-
Start Preamble
Take notice that on August 1, 2017, Natural Gas Pipeline Company of America LLC (Natural), at 3250 Lacey Road, Downers Grove, IL 60615, filed with the Federal Energy Regulatory Commission in the above referenced docket a petition to amend its certificate of public convenience and necessity in Docket No. CP11-547-000 for its 2012 Storage Optimization Project. Natural proposes to change the abandon of certain facilities at Compressor Station 310 (CS 310) located in Clinton County, Illinois, and Compressor Station 311 (CS 311) located in Piatt County, Illinois. Natural proposes to retain certain compressor units at CS 310 and CS 311 to reserve as redundant compression. These reserve units will only run if other units at these stations experience mechanical problems. Natural has previously received authority to abandon these units in place. Natural's filing is on file with the Commission and open to public inspection. Any questions regarding this petition to amend should be directed Bruce H. Newsome, Vice President, Natural Gas Pipeline Company of America LLC, 3250 Lacey Road, Suite 700, Downers Grove, IL 60515, or by calling (630)725-3070 (telephone) bruce_newsome@kindermorgan.com.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental analysis (EA) and place it into the Commission's public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Start Printed Page 40153Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff's issuance of the EA for this proposal. The filing of the EA in the Commission's public record for this proceeding or the issuance of a Notice of Schedule will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff's EA.
There are two ways to become involved in the Commission's review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 5 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding.
However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission's rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest.
Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission's environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission's environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission's final order.
The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the eFiling link at http://www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern Time on September 8, 2017.
Start SignatureDated: August 18, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-17953 Filed 8-23-17; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 08/24/2017
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2017-17953
- Dates:
- 5:00 p.m. Eastern Time on September 8, 2017.
- Pages:
- 40152-40153 (2 pages)
- Docket Numbers:
- Docket No. CP17-484-000
- PDF File:
- 2017-17953.pdf