2023-18175. Notice of Final Federal Agency Actions on the US 380 Project in Texas  

  • Start Preamble

    AGENCY:

    Texas Department of Transportation (TxDOT), Federal Highway Administration (FHWA), U.S. Department of Transportation.

    ACTION:

    Notice of limitation on claims for judicial review of actions by TxDOT and Federal agencies.

    SUMMARY:

    This notice announces actions taken by TxDOT and Federal agencies that are final. The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by TxDOT pursuant to an assignment agreement executed by FHWA and TxDOT. These actions grant licenses, permits, and approvals for the US 380 project, from Teel Parkway/Championship Drive to Lakewood Drive in Collin and Denton Counties, Texas.

    DATES:

    By this notice, TxDOT is advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of TxDOT and Federal agency actions on the US 380 project will be barred unless the claim is filed on or before the deadline. For the US 380 project the deadline is January 22, 2024. If the Federal law that authorizes judicial review of a claim provides a time period of less than 150 days for filing such a claim, then that shorter time period still applies.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Patrick Lee, Environmental Affairs Division, Texas Department of Transportation, 125 East 11th Street, Start Printed Page 57517 Austin, Texas 78701; telephone: (512) 416–2358; email: Patrick.Lee@txdot.gov. TxDOT's normal business hours are 8:00 a.m.–5:00 p.m. (central time), Monday through Friday.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The US 380 project will extend from Teel Parkway/Championship Drive to Lakewood Drive in Collin and Denton Counties, Texas. The project will reconstruct the existing roadway to a six-lane controlled-access freeway with one-way two to three lane frontage roads in each direction. The facility will also include ramps, direct connectors, frontage roads, and arterial roadway extensions to support connectivity to the existing roadway network. The project is approximately 5.9 miles in length.

    The actions by TxDOT and Federal agencies and the laws under which such actions were taken are described in the Final Environmental Assessment, Finding of No Significant Impact (FONSI) issued on July 25, 2023, and other documents in the TxDOT project file. The Final Environmental Assessment, FONSI, and other documents in the TxDOT project file are available by contacting the TxDOT Dallas District Office at 4777 E Highway 80, Mesquite, TX 75150; telephone: (214) 320–4480.

    The environmental review, consultation, and other actions required by applicable Federal environmental laws for the US 380 project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 9, 2019, and executed by FHWA and TxDOT.

    Notice is hereby given that TxDOT and Federal agencies have taken final agency actions by issuing licenses, permits, and approvals for the US 380 project in the State of Texas.

    This notice applies to all TxDOT and Federal agency decisions as of the issuance date of this notice and all laws under which such actions were taken, including but not limited to:

    1. General: National Environmental Policy Act (NEPA) [42 U.S.C. 4321–4351]; Federal-Aid Highway Act [23 U.S.C. 109].

    2. Air: Clean Air Act [42 U.S.C. 7401–7671(q)].

    3. Land: Section 4(f) of the Department of Transportation Act of 1966 [49 U.S.C. 303]; Landscaping and Scenic Enhancement (Wildflowers) [23 U.S.C. 319].

    4. Wildlife: Endangered Species Act [16 U.S.C. 1531–1544 and section 1536], Marine Mammal Protection Act [16 U.S.C. 1361], Fish and Wildlife Coordination Act [16 U.S.C. 661–667(d)], Migratory Bird Treaty Act [16 U.S.C. 703–712].

    5. Historic and Cultural Resources: Section 106 of the National Historic Preservation Act of 1966, as amended [54 U.S.C. 300101 et seq.]; Archeological Resources Protection Act of 1977 [16 U.S.C. 470(aa)–11]; Archeological and Historic Preservation Act [54 U.S.C. 312501 et seq.]; Native American Grave Protection and Repatriation Act (NAGPRA) [25 U.S.C. 3001–3013].

    6. Social and Economic: Civil Rights Act of 1964 [42 U.S.C. 2000(d)–2000(d)(1)]; American Indian Religious Freedom Act [42 U.S.C. 1996]; Farmland Protection Policy Act (FPPA) [7 U.S.C. 4201–4209].

    7. Wetlands and Water Resources: Clean Water Act [33 U.S.C. 1251–1377] (Section 404, Section 401, Section 319); Land and Water Conservation Fund (LWCF) [16 U.S.C. 4601–4604]; Safe Drinking Water Act (SDWA) [42 U.S.C. 300(f)–300(j)(6)]; Rivers and Harbors Act of 1899 [33 U.S.C. 401–406]; Wild and Scenic Rivers Act [16 U.S.C. 1271–1287]; Emergency Wetlands Resources Act [16 U.S.C. 3921, 3931]; TEA–21 Wetlands Mitigation [23 U.S.C. 103(b)(6)(m), 133(b)(11)]; Flood Disaster Protection Act [42 U.S.C. 4001–4128].

    8. Executive Orders: E.O. 11990 Protection of Wetlands; E.O. 11988 Floodplain Management; E.O. 12898 Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations; E.O. 11593 Protection and Enhancement of Cultural Resources; E.O. 13007 Indian Sacred Sites; E.O. 13287 Preserve America; E.O. 13175 Consultation and Coordination with Indian Tribal Governments; E.O. 11514 Protection and Enhancement of Environmental Quality; E.O. 13112 Invasive Species.

    (Catalog of Federal Domestic Assistance Program Number 20.205, Highway Planning and Construction.)

    Authority:23 U.S.C. 139(l)(1).

    Start Signature

    Michael T. Leary,

    Director, Planning and Program Development, Federal Highway Administration.

    End Signature End Supplemental Information

    [FR Doc. 2023–18175 Filed 8–22–23; 8:45 am]

    BILLING CODE 4910–22–P

Document Information

Published:
08/23/2023
Department:
Federal Highway Administration
Entry Type:
Notice
Action:
Notice of limitation on claims for judicial review of actions by TxDOT and Federal agencies.
Document Number:
2023-18175
Dates:
By this notice, TxDOT is advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of TxDOT and Federal agency actions on the US 380 project will be barred unless the claim is filed on or before the deadline. For the US 380 project the deadline is January 22, 2024. If the Federal law that authorizes judicial review of a claim provides a time period of less than 150 days for filing such a claim, then that shorter time period still applies.
Pages:
57516-57517 (2 pages)
PDF File:
2023-18175.pdf