[Federal Register Volume 59, Number 163 (Wednesday, August 24, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-20786]
[[Page Unknown]]
[Federal Register: August 24, 1994]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
[CGD 94-061]
Differential Global Positioning System, Lake Michigan Corridor
Region; Environmental Assessment
AGENCY: Coast Guard, DOT.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has prepared a Programmatic Environmental
Assessment (EA) and Finding of No Significant Impact (FONSI) for
implementing a Differential Global Positioning System (DGPS) Service in
the Lake Michigan Corridor Region of the United States. The EA
concluded that there will be no significant impact on the environment
and that preparation of an Environmental Impact Statement will not be
necessary. This notice announces the availability of the EA and FONSI
and solicits comments on them.
DATES: Comments must be received on or before September 23, 1994.
ADDRESSES: Comments may be mailed to the Executive Secretary, Marine
Safety Council, U.S. Coast Guard Headquarters, 2100 Second Street SW.,
Washington, DC 20593-0001, or may be delivered to room 3406 at the same
address between 8 a.m. and 3 p.m., Monday through Friday, except
Federal holidays. The telephone number is (202) 267-1477.
Copies of the EA and FONSI may be obtained by contacting LCDR
George Privon at (202) 267-0297 or faxing a request at (202) 267-4427.
A copy of the EA (less enclosures) is also available on the Electronic
Bulletin Board System (BBS) at the GPS Information Center (GPSIC) in
Alexandria, VA, (703) 313-5910. For information on the BBS, call the
GPSIC watchstander at (703) 313-5900.
FOR FURTHER INFORMATION CONTACT:
LCDR George Privon, Radionavigation Division, (202) 267-0297.
SUPPLEMENTARY INFORMATION:
Request for Comments
Copies of the Programmatic Environmental Assessment (EA) and
Finding of No Significant Impact (FONSI) are available as described
under ADDRESSES. The Coast Guard encourages interested persons to
comment on these documents. The Coast Guard may revise these documents
in view of the comments. If revisions are warranted, availability of
the revised documents will be announced by a later notice in the
Federal Register.
Background
As required by Congress, the Coast Guard is preparing to install
the equipment necessary to implement a Differential Global Positioning
System (DGPS) service in the Lake Michigan Corridor area of the United
States. DGPS is a new radionavigation service that improves upon the
100 meter accuracy of the existing Global Positioning System (GPS) to
provide an accuracy of better than 10 meters. For vessels, this degree
of accuracy is critical for precise electronic navigation in harbors
and harbor approaches and will reduce the number of vessel groundings,
collisions, personal injuries, fatalities, and potential hazardous
cargo spills resulting from such incidents.
After extensive study, the Coast Guard has selected two sites along
the Lake Michigan Corridor for the DGPS equipment. The sites are in the
vicinity of Sturgeon Bay Canal, WI and U.S. Coast Guard Base Milwaukee,
WI. The sites are used already for related purposes and were chosen, in
part, because their proposed use is consistent with their past and
present use, thus minimizing further impact on the environment. DGPS
signal transmissions will be broadcast in the marine radiobeacon
frequency band (283.5 to 325 KHz) using less than 50 watts (effective
radiated power). Signal transmissions at these low frequency and power
levels have not been found to be harmful to the surrounding
environment.
Proposed Installations at Each Site
(a) Radiobeacon Antenna--The Coast Guard proposes to install a 90
foot guyed antenna with an accompanying ground plane at the Sturgeon
Bay site and a 60 ft guyed antenna with an accompanying ground plane at
the Milwaukee site. A ground plane for these antennas consists of
approximately 120 copper radials (6 gauge copper wire) installed 6
inches (or less) beneath the soil and projecting outward from the
antenna base. The optimum radial length is between 200-300 feet, but
this length may be shortened to fit within property boundaries.
Wherever possible, a cable plow method will be used in the radial
installation to minimize soil disturbance. Installation of the ground
plane may require some clearing of trees and bushes on the site.
(b) DGPS Antennas--Each site will require two 10 foot masts to
support four small (4 inches by 18 inches diameter) receiving antennas.
The masts will be installed on a concrete foundation measuring
approximately 3 feet by 3 feet by 15 inches. These masts are needed to
support the primary and backup reference receivers and integrity
monitors. The location of the two masts will be in the vicinity of the
electronic equipment building or hut, but at least 50 feet to 100 feet
from existing structures.
(c) Equipment shelter--A 10 foot by 16 foot equipment hut will be
needed to house the DGPS equipment at each site.
(d) Utilities--The Coast Guard proposes to use available commercial
power as the primary source for the electronic equipment. A telephone
line will be required at each site for remote monitoring and operation.
Description of Each Site
The Sturgeon Bay Canal site is located within U.S. Army Corps of
Engineers property adjacent to Coast Guard Station Sturgeon Bay. The
site will require installation of a 90 foot guyed antenna and a 10 foot
by 16 foot equipment hut to house the DGPS electronic equipment.
The Coast Guard Base Milwaukee site is located on South Lincoln
Memorial Drive in southeast Milwaukee, WI. The site will require the
installation of a 60 foot guyed antenna and a 10 foot by 16 foot
equipment hut to house the DGPS electronic equipment.
Implementation of a DGPS service in the Lake Michigan Corridor
Region is determined to have no significant effect on the quality of
the human environment or require preparation of an Environmental Impact
Statement.
Dated: August 18, 1994.
G.A. Penington,
Rear Admiral, U.S. Coast Guard, Chief, Office of Navigation Safety and
Waterway Services.
[FR Doc. 94-20786 Filed 8-23-94; 8:45 am]
BILLING CODE 4910-14-M