    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    
    
    Notice of Application Ready for Environmental Analysis and 
    Soliciting Comments, Recommendations, Terms and Conditions, and 
    Prescriptions
    
    August 20, 1999.
        Take notice that the following hydroelectric application has been 
    filed with the Commission and is available for public inspection:
        a. Type of Application: New Major License.
        b. Project No.: 2019-017.
        c. Date filed: May 3, 1994.
        d. Applicant: Utica Power Authority.
        e. Name of Project: Utica Project.
        f. Location: On Mill and Angels Creeks in Calaveras, California. 
    The project is partially on lands of the Stanislaus National Forest.
        g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
        h. Applicant Contact: Mr. Dennis Dickman, Utica Power Authority, 
    P.O. Box 430, San Andreas, CA 95249, (209) 754-4230.
        i. FERC Contact: Hector Perez, hector.perez@ferc.fed.us, (202) 219-
    2843.
        j. Deadline for filing comments, recommendations, terms and 
    conditions, and prescriptions: 60 days from the issuance date of this 
    notice.
        All documents (original and eight copies) should be filed with: 
    David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888 
    First Street, NE, Washington, DC 20426.
        The Commission's Rules of Practice and Procedure require all 
    intervenors filing documents with the Commission to serve a copy of 
    that document on each person on the official service list for the 
    project. Further, if an intervenor files comments or documents with the 
    Commission relating to the merits of an issue that may affect the 
    responsibilities of a particular resource agency, they must also serve 
    a copy of the document on that resource agency.
        k. This application has been accepted for filing and is now ready 
    for environmental analysis.
        l. The existing project consists of: (1) The Mill Creek Tap which 
    delivers water from the Collierville Tunnel (part of Project No. 2409, 
    licensed to CCWD) to the Upper Utica Conduit; (2) the 0.7-mile-long 
    Upper Utica Conduit (an open channel); (3) the 58.5-foot-high and 389-
    foot-long concrete arch and gravity Hunters dam; (4) Hunters Reservoir 
    with a surface area of 19 acres and a gross storage capacity of 253 
    acre-feet; (5) the 13.41 mile-long Lower Utica Conduit (a metal-line 
    wooden box flume and natural earth, and gunite canal sections); (6) the 
    2.8-acre surface area and 56.9-acre-foot gross storage capacity Murphys 
    Forebay impounded by a 27-foot-high, 415-foot-long earthfill South dam 
    and a 67-foot-high, 316-foot-long earthfill West dam; (7) the 24-inch 
    to 48-inch and 4,048-foot-long shop welded steel Murphys Penstock; (8) 
    the 33-foot-wide by 36-foot-long concrete Murphys Powerhouse, housing a 
    semi-enclosed vertical impulse turbine-generator unit with an installed 
    capacity of 4 MW; (9) Murphys Afterbay, with a surface area of 2.7 
    acres and a gross storage capacity of 31.3 acre-feet impounded by a 42-
    foot-high, 340-foot-long earthfill dam topped by a concrete parapet 
    wall; (10) an access road network used to provide maintenance to the 
    conduits; and (11) other appurtenances. The average annual generation 
    of the project is 27 GWH.
        m. A copy of the application is available for inspection and 
    reproduction at the Commission's Public Reference Room, located at 888 
    First Street, NE, Room 2A, Washington, D.C. 20426, or by calling (202) 
    208-1371. The application may be viewed on http://www.ferc.fed.us/rims/
    htm (call (202) 208-2222 for assistance). A copy is also available for 
    inspection and reproduction at the address in item h above.
        Filing and Service of Responsive Documents--The application is 
    ready for environmental analysis at this time, and the Commission is 
    requesting comments, reply comments, recommendations, terms and 
    conditions, and prescriptions.
        The Commission directs, pursuant to Sec. 4.34(b) of the Regulations 
    (see Order No. 533 issued May 8, 1991, 56 FR 23108, May 20, 1991) that 
    all comments, recommendations, terms and conditions and prescriptions 
    concerning the application be filed with the Commission within 60 days 
    from the issuance date of this notice. All reply comments must be filed 
    with the Commission within 105 days from the date of this notice.
        Anyone may obtain an extension of time for these deadlines from the 
    Commission only upon a showing of good cause or extraordinary 
    circumstances in accordance with 18 CFR 385.2008.
        All filings must: (1) Bear in all capital letters the title 
    ``COMMENTS,'' ``REPLY COMMENTS'' ``RECOMMENDATIONS,'' ``TERMS AND 
    CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the 
    name of the applicant and the project number of the application to 
    which the filing responds; (3) furnish the name, address, and telephone 
    number of the person submitting the filing; and (4) otherwise comply 
    with the requirements of 18 CFR 385.2001 through 385.2005. All 
    comments, recommendations, terms and conditions or prescriptions must 
    set forth their evidentiary basis and otherwise comply with the 
    requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
    application directly from the applicant. Any of these documents must be 
    filed by providing the original and the number of copies required by 
    the Commission's regulations to: The Secretary, Federal Energy 
    Regulatory Commission, 888 First Street, NE, Washington, DC 20426. An 
    additional copy must be sent to Director, Division of Project Review, 
    Office of Hydropower Licensing, Federal Energy Regulatory Commission, 
    at the above address. Each filing must be accompanied by proof of 
    service on all persons listed on the service list prepared by the 
    Commission in this proceeding, in accordance with 18 CFR 4.34(b), and 
    385.2010.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 99-22146 Filed 8-25-99; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
08/26/1999
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
99-22146
Pages:
46672-46672 (1 pages)
PDF File:
99-22146.pdf