[Federal Register Volume 62, Number 164 (Monday, August 25, 1997)]
[Notices]
[Page 45007]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-22501]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
Notice of Availability
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Notice of availability of draft Environmental Impact Statement
(EIS), notice of public comment period and schedule of public hearings;
correction.
-----------------------------------------------------------------------
SUMMARY: This document contains a correction to the Notice referenced
in ACTION above, as published in the Federal Register on August 15,
1997 [62 FR 43768]. The Notice announces numerous times, that public
hearings will be held Wednesday, September 17, 1997, and Thursday,
September 18, 1997. At one location the date is incorrectly listed as
Thursday, October 18, 1997.
FOR FURTHER INFORMATION CONTACT: Jerome D. Schwartz, Environmental
Specialist, Federal Aviation Administration, Wind Shear Products Team,
AND-420, 800 Independence Avenue, SW, Washington, DC 20591, telephone
(202) 267-9841.
Correction of Publication: In the notice document on page 43768 in
the issue of Friday, August 15, 1997, make the following correction:
In the DATES section on page 43768, second column, at the last of
four references to the hearing on Thursday the 18th, the month is
listed as October. The month should be changed to read September.
Issued in Washington, DC on August 19, 1997.
Carl P. McCullough,
Product Lead, Wind Shear Products Team, AND-420.
[FR Doc. 97-22501 Filed 8-22-97; 8:45 am]
BILLING CODE 4910-13-M