-
Start Preamble
August 20, 2001.
On August 13, 2001, Vector Pipeline L.P. filed its initial standards of conduct.
Vector Pipeline L.P. states that it served copies of the filing on all customers and interested state commissions.
Any persons desiring to be heard or to protest said filing should file a motion to intervene or protest in this proceeding with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of Start Printed Page 44613the Commission's Rules of Practice and Procedure. (18 CFR 385.211 or 385.214) All such motions to intervene or protest should be filed on or before September 4, 2001. Protests will be considered by the Commission in determining the appropriate action to be taken but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a motion to intervene. Copies of this filing are on file with the Commission and are available for public inspection. This filing may also be viewed on the web at http://www.ferc.gov using the “RIMS” link, select “Docket#” and follow the instructions (call 202-208-2222 for assistance). Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's web site under the “e-Filing” link.
Start SignatureDavid P. Boergers,
Secretary.
[FR Doc. 01-21390 Filed 8-23-01; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 08/24/2001
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 01-21390
- Pages:
- 44612-44613 (2 pages)
- Docket Numbers:
- Docket No. MG01-28-000
- EOCitation:
- of 2001-08-20
- PDF File:
- 01-21390.pdf