Take notice the following hydroelectric application has been filed
with the Commission and is available for public inspection:
a. Type of Application: Minor License.
b. Project No.: P-11730-000.
c. Date Filed: April 21, 1999.
d. Applicant: Black River Limited Partnership.
e. Name of Project: Alverno Hydroelectric Project.
f. Location: On the Black River in the Townships of Aloha, Benton,
and Grant, in Cheboygan County, Michigan.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Frank O. Christie, President, Franklin Hydro,
Inc., 8 East Main Street, Malone, New York 12953, (518) 483-1961.
i. FERC Contact: Any questions on this notice should be addressed
to John Costello, E-mail address john.costello@ferc.fed.us or telephone
at (202) 219-2914.
j. Deadline for filing motions to intervene and protest: 60 days
from the issuance date of this notice.
All documents (original and eight copies) should be filed with:
David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official serve
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on the resource agency.
k. Status of Environmental Analysis: This application is not ready
for environmental analysis at this time.
l. Description of Project: The constructed project consists of a
360-foot-long earth filled dam with a power plant located on the right
riverbank and a gated spillway near the left bank. The project
impoundment extends approximately 2.5 miles upstream. The powerhouse
contains 2 horizontal turbine-generator sets.
m. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference and Files and Maintenance Branch, located at 888 First
Street, NE., Room 2A-1, Washington, DC 20426, or by calling (202) 208-
2326. A copy is also available for inspection and reproduction at the
Cheboygan Public Library, 107 South Ball Street, Cheboygan, Michigan.
Protests or Motions to Intervene--Anyone may submit a protest or a
motion to intervene in accordance with the requirements of Rules of
Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In
determining the appropriate action to take, the Commission will
consider all protests filed, but only those who file a motion to
intervene in accordance with the Commission's Rules may become a party
to the proceeding. Any protests or motions to intervene must be
received on or before the specified deadline date for the particular
application.
Filing and Service of Responsive Documents--The application is not
ready for environmental analysis at this time; therefore, the
Commission is not now requesting comments, recommendations, terms and
conditions, or prescriptions.
When the application is ready for environmental analysis, the
Commission will issue a public notice requesting comments,
recommendations, terms and conditions, or prescriptions.
All filings must (1) bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE''; (2) set forth in the heading
the name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the application directly from the
applicant. Any of these documents must be filed by providing the
original and the number of copies required by the Commission's
regulations to: The Secretary, Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC 20426. An additional copy must be
sent to Director, Division of Project Review, Office of Hydropower
Licensing, Federal Energy Regulatory Commission, at the above address.
A copy of any protest or motion to intervene must be served upon each
[[Page 46672]]
representative of the applicant specified in the particular
application.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 99-22135 Filed 8-25-99; 8:45 am]
BILLING CODE 6717-01-M