DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Ready for Environmental Analysis and
Soliciting Comments, Recommendations, Terms and Conditions, and
Prescriptions
August 20, 1999.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Subsequent License.
b. Project No.: 2699-001.
c. Date filed: December 21, 1993.
d. Applicant: Utica Power Authority.
e. Name of Project: Angels Project.
f. Location: On Angels Creek in Calaveras County California. The
project does not utilize lands of the United States.
[[Page 46673]]
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Dennis Dickman, Utica Power Authority,
P.O. Box 430, San Andreas, CA 95249, (209) 754-4230.
i. FERC Contact: Hector Perez, hector.perez@ferc.fed.us, (202) 219-
2843.
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions: 60 days from the issuance date of this
notice.
All documents (original and eight copies) should be filed with:
David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE, Washington, DC 20426.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. This application has been accepted for filing and is now ready
for environmental analysis.
l. The existing project consists of: (1) the 5.6-foot-high, 64-
foot-long, gunite faced, rock-wall and concrete buttress Angels
Diversion dam; (2) the Upper Angels Canal, about 2.5 miles long, to
Ross Reservoir; (3) the 100-acre gross storage capacity Ross Reservoir
and a 44-foot-high and 710-foot-long earthfill, masonry, and rock
structure dam; (4) the Lower Angels Canal, about 3.3 miles long; (5)
the Angels Forebay with a gross storage capacity of 2 acre-feet; (6)
the 8,624-foot-long Angels Penstock; (7) a powerhouse with an installed
capacity of 1,400 kW; and (8) other appurtenances. The average annual
generation of the project is 7 GWh.
m. A copy of the application is available for inspection and
reproduction at the Commission's Public Reference Room, located at 888
First Street, NE, Room 2A, Washington, D.C. 20426, or by calling (202)
208-1371. The applicant may be viewed on http://www.ferc.fed.us/
rims.htm (call (202) 208-2222 for assistance). A copy is also available
for inspection and reproduction at the address in item h above.
Filing and Service of Responsive Documents--The application is
ready for environmental analysis at this time, and the Commission is
requesting comments, reply comments, recommendations, terms and
conditions, and prescriptions.
The Commission directs, pursuant to Section 4.34(b) of the
Regulations (see Order No. 533 issued May 8, 1991, 56 FR 23108, May 20,
1991) that all comments, recommendations, terms and conditions and
prescriptions concerning the application be filed with the Commission
within 60 days from the issuance date of this notice. All reply
comments must be filed with the Commission within 105 days from the
date of this notice.
Anyone may obtain an extension of time for these deadlines from the
Commission only upon a showing of good cause or extraordinary
circumstances in accordance with 18 CFR 385.2008.
All filings must (1) bear in all capital letters the title
``COMMENTS'', ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Any of these documents must be
filed by providing the original and the number of copies required by
the Commission's regulations to: The Secretary, Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426.
An additional copy must be sent to Director, Division of Project
Review, Office of Hydropower Licensing, Federal Energy Regulatory
Commission, at the above address. Each filing must be accompanied by
proof of service on all persons listed on the service list prepared by
the Commission in this proceeding, in accordance with 18 CFR 4.34(b),
and 385.2010.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 99-22147 Filed 8-25-99; 8:45 am]
BILLING CODE 6717-01-M