2022-18224. Defense Federal Acquisition Regulation Supplement: Restriction on Acquisition of Tantalum (DFARS Case 2020-D007)  

  • Start Preamble

    AGENCY:

    Defense Acquisition Regulations System, Department of Defense (DoD).

    Start Printed Page 52343

    ACTION:

    Final rule.

    SUMMARY:

    DoD has adopted as final, with changes, an interim rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to implement a section of the National Defense Authorization Act for Fiscal Year 2020 that prohibits acquisition of tantalum metals and alloys from North Korea, China, Russia, and Iran.

    DATES:

    Effective August 25, 2022.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Ms. Kimberly Bass, telephone 703-717-3446.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    I. Background

    This final rule finalizes an interim rule that revised the DFARS to implement section 849 of the National Defense Authorization Act (NDAA) for Fiscal Year (FY) 2020 (Pub. L. 116-92) (10 U.S.C. 2533c). Section 849 adds tantalum to the definition of “covered materials” in 10 U.S.C. 2533c. With some exceptions, 10 U.S.C. 2533c prohibits the acquisition of any covered material melted or produced in any covered country (North Korea, China, Russia, or Iran), or any end item, manufactured in any covered country, that contains a covered material.

    DoD published an interim rule in the Federal Register at 85 FR 61500 on September 29, 2020, to implement section 849 of the NDAA for FY 2020. Nine respondents submitted public comments in response to the interim rule.

    II. Discussion and Analysis

    DoD reviewed the public comments in the development of the final rule. A discussion of the comments and the changes made to the rule as a result of those comments is provided, as follows:

    A. Summary of Significant Changes From the Interim Rule

    DoD made the following changes in the interim rule:

    1. At DFARS 225.7018-2(c), the applicability of the production phases for tantalum metals and alloys is revised to provide clarity by removing the reference to the inclusion of the reduction of tantalum chemicals such as oxides, chlorides, or potassium salts, to metal powder. A reference to the applicability of tantalum metals of any kind and alloys to the production processing steps includes the reduction or melting of any form of tantalum is also added. Additionally, the paragraph is revised to convey that the restriction includes the subsequent production steps for the reduction or melting of any form of tantalum to create tantalum metals including unwrought, powder, mill products, and alloys.

    2. For consistency with the plain language of the exact statutory text in accordance with section 849 of the NDAA for FY 2020 and 10 U.S.C. 2533c, at DFARS 225.7018-3(c) and DFARS 252.225-7052(c)(1), the phrase “of an end item that is” is replaced with the phrase “of an end item containing a covered material that is”.

    3. References to tantalum “metal and alloys” in the definition of covered material in the interim rule are revised to “metals and alloys” in the final rule for consistency with the exact statutory text at 10 U.S.C. 2533c.

    B. Analysis of Public Comments

    1. Strong Support for the Rule

    Comment: Two respondents strongly supported the interim rule. A respondent noted that the quantity of tantalum going into the defense industry is a manageable quantity and will have a negligible impact on U.S. businesses while affording the U.S. military a protection similarly enjoyed by the People's Republic of China with respect to tantalum products that are of U.S. origin. A respondent applauded the comprehensive scope of the rule regarding tantalum production, which is necessary to shield DoD weapon systems from unreliable sources.

    Response: DoD acknowledges the support for the rule.

    2. Impact on Business

    a. Impact on Customers

    Comment: A respondent commented that this rule will not be a problem. Tantalum going into the U.S. defense industry annually is a perfectly manageable quantity to make sure that Chinese material does not enter the U.S. defense industries final applications. Another respondent commented that this policy would bleed into civilian U.S. manufacturing supply chains. As a result of this rule and other non-conflict material restrictions on tantalum from Africa, there will be insufficient alternative acceptable tantalum units for the U.S. industry in the global market. The respondent further stated this will lead to a higher price, potential raw material shortfalls, and reduced profits and competitiveness for U.S. manufacturers and end products exported.

    Response: The rule is required to implement section 849 of the NDAA for FY 2020. It is a matter of national security to reduce U.S. dependence on the covered countries specified in 10 U.S.C. 2533c, because tantalum is an important element in the supply chain for the production of both DoD military systems and nonmilitary systems that DoD uses.

    b. Impact on Manufacturers

    Comment: A respondent stated this rule only focuses on defense applications; the amount of overall tantalum is manageable. Another respondent expects an initial period of higher pricing and supply chain impacts after which the tantalum markets will adjust. One respondent conveyed concerns that damage to competitiveness and efficiency due to the rule could lead to a relocation of manufacturing outside the United States and thereby reduce U.S. strength in critical manufacturing sectors. Members of the respondent's organization supported a retaliatory approach to China on tantalum policy, while the other half of the members believed it was counterproductive, as it would negatively impact U.S. civilian-use manufacturers and exporters.

    Response: DoD acknowledges the respondent's concern with initial impacts to U.S. manufacturers. The implementation of this prohibition is expected to decrease DoD's dependence on covered materials that originate in covered countries as a matter of national security. Tantalum is an important element in the supply chain for the production of both U.S. military systems and nonmilitary systems that DoD uses.

    3. Metals Trade Industry

    Comment: A respondent stated that they did not see the interim rule affecting the metals trade and metals industry generally, either domestically or internationally. The respondent further stated the price of tantalum will not increase since the amount of tantalum in question is minimal annually. Accordingly, the orders placed would separate defense and commercial consumer applications, will be balanced, and will not negatively impact consumers financially. The respondent also stated that U.S. companies are not allowed to sell tantalum to China and this interim rule is exactly the same.

    Response: DoD acknowledges the respondent's position and agrees that the impact of the rule on the metals industry will have minor impacts both domestically and internationally.

    4. Broader International Trade

    a. Potential Future U.S.-Wide Restriction

    Comment: A respondent discussed the overall impact of the interim rule on broader international trade and a Start Printed Page 52344 potential U.S.-wide restriction on the acquisition of tantalum in the future, from the designated regions or a potential change to consumer purchasing policy. The respondent also stated the importance of ensuring the scope of the rule remained only for tantalum for defense applications, since the defense tantalum market is small and manageable, and it should not be expanded further since U.S. companies do sell tantalum finished products to Chinese customers. The respondent further stated that China does not allow tantalum of U.S. origin.

    Response: The defense industry consumption of tantalum units is a small portion of the tantalum market with regard to global consumption. This rule is not going to impact the tantalum market as a whole.

    b. Potential Price Increases for Tantalum in the U.S. Supply Chain

    Comment: Several respondents discussed the impact on broader international trade as a result of the more restrictive implementation of the statute with regard to the criteria for the exception applicability to the entire end item versus the covered material within the end item. These respondents further stated the interim rule will have negative impacts to international trade, increased administrative burden on industry, and increased costs to the Government. A respondent stated that tantalum prices from non-covered countries have increased and may continue to do so. The respondent further stated the interim rule's applicability to DoD products may increase costs due to manufacturer's dual use of tantalum in the commercial and defense industries and the subsequent requirement for segregation of products to track the defense products in accordance with the statutory requirements.

    Response: The rule implements section 849 of the NDAA for FY 2020. Since the defense tantalum market is a small portion of the overall global market, DoD anticipates minimal impacts to international trade and minimal increased administrative burden on industry.

    5. Exception

    a. Entire End Item and Electronic Device

    Comment: A few respondents argued that the interim rule incorrectly applied an exception to the prohibition on procurement of covered materials found at 10 U.S.C. 2533c(c)(3). The interim rule provides an exception for end items that are also an electronic device. The respondents argued that this misapplies the statute, narrows the exception beyond what the statute intended, and makes part of the language of the statute superfluous.

    Response: DoD does agree that the omission of “containing a covered material” changes the underlying intent or application of the rule. Of note, the restriction in 10 U.S.C. 2533c is modeled on the domestic preference in 10 U.S.C. 2533b, with similar exceptions related to commercially available off-the-shelf (COTS) items and electronic components and devices. Based on the similar construction of these statutes, DoD interprets the exception for “electronic devices” pursuant to DFARS 225.7018-3 to include components embedded in other end items. For example, a missile or munition purchased by DoD may contain tantalum units in a capacitor. The same missile or munition may contain tantalum or tungsten units in an explosively-formed penetrator. The tantalum units embedded in the capacitor would be covered by the “electronic devices” exception, but the tantalum or tungsten units in the explosively-formed penetrator would not be covered by the exception. DoD believes that the application of the exception provided in this example aligns with congressional intent, providing an exception for those products with significant commercial market exposure ( e.g., a capacitor) while maintaining coverage for military-unique products ( e.g., an explosively-formed penetrator). DoD further addresses the respondents' feedback on these specific aspects of the rule in the category of comments at paragraph 8c, entitled clarification of the rule.

    b. Prior Melting Production of Tantalum Raw Materials

    Comment: A respondent asked that the interim rule be amended to clarify that the prohibition on procuring any covered material melted or produced in any covered country applies only to the melting or production of tantalum metals and alloys that immediately precedes delivery to the DoD customer or a supplier's higher-tier contractor customer. Two respondents stated that because tantalum may be melted or produced or re-melted or reproduced multiple times in the supply chain life cycle, the only rational reading of 10 U.S.C. 2533c is to conclude that the most recent melting or manufacture of the covered material prior to transfer to DoD or to a higher-tier contractor customer does not occur in a covered country. In addition, another respondent further stated the interim rule did not contain the phrase “and melting” with regard to the prohibition of the production of tantalum metal and alloys, including the reduction of tantalum chemicals such as oxides, chlorides, or potassium salts, to metal powder and all subsequent phases of the production of tantalum metal and alloys, such as consolidation of metal powders and melting. The respondent requested the rationale for the omission of “and melting” in the implementation of section 849 of the NDAA for FY 2020 in the interim rule.

    Response: DoD acknowledges that at the time the interim rule was issued, 10 U.S.C. 2533c was meant to apply to melting or manufacture of the covered material. However, section 844 of the NDAA for FY 2021 (Pub. L. 116-283) passed subsequent to the publication of the interim rule. In section 844, Congress amended 10 U.S.C. 2533c(a)(1) from “. . . procuring any covered material melted or produced in any covered nation. . .” to “. . . procuring any covered material mined, refined, separated, melted or produced in any covered nation. . .”. The current rulemaking effort applies only to the changes mandated by section 849 of the NDAA for FY 2020. Section 844 of the NDAA for FY 2021 has an effective date five years after the date of enactment and will be implemented via future rulemaking under DFARS Case 2021-D015. DoD has deleted the reference to “chemicals such as oxides, chlorides, or potassium salts, to metal powder” and simplified the language to include “reduction or melting of any form”. DoD has also clarified the final forms of tantalum metals as “including unwrought, powder, mill products, and alloys.”

    c. Tantalum Powder/Raw Materials

    Comment: A respondent requested that the draft rule be revised to exclude tantalum powder from the definition of “covered material.” The respondent argued that Congress did not intend to place restrictions on tantalum powder as neither 10 U.S.C. 2533c nor section 849 of the NDAA for FY 2020 mention tantalum powder specifically, but rather refer to “tantalum metals and alloys.”

    Response: DoD concurs that the statute at 10 U.S.C. 2533c on its face does not include tantalum powder as a covered material. The final rule clarifies that tantalum powder is included in the rule to further explain that tantalum powder is also considered a metal and therefore, tantalum powder also would be restricted. In addition, the rule applies the restriction to cover all subsequent phases of production of tantalum metals and alloys. Start Printed Page 52345

    6. Tantalum Capacitors

    Comment: A respondent noted that tantalum is a key component of capacitors used in military and commercial applications, and that the United States is dependent on foreign countries, including China, to acquire tantalum and tantalum capacitors. Therefore, any implementation of supply constraints should be considered judiciously to guarantee the availability of tantalum capacitors for U.S. applications.

    Response: DoD is aware of U.S. dependence on foreign countries to acquire tantalum and tantalum capacitors for military and commercial use. DoD continues to work with allied nations to strengthen this part of the foreign supply chain for strategic and critical materials such as tantalum. Additionally, DoD has mandated programs in place to strengthen the industrial base by funding projects to increase domestic capability to produce products, including strategic and critical materials such as tantalum, for military use.

    7. Statutory Implementation and Interpretation

    Comment: A respondent asked that the final rule be revised to correct an error within the interim rule implemented in DFARS clause 252.225-7052, specifically the omission of the 10 U.S.C. 2533c(c)(3) statutory phrase “containing a covered material.” The respondent proposed two options to correct the interim rule. Another respondent stated that the interim rule unreasonably interprets 10 U.S.C. 2533c and “is likely to have a significant impact on acquisitions by the DoD of end items that include high performance, low weight tantalum capacitors.” In summary, the respondent stated the interim rule disregards language that makes the prohibitions and exceptions created by the statute apply to both prime contracts and subcontracts at any tier.

    Response: As to the respondent's concerns regarding omission of the 10 U.S.C. 2533c(c)(3) statutory phrase “containing a covered material,” as stated in DFARS 225.7018-5, unless an acquisition of certain magnets, tantalum, and tungsten is completed outside the United States for use outside the United States, or an official nonavailability determination has been made, DFARS clause 252.225-7052, Restriction on the Acquisition of Certain Magnets, Tantalum, and Tungsten, shall be included in solicitations and contracts, to include Federal Acquisition Regulation (FAR) part 12 commercial item acquisitions, that exceed the simplified acquisition threshold. DFARS 252.225-7052(b)(1) identifies that the restrictions listed apply to the contractor, who “shall not deliver under this contract any covered material melted or produced in any covered country, or any end item, manufactured in any covered country, that contains a covered material (10 U.S.C. 2533c).” Moreover, DFARS 252.225-7052(d) directs the contractor to insert the substance of the clause, including paragraph (d), in subcontracts and other contractual instruments that are for items containing a covered material, including subcontracts and other contractual instruments for commercial products and commercial services, unless an exception in paragraph (c) of this clause applies. Therefore, DFARS clause 252.225-7052 does apply restrictions and exceptions to both contractors and subcontractors.

    8. Recommended Revisions

    a. One-Time Waiver

    Comment: A respondent recommended a one-time waiver to address material on hand and in process including alloy already processed. The respondent further stated that manufacturers normally procure tantalum one year in advance for forecasted usage and may purchase multiple years of supply at that time that may contain tantalum from covered countries. The respondent further stated that if the Government does not permit manufacturers to use in-process tantalum from covered countries for military products, the costs to the Government will likely rise in order to compensate manufacturers for the noncompliant tantalum procured prior to the implementation of the prohibition.

    Response: The interim rule was published on September 29, 2020, implementing section 849 of the NDAA for FY 2020. Implementation of this prohibition was urgent, because decreasing DoD's dependence on covered materials that originate in covered countries is a matter of national security. Tantalum is an important element in the supply chain for production of both U.S. military systems and nonmilitary systems that DoD uses. A shortage of supply of these covered materials would therefore hinder maintenance and replacement of many DoD military systems and would also have a negative impact on the broader industrial base upon which DoD depends. Section 849 of the NDAA for FY 2020 mandates compliance with this prohibition as implemented in the interim rule published on September 29, 2020, and in effect on October 1, 2020. In addition, FAR and DFARS changes apply to solicitations issued on or after the effective date of the change unless otherwise specified (see FAR 1.108(d)).

    b. Add Compliance Incentive

    Comment: A respondent recommended the addition of a compliance incentive for proposals priced with compliant materials versus noncompliant materials for the purposes of proposal evaluations.

    Response: Section 849 of the NDAA for FY 2020 does not include a compliance incentive requirement for the prohibition; therefore, none is included in the rule.

    c. Clarification of the Rule

    Comment: Several respondents recommended revisions to clarify the interim rule. A respondent commented that the interim rule is costly to implement and requested the interim rule be modified to clarify that end items supplied to DoD containing a covered material that is an electronic device are excepted from the prohibition.

    A respondent also recommended that DoD modify the interim rule at DFARS clause 252.225-7052, paragraph (c)(1) and DFARS 225.7018-3(c). Specifically, the respondent recommended that DoD replace the phrase “an end item that is” with the phrase “a covered material (as an end item or incorporated into an end item) that is.” As an alternative, the respondent further recommended that the phrase “an end item that is” be replaced with language to match the exact statutory text “an end item containing a covered material that is.”

    Additionally, a respondent recommended that DoD clarify that DFARS clause 252.225-7052 applies only to the melting and production of tantalum metal and alloys as part of the DoD supply chain and not to prior melting or production or to tantalum raw materials.

    Another respondent stated that the prohibition in the interim rule applies with regard to a prime contractor and prohibits contractors from incorporating a COTS item or an electronic device from a subcontractor into an end item delivered to DoD, unless that item is a COTS item or an electronic device. Subsequently, the respondent stated as an example, the rule as implemented prohibits a subcontractor from acquiring a tantalum capacitor made in China, and a prime contractor could not incorporate that capacitor into an end item delivered to DoD. The respondent recommended a revision to the interim Start Printed Page 52346 rule at DFARS 225.7018-2 and the clause 252.225-7052, paragraph (a) to clarify that DoD would neither be acquiring a covered material melted or produced in a covered country, nor an end item manufactured in any covered country, that contains a covered material, unless the end item is itself manufactured in a covered country. Another respondent stated that the statute prohibits the Government from procuring “any end item that contains a covered material manufactured in any covered nation, except as provided by the clause 252.225-7052(c).”

    A respondent indicated the language of the statute at 10 U.S.C. 2533c states that an end item cannot contain a covered material manufactured in any covered nation; however, the clause 252.225-7052 prohibits a contractor from delivering any end item, manufactured in any covered country, that contains a covered material (10 U.S.C. 2533c). According to the respondent the clause suggests that a contractor may deliver an end item containing covered material so long as that end item is not manufactured in a covered country, creating an inconsistency with the clause and the statute. The respondent recommended a revision to clarify whether the phrase “manufactured in any covered country” modifies “end item” or “covered material.”

    The respondents further requested that the interim rule be rewritten to comply with the statute such that the term “electronic device” modifies the term “covered material”, not “end item”, to ensure that in the event an end item contains a covered material and the covered material is an electronic device, the end item will not be subject to the general restriction contained in the draft rule.

    Response: DoD acknowledges and concurs with the following recommended revision at DFARS clause 252.225-7052, paragraph (c)(1) and 225.7018-3(c): to remove the phrase “of an end item that is” and replace it with the phrase “of an end item containing a covered material that is.” DoD interprets the exception for “electronic devices” pursuant to DFARS 225.7018-3 to include components embedded in other end items and does not see the need to clarify further that end items supplied to DoD containing a covered material that is an electronic device are excepted from the prohibition in accordance with 10 U.S.C. 2533c(c)(3). As the current rulemaking effort applies only to the changes mandated by section 849 of the NDAA for FY 2020, any additional expansion, on the prohibition to clarify that the clause 252.225-7052 applies only to the melting and production of tantalum metals and alloys as part of the DoD supply chain and not to prior melting or production or to tantalum raw materials, would be out of scope.

    DoD does not concur with the recommendation to revise DFARS 225.7018-2 and the clause 252.225-7052, paragraph (a), to clarify that unless the end item is itself manufactured in a covered country, DoD would be acquiring neither a covered material melted or produced in a covered country nor an end item manufactured in any covered country that contains a covered material, unless the end item is itself manufactured in a covered country. DoD also does not concur with the recommendation for a revision to clarify whether the phrase “manufactured in any covered country” modifies “end item” or “covered material.” The interim rule as implemented at 225.7018-2(a), in accordance with section 849 of the NDAA for FY 2020 and 10 U.S.C. 2533c, specifically mandates not acquiring any covered material melted or produced in any covered country, or any end item, manufactured in any covered country, that contains a covered material.

    d. Extension for Comment Due Date

    Comment: A respondent requested an extension to the comment period for 30 days due to further analysis required and the holiday season.

    Response: DoD acknowledges the extension request; however, the public comment period was not extended.

    9. Outside the Scope of the Rule

    Comment: A respondent inquired what documentation is required to import tantalum into the United States and proof of origin.

    Response: This final rule is implementing restrictions on the acquisition of tantalum in accordance with section 849 of the NDAA for FY 2020. Instructions on documentation for importing tantalum and proof of origin are outside the scope of this rule.

    C. Other Changes

    At DFARS 212.505, Applicability of certain laws to contracts for the acquisition of COTS items, paragraph (b) is added to state that paragraph (a)(1) of 10 U.S.C. 2533c is not applicable to contracts and subcontracts for the acquisition of commercially available off-the-shelf items, except as provided at 225.7018-3(c)(1). The previously undesignated paragraph at 212.505 is designated as paragraph (a).

    III. Applicability to Contracts at or Below the Simplified Acquisition Threshold (SAT) and for Commercial Services and Commercial Products, Including Commercially Available Off-the-Shelf (COTS) Items

    This rule amends the clause at DFARS 252.225-7052, Restriction on Acquisition of Certain Magnets, Tantalum, and Tungsten, to implement section 849 of the NDAA for FY 2020. DFARS 252.225-7052 does not apply to acquisitions at or below the simplified acquisition threshold but applies to contracts for the acquisition of commercial items, except as provided in the statute at 10 U.S.C. 2533c(c)(3). Therefore, DoD has signed a determination of applicability to acquisitions of commercial items, except for COTS items to the extent exempted in the statute.

    IV. Expected Impact of the Rule

    This final rule adds tantalum “metals” to the restriction at DFARS 225.7018 and also incorporates the term into the definition of “covered material.” This rule further explains the applicability of the restriction on the production of tantalum metals of any kind and alloys in addition to the reduction or melting of any form of tantalum metal. Moreover, the restriction includes the subsequent production steps for the reduction or melting of any form of tantalum to create tantalum metals including unwrought, powder, mill products, and alloys.

    In addition, the rule provides an explanation of the exceptions at DFARS 225.7018-3, paragraph (c)(1)(ii) exception for commercially available off-the-shelf (COTS) items, which is not applicable to a mill product that has not been incorporated into an end item, subsystem, assembly, or component and paragraph (d)(1) meaning of nonavailability of a covered material in the required form. Although 10 U.S.C. 2533c provides that the exception to the restriction on tungsten for COTS items does not apply to a COTS item that is 50 percent or more tungsten by weight, section 849 does not add a similar condition with regard to tantalum metal and alloys.

    It is a matter of national security to reduce U.S. dependence on the covered countries in accordance with the section 849 restriction, because tantalum is an important element in the supply chain for production of both U.S. military systems and nonmilitary systems that DoD uses. A shortage of supply of these covered materials would therefore hinder maintenance and replacement of Start Printed Page 52347 many DoD military systems and would also have a negative impact on the broader industrial base upon which DoD depends. Implementation of this prohibition will decrease DoD's dependence on covered materials that originate in covered countries in support of national security.

    V. Executive Orders 12866 and 13563

    Executive Orders (E.O.s) 12866 and 13563 direct agencies to assess all costs and benefits of available regulatory alternatives and, if regulation is necessary, to select regulatory approaches that maximize net benefits (including potential economic, environmental, public health and safety effects, distributive impacts, and equity). E.O. 13563 emphasizes the importance of quantifying both costs and benefits, of reducing costs, of harmonizing rules, and of promoting flexibility. This is not a significant regulatory action and, therefore, was not subject to review under section 6(b) of E.O. 12866, Regulatory Planning and Review, dated September 30, 1993.

    VI. Congressional Review Act

    As required by the Congressional Review Act (5 U.S.C. 801-808) before an interim or final rule takes effect, DoD will submit a copy of the interim or final rule with the form, Submission of Federal Rules under the Congressional Review Act, to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States. A major rule under the Congressional Review Act cannot take effect until 60 days after it is published in the Federal Register . The Office of Information and Regulatory Affairs has determined that this rule is not a major rule as defined by 5 U.S.C. 804.

    VII. Regulatory Flexibility Act

    A final regulatory flexibility analysis (FRFA) has been prepared consistent with the Regulatory Flexibility Act, 5 U.S.C. 601, et seq. The FRFA is summarized as follows:

    This rule is required to implement section 849 of the National Defense Authorization act (NDAA) for Fiscal Year (FY) 2020 (Pub. L. 116-92) (10 U.S.C. 2533c). The objective of the rule is to implement the section 849 prohibition on the acquisition of tantalum metals and alloys from North Korea, China, Russia, or Iran.

    There were no significant issues raised by the public comments in response to the initial regulatory flexibility analysis.

    This rule will apply to an annual average of approximately 697 small entities. Based on data from the Federal Procurement Data System for FY 2019, FY 2020, and FY 2021, DoD awarded in the United States 13,204 contracts that exceeded the simplified acquisition threshold of $250,000 and were for the acquisition of manufactured end products (excluding those categories that could not include tantalum such as clothing and fabrics, books, or lumber products). These contracts were awarded to 3,447 unique entities, of which 2,090 were small entities. It is not known what percentage of these awards involved tantalum, or what lesser percentage might involve tantalum from China, North Korea, Russia, or Iran.

    There are no projected reporting or recordkeeping requirements. However, there may be compliance costs to track the origin of covered materials.

    DoD is exempting acquisitions equal to or less than the simplified acquisition threshold. DoD was unable to identify any other alternatives that would reduce burden on small businesses and still meet the objectives of the statute.

    VIII. Paperwork Reduction Act

    This rule does not contain any information collection requirements that require the approval of the Office of Management and Budget under the Paperwork Reduction Act (44 U.S.C. chapter 35).

    Start List of Subjects

    List of Subjects in 48 CFR Parts 212, 225, and 252

    • Government procurement
    End List of Subjects Start Signature

    Jennifer D. Johnson,

    Editor/Publisher, Defense Acquisition Regulations System.

    End Signature

    Accordingly, the interim rule amending 48 CFR parts 212, 225, and 252, which was published in the Federal Register at 85 FR 61500 on September 29, 2020, is adopted as a final rule with the following changes:

    Start Amendment Part

    1. The authority citation for 48 CFR parts 212, 225, and 252 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 41 U.S.C. 1303 and 48 CFR chapter 1.

    End Authority Start Part

    PART 212—ACQUISITION OF COMMERCIAL ITEMS

    End Part Start Amendment Part

    2. Amend section 212.301 by revising paragraph (f)(x)(FF) to read as follows:

    End Amendment Part
    Solicitation provisions and contract clauses for the acquisition of commercial items.

    (f) * * *

    (x) * * *

    (FF) Use the clause at 252.225-7052, Restriction on the Acquisition of Certain Magnets, Tantalum, and Tungsten, as prescribed in 225.7018-5, to comply with 10 U.S.C. 2533c.

    * * * * *
    Start Amendment Part

    3. Amend section 212.505 by—

    End Amendment Part Start Amendment Part

    a. Designating the section text as paragraph (a); and

    End Amendment Part Start Amendment Part

    b. Adding paragraph (b).

    End Amendment Part

    The addition reads as follows:

    Applicability of certain laws to contracts for the acquisition of COTS items.
    * * * * *

    (b) Paragraph (a)(1) of 10 U.S.C. 2533c, Prohibition on acquisition of sensitive materials from non-allied foreign nations, is not applicable to contracts and subcontracts for the acquisition of commercially available off-the-shelf items, except as provided at 225.7018-3(c)(1).

    Start Part

    PART 225—FOREIGN ACQUISITION

    End Part
    [Amended]
    Start Amendment Part

    4. Amend section 225.7018-1 in paragraph (3) of the definition of “Covered material” by removing “metal” and adding “metals” in its place.

    End Amendment Part Start Amendment Part

    5. Amend section 225.7018-2 by revising paragraph (c) to read as follows:

    End Amendment Part
    Restriction.
    * * * * *

    (c) For production of tantalum metals of any kind and alloys, this restriction includes the reduction or melting of any form of tantalum to create tantalum metal including unwrought, powder, mill products, and alloys. The restriction also covers all subsequent phases of production of tantalum metals and alloys.

    * * * * *
    [Amended]
    Start Amendment Part

    6. Amend section 225.7018-3—

    End Amendment Part Start Amendment Part

    a. In the paragraph (c) introductory text, by removing “Of an end item” and adding “Of an end item containing a covered material” in its place; and

    End Amendment Part Start Amendment Part

    b. In the paragraph (c)(1) introductory text, by removing “PGI 225.7018-3(c)(1)(i)” and adding “PGI 225.7018-3(c)(1)” in its place.

    End Amendment Part Start Part

    PART 252—SOLICITATION PROVISIONS AND CONTRACT CLAUSES

    End Part Start Amendment Part

    7. Amend section 252.225-7052 by—

    End Amendment Part Start Amendment Part

    a. Adding introductory text;

    End Amendment Part Start Amendment Part

    b. Revising the clause date;

    End Amendment Part Start Amendment Part

    c. In paragraph (a), in paragraph (3) of the definition of “Covered material”, removing “metal” and adding “metals” in its place;

    End Amendment Part Start Amendment Part

    d. Revising paragraph (b)(3); and

    End Amendment Part Start Amendment Part

    e. In the paragraph (c)(1) introductory text, removing “To an end item” and Start Printed Page 52348 adding “To an end item containing a covered material” in its place.

    End Amendment Part

    The addition and revisions read as follows:

    Restriction on the Acquisition of Certain Magnets, Tantalum, and Tungsten.

    As prescribed in 225.7018-5, use the following clause:

    Restriction on the Acquisition of Certain Magnets, Tantalum, and Tungsten (Aug 2022)

    * * * * *

    (b) * * *

    (3) For production of tantalum metals of any kind and alloys, this restriction includes the reduction or melting of any form of tantalum to create tantalum metal including unwrought, powder, mill products, and alloys. The restriction also covers all subsequent phases of production of tantalum metals and alloys.

    * * * * *
    End Supplemental Information

    [FR Doc. 2022-18224 Filed 8-24-22; 8:45 am]

    BILLING CODE 5001-06-P

Document Information

Effective Date:
8/25/2022
Published:
08/25/2022
Department:
Defense Acquisition Regulations System
Entry Type:
Rule
Action:
Final rule.
Document Number:
2022-18224
Dates:
Effective August 25, 2022.
Pages:
52342-52348 (7 pages)
Docket Numbers:
Docket DARS-2020-0035
RINs:
0750-AK94: Restriction on Acquisition of Tantalum (DFARS Case 2020-D007)
RIN Links:
https://www.federalregister.gov/regulations/0750-AK94/restriction-on-acquisition-of-tantalum-dfars-case-2020-d007-
Topics:
Government procurement
PDF File:
2022-18224.pdf
Supporting Documents:
» Defense Federal Acquisition Regulation Supplement: Restriction on Acquisition of Tantalum
» Defense Federal Acquisition Regulation Supplement: Restriction on the Acquisition of Tantalum
CFR: (6)
48 CFR 212.301
48 CFR 212.505
48 CFR 225.7018-1
48 CFR 225.7018-2
48 CFR 225.7018-3
More ...