98-23115. Koch Gateway Pipeline Company; Notice of Application to Abandon  

  • [Federal Register Volume 63, Number 167 (Friday, August 28, 1998)]
    [Notices]
    [Page 46010]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-23115]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP98-734-000]
    
    
    Koch Gateway Pipeline Company; Notice of Application to Abandon
    
    August 24, 1998.
        Take notice that on August 21, 1998, Koch Gateway Pipeline Company 
    (Koch), P.O. Box 1478, Houston, Texas 77251-1478, filed under Section 
    7(b) of the Natural Gas Act, for authority to abandon, a certificated 
    interruptible transportation service for St. John The Baptist Parish in 
    Louisiana (St. John). The service is Koch's Rate Schedule X-152 in its 
    FERC Gas Tariff, Original Volume No. 2. Koch states that the 
    transportation service has been inactive since March 1994 and that St. 
    John concurs with the request to abandon. Koch's proposal is more fully 
    set forth in the application which is on file with the Commission and 
    open to public inspection.
        Any person desiring to be heard or make any protest with reference 
    to said application should on or before September 14, 1998, file with 
    the Federal Energy Regulatory Commission, 888 First Street, N.E., 
    Washington D.C. 20426, a motion to intervene or a protest in accordance 
    with the requirements of the Commission's Rules of Practice and 
    Procedure (18 CFR 385.214 or 385.211) and the regulations under the 
    Natural Gas Act (18 CFR 157.10). All protests filed with the Commission 
    will be considered by it in determining the appropriate action to be 
    taken but will not serve to make the protestants parties to the 
    proceeding. Any person wishing to become a party to a proceeding or to 
    participate as a party in any hearing therein must file a motion to 
    intervene in accordance with the Commission's Rules.
        Take further notice that, pursuant to the authority contained in 
    and subject to the jurisdiction conferred upon the Federal Energy 
    Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and 
    the Commission's Rules of Practice and Procedure, a hearing will be 
    held without further notice before the Commission or its designee on 
    this application if no motion to intervene is filed within the time 
    required, or if the Commission on its own review of the matter finds 
    that permission and approval of the proposed abandonment are required 
    by the public convenience and necessity. If a motion for leave to 
    intervene is timely filed, or if the Commission on its own motion 
    believes that a formal hearing is required, further notice of such 
    hearing will be duly given.
        Under the procedure herein provided for, unless otherwise advised, 
    it will be unnecessary for Koch to appear or be represented at the 
    hearing.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 98-23115 Filed 8-27-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
08/28/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-23115
Pages:
46010-46010 (1 pages)
Docket Numbers:
Docket No. CP98-734-000
PDF File:
98-23115.pdf