box 550,
Andalusia, Alabama, telephone (334) 222-2571. Interested parties
wishing to comment on the adequacy of the Environmental Assessment
should do so within 30 days of the publication of this notice. RUS will
take no action that would approve clearing or construction activities
related to these new combustion turbine units prior to the expiration
of the 30-day comment period.
[[Page 43523]]
Dated: August 19, 1996.
Adam M. Golodner,
Deputy Administrator. Program Operations
[FR Doc. 96-21539 Filed 8-22-96; 8:45 am]
BILLING CODE 3410-15-P
Document Information
- Published:
- 08/23/1996
- Department:
- Rural Utilities Service
- Entry Type:
- Notice
- Action:
- Notice of finding of no significant impact.
- Document Number:
- 96-21539
- Pages:
- 43522-43523 (2 pages)
- PDF File:
-
96-21539.pdf