E8-19691. Public Utility District No. 1 of Chelan County; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests  

  • Start Preamble August 19, 2008.

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:

    a. Application Type: Amendment of license to replace turbine generator units.

    b. Project No: 637-051.

    c. Date Filed: July 7, 2008.

    d. Applicant: Public Utility District No. 1 of Chelan County.

    e. Name of Project: Lake Chelan Hydroelectric Project.

    f. Location: The project is located on the Chelan River, near the City of Chelan, in Chelan County, Washington. The project occupies federal lands administered by the U.S. Forest Service and U.S. Department of the Interior, National Park Service.

    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.

    h. Applicant Contact: Michelle Smith, Licensing and Compliance Manager, Public Utility District No. 1 of Chelan County, 327 North Wenatchee Avenue, P.O. Box 1231, Wenatchee, WA 98807; telephone (509) 661-4180.

    i. FERC Contact: Linda Stewart, telephone (202) 502-6680, and e-mail address linda.stewart@ferc.gov.

    j. Deadline for filing comments, motions to intervene, and protest: September 19, 2008.

    All documents (original and eight copies) should be filed with: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Please include the project number (P-637-051) on any comments or motions filed.

    Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper, see 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the “e-filing” link. The Commission strongly encourages electronic filings.

    The Commission's Rules of Practice and Procedure require all interveners filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application.

    k. Description of Request: Public Utility District No. 1 of Chelan County proposes to replace two existing 24-MW turbine generator units with two new 29.6-MW turbine generator units, thereby increasing the total installed generating capacity at the Lake Chelan Project from 48 MW to 59.2 MW. The total hydraulic capacity of the project would increase from 2,308 cubic feet per second to 2,500 cubic feet per second.

    l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502-8371. This filing may also be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, call 1-866-208-3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is also available for inspection and reproduction at the address in item (h) above.

    m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.

    n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

    o. Any filings must bear in all capital letters the title “COMMENTS”, “PROTEST”, or “MOTION TO INTERVENE”, as applicable, and the Project Number of the particular application to which the filing refers.

    p. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representatives.

    q. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web Start Printed Page 50319site at http://www.ferc.gov under the “e-Filing” link.

    Start Signature

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. E8-19691 Filed 8-25-08; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Comments Received:
0 Comments
Published:
08/26/2008
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
E8-19691
Pages:
50318-50319 (2 pages)
Docket Numbers:
Project No. 637-051
EOCitation:
of 2008-08-19
PDF File:
e8-19691.pdf