[Federal Register Volume 60, Number 165 (Friday, August 25, 1995)]
[Notices]
[Pages 44341-44342]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-21208]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-5228-2]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared July 10, 1995 through August
11, 1995 pursuant to the Environmental Review Process (ERP), under
section 309 of the Clean Air Act and section 102(2)(c) of the National
Environmental Policy Act as amended. Requests for copies of EPA
comments can be directed to the Office of Federal Activities at (202)
260-5076.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated April 14, 1995 (60
FR 19047).
Draft EISs
ERP No. D-AFS-J65237-MT Rating EC2, Two Joe Timber Sales,
Implementation, Lolo National Forest, Superior Ranger District, St.
Regis River, Mineral County, MT.
Summary: EPA expressed environmental concerns regarding the
potential for increased sediment transport and localized effects upon
area bull trout populations. EPA suggested expanded commitment to water
quality and aquatics monitoring, and the collection of additional
information needed to fully assess and mitigate all potential impacts
of the management actions.
ERP No. D-BLM-J02032-WY Rating EC2, Moxa Arch Area Natural Gas
Development Expansion Project, Approvals, Right-of-Way Grants and COE
Section 404 Permit(s) Issuance, Sweetwater, Lincoln and Unita Counties,
WY.
[[Page 44342]]
Summary: EPA expressed environmental concerns about cumulative
impacts from this and numerous other proposed oil and gas activities in
Southwestern Wyoming. EPA encouraged BLM to use all available measures
in the current proposals to reduce levels of ground disturbance.
ERP No. D-COE-K32048-CA Rating LO, Port of Long Beach (POLB) Main
Channel Deepening and Navigation Improvements, Implementation, Queen's
Gate, San Pedro Bay, Los Angeles County, CA.
Summary: EPA had no objections to the proposed action. EPA did
suggest that the final document discuss the suitability of using
dredged sediment for cap material in the Los Angeles River Borrow Pit.
ERP No. D-DOA-K36112-AS Rating EC2, Aua Watershed Plan, Flood
Prevention and Watershed Protection, Funding, COE Section 404 Permit
and Right-of-Way Grant, Tutuila Island, Ma'oputasi County, AS.
Summary: EPA expressed environmental concerns regarding potential
impacts to wetlands and coral reefs. EPA requested additional
information to clarify the issues.
ERP No. D-UAF-E10007-GA Rating LO, F-15 Fighter Aircraft Conversion
at Dobbins Air Force Base (AFB), Marietta, GA to B-1B Bomber Aircraft
at Robins AFB, Warner Robins, GA and Training Airspace Modifactions
Servicing the Savannah Combat Readiness Training Center (CRTC) Area,
GA.
Summary: EPA does not anticipate any significant adverse
environmental effects attendant to this proposal.
ERP No. D-USA-G11029-AR Rating LO, Disposal of Chemical Agents and
Munitions Stored at Pine Bluff Arsenal, Construction and Operation,
Approval of Permits, Jefferson County, AR.
Summary: EPA had a lack of environmental objections with the
proposed action.
Final EISs
ERP No. F-AFS-E65043-00 Red-Cockaded Woodpecker (RCW) (Picoides
borealis) Repopulation, Habitat Management Areas, Implementation,
National Forests in the Southern Region.
Summary: EPA expressed environmental concerns regarding the impact
of timber harvest and oil and gas exploratory activities on the Red-
cockaded Woodpecker habitat. The Final EIS should address additional
mitigation measures.
ERP No. F-DOE-L09805-00 Business Plan to Operate Electric Utility
Market, Transmission Services and Fish and Wildlife Activities, Funding
and Implementation, WA, OR, ID, CA, NV, AZ, MT, WY, UT, NM and British
Columbia.
Summary: EPA expressed environmental concerns that the Final EIS
does not clearly document how the proposed action optimizes
conservation, resource protection and restoration objectives with the
business objectives.
ERP No. F-NPS-E64015-TN Obed Wild and Scenic River, General
Management Plan and Development Concept Plan, Implementation, Morgan
and Cumberland Counties, TN.
Summary: EPA expressed environmental concerns about upstream water
withdrawals from Clear Creek, threatening water quality and the value
of the Obed Wild and Scenic River. A comprehensive water resources
management and/or protection plan for the upstream watershed should be
prepared.
ERP No. F-NPS-L61200-WA Lake Chelan National Recreation Area
General Management Plan, Implementation, Chelan County, WA.
Summary: Review of the Final EIS has been completed and the project
found to be environmentally satisfactory. No formal comment letter was
sent to the preparing agency.
Dated: August 22, 1995
B. Katherine Biggs,
Associate Director, NEPA Compliance Division.
[FR Doc. 95-21208 Filed 8-24-95; 8:45 am]
BILLING CODE 6560-50-P