94-21149. Environmental Impact Statements and Regulations; Availability of EPA Comments  

  • [Federal Register Volume 59, Number 165 (Friday, August 26, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-21149]
    
    
    [[Page Unknown]]
    
    [Federal Register: August 26, 1994]
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    [ER-FRL-4714-4]
    
     
    
    Environmental Impact Statements and Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared August 8, 1994 through August 
    12, 1994 pursuant to the Environmental Review Process (ERP), under 
    section 309 of the Clean Air Act and section 102(2)(c) of the National 
    Environmental Policy Act as amended. Requests for copies of EPA 
    comments can be directed to the Office of Federal Activities at (202) 
    260-5076.
        An explanation of the ratings assigned to draft environmental 
    impact statements (EISs) was published in the Federal Register  dated 
    April 8, 1994 (59 FR 16807).
    
    Draft EISs
    
        ERP No. D-COE-G32053-LA Rating LO, Port Fourchon Navigation 
    Channel Project, Channel Deepening, Implementation, Lafourche 
    Parish, LA.
        Summary: EPA had no objections to the proposed project.
        ERP No. D-USA-L11022-WA Rating EC2, Fort Lewis Military 
    Installation Comprehensive Solid Waste Management Program, 
    Implementation, City of DuPont, Pierce and Thurston Counties, WA.
        Summary: EPA expressed environmental concerns based on potential 
    air and water quality impacts. Additional information and 
    clarification is needed to: identify the extent of air quality 
    impacts and their conformity to SIP requirements for the area; 
    clarify the technical aspects regarding a variance request for 
    operation of a landfill in a sole source aquifer; and describe the 
    impacts of potentially characteristic fly ash on solid and hazardous 
    waste management.
    
    Final EISs
    
        ERP No. F-FHW-K40203-CA, Adoption--Calexico East Border Station 
    Construction and Road Construction, CA-7 between the New Port of 
    Entry and CA-98 that borders the United States and Mexico, Funding 
    and Right-of-way Permit, City of Calexico, Imperial County, CA.
    
        Summary: EPA had environmental concerns and requests that the 
    FHWA Record of Decision recognize two major issues regarding the GSA 
    FEIS which FHWA intends to adopt: (1) the U.S. Congress has not 
    appropriated funding for a wastewater treatment facility at the New 
    River in Calexico and (2) that any future proposal to reverse or dam 
    the Alamo River to prevent transboundary sewage flows into the U.S. 
    would be a major Federal action requiring the preparation of an EIS 
    or EIS supplement.
    
        Dated: August 23, 1994.
    William D. Dickerson,
    Deputy Director, Office of Federal Activities.
    [FR Doc. 94-21149 Filed 8-25-94; 8:45 am]
    BILLING CODE: 6560-50-P
    
    
    

Document Information

Published:
08/26/1994
Department:
Environmental Protection Agency
Entry Type:
Uncategorized Document
Document Number:
94-21149
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: August 26, 1994, ER-FRL-4714-4