DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Ready for Environmental Analysis and
Soliciting Comments, Recommendations, Terms and Conditions, and
Prescriptions
August 20, 1999.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: New Major License.
b. Project No.: 2019-017.
c. Date filed: May 3, 1994.
d. Applicant: Utica Power Authority.
e. Name of Project: Utica Project.
f. Location: On Mill and Angels Creeks in Calaveras, California.
The project is partially on lands of the Stanislaus National Forest.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Dennis Dickman, Utica Power Authority,
P.O. Box 430, San Andreas, CA 95249, (209) 754-4230.
i. FERC Contact: Hector Perez, hector.perez@ferc.fed.us, (202) 219-
2843.
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions: 60 days from the issuance date of this
notice.
All documents (original and eight copies) should be filed with:
David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE, Washington, DC 20426.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. This application has been accepted for filing and is now ready
for environmental analysis.
l. The existing project consists of: (1) The Mill Creek Tap which
delivers water from the Collierville Tunnel (part of Project No. 2409,
licensed to CCWD) to the Upper Utica Conduit; (2) the 0.7-mile-long
Upper Utica Conduit (an open channel); (3) the 58.5-foot-high and 389-
foot-long concrete arch and gravity Hunters dam; (4) Hunters Reservoir
with a surface area of 19 acres and a gross storage capacity of 253
acre-feet; (5) the 13.41 mile-long Lower Utica Conduit (a metal-line
wooden box flume and natural earth, and gunite canal sections); (6) the
2.8-acre surface area and 56.9-acre-foot gross storage capacity Murphys
Forebay impounded by a 27-foot-high, 415-foot-long earthfill South dam
and a 67-foot-high, 316-foot-long earthfill West dam; (7) the 24-inch
to 48-inch and 4,048-foot-long shop welded steel Murphys Penstock; (8)
the 33-foot-wide by 36-foot-long concrete Murphys Powerhouse, housing a
semi-enclosed vertical impulse turbine-generator unit with an installed
capacity of 4 MW; (9) Murphys Afterbay, with a surface area of 2.7
acres and a gross storage capacity of 31.3 acre-feet impounded by a 42-
foot-high, 340-foot-long earthfill dam topped by a concrete parapet
wall; (10) an access road network used to provide maintenance to the
conduits; and (11) other appurtenances. The average annual generation
of the project is 27 GWH.
m. A copy of the application is available for inspection and
reproduction at the Commission's Public Reference Room, located at 888
First Street, NE, Room 2A, Washington, D.C. 20426, or by calling (202)
208-1371. The application may be viewed on http://www.ferc.fed.us/rims/
htm (call (202) 208-2222 for assistance). A copy is also available for
inspection and reproduction at the address in item h above.
Filing and Service of Responsive Documents--The application is
ready for environmental analysis at this time, and the Commission is
requesting comments, reply comments, recommendations, terms and
conditions, and prescriptions.
The Commission directs, pursuant to Sec. 4.34(b) of the Regulations
(see Order No. 533 issued May 8, 1991, 56 FR 23108, May 20, 1991) that
all comments, recommendations, terms and conditions and prescriptions
concerning the application be filed with the Commission within 60 days
from the issuance date of this notice. All reply comments must be filed
with the Commission within 105 days from the date of this notice.
Anyone may obtain an extension of time for these deadlines from the
Commission only upon a showing of good cause or extraordinary
circumstances in accordance with 18 CFR 385.2008.
All filings must: (1) Bear in all capital letters the title
``COMMENTS,'' ``REPLY COMMENTS'' ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Any of these documents must be
filed by providing the original and the number of copies required by
the Commission's regulations to: The Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE, Washington, DC 20426. An
additional copy must be sent to Director, Division of Project Review,
Office of Hydropower Licensing, Federal Energy Regulatory Commission,
at the above address. Each filing must be accompanied by proof of
service on all persons listed on the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b), and
385.2010.
Linwood A. Watson, Jr.,
Acting Secretary.