[Federal Register Volume 59, Number 166 (Monday, August 29, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-21202]
[[Page Unknown]]
[Federal Register: August 29, 1994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. GT94-62-000]
Texas Eastern Transmission Corp.; Notice of Proposed Changes in
FERC Gas Tariff
August 23, 1994.
Take notice that on August 18, 1994, Texas Eastern Transmission
Corporation (Texas Eastern) submitted for filing as part of its FERC
Gas Tariff, Sixth Revised Volume No. 1, the tariff sheets listed on
Appendix A of the filing.
Texas Eastern states that National Fuel Gas Supply Corporation
(National Fuel) is a customer of Texas Eastern and an interstate
pipeline subject to the Commission's regulations promulgated under
Order No. 636. Upon the effective date of National Fuel's restructuring
proceeding in Docket No. RS92-21-000, Texas Eastern states that
National Fuel offered its firm transportation capacity on Texas Eastern
to National Fuel's customers, so that such customers could become
direct customers of Texas Eastern. Texas Eastern states that on July 6,
1993, National Fuel provided Texas Eastern with a resulting allocation
which reflected The Providence Natural Gas Company (Providence) as a
National Fuel customer taking assignment of a portion of National
Fuel's Texas Eastern firm capacity. Subsequently, Texas Eastern was
informed that Providence, in connection with National Fuel's
restructuring proceeding, did not desire to take assignment of any of
National Fuel's Texas Eastern capacity. In addition, Texas Eastern
states that National Fuel informed Texas Eastern that another National
Fuel customer, Bristol and Warren Gas Company (Bristol and Warren),
desired to take permanent assignment of such capacity, effective
February 1, 1994.
As a result, Texas Eastern states that it is submitting the tariff
sheets on Appendix A to the filing, to be effective on the dates set
forth thereon for the purpose of reflecting the modifications to
Sections 9.2, 9.3, 9.4, 9.5, 9.9 and 14.4 of the General Terms and
Conditions of its FERC Gas Tariff, Sixth Revised Volume No. 1,
necessary to correct the capacity allocation to Providence and to
reflect the permanent assignment of Base and Operational Segment
Capacity Entitlements from National Fuel under Texas Eastern's Rate
Schedule FT-1 to Bristol and Warren under Texas Eastern's Rate Schedule
SCT, effective February 1, 1994. Specifically, the tariff sheets
submitted on Appendix A to be effective on August 1, 1993, September 1,
1993, October 1, 1993, and November 1, 1993, correct the capacity
allocation to Providence. The tariff sheets listed on Appendix A, to be
effective February 1, 1994, reflect the permanent assignment from
National Fuel to Bristol and Warren.
In addition to the changes discussed above, Texas Eastern states
that it is submitting Sub. Third Revised Sheet No. 568 and Fifth
Revised Sheet No. 568, to be effective October 1, 1993, and November 1,
1993, respectively, to reflect a modification to Section 9.9 of the
General Terms and Conditions of its FERC Gas Tariff, Sixth Revised
Volume No. 1, necessary to correct a typographical error in the
``Clinton Line'' Column for The East Ohio Gas Company. The appropriate
number should be 50,851, not 50,581. However, the TOTAL for such column
should not change.
In addition to the changes discussed above, Texas Eastern states
that it is submitting Sub. Fifth Revised Sheet Nos. 576, 579 and 582,
to be effective November 1, 1993, to reflect a modification to Section
9.9 of the General Terms and Conditions of its FERC Gas Tariff, Sixth
Revised Volume No. 1, necessary to correct the inadvertent inclusion of
the City of Hamilton, Ohio on such sheets as originally filed in Docket
No. GT94-21-000. The City of Hamilton, Ohio should have been deleted
from these sheets because its firm, Rate Schedule FT-1 Service
Agreement with Texas Eastern terminated by its own terms on October 31,
1993.
Further, Texas Eastern states that Philadelphia Electric Company
has notified it that it has changed its name to PECO Energy Company.
Texas Eastern states that it has reflected this change on the set of
tariff sheets to be effective February 1, 1994.
Texas Eastern states that upon receipt of all executed service
agreements from the customers, Texas Eastern will file with the
Commission such executed service agreements and update the Index of
Firm Customers contained in its FERC Gas Tariff, Sixth Revised Volume
No. 1.
Texas Eastern states that copies of the filing were served on firm
customers of Texas Eastern and interested state commissions.
Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, NE., Washington, DC
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure. All such motions or protests should be filed
on or before August 30, 1994. Protests will be considered by the
Commission in determining the appropriate action to be taken, but will
not serve to make protestants parties to the proceeding. Any person
wishing to become a party must file a motion to intervene. Copies of
this filing are on file with the Commission and are available for
public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 94-21202 Filed 8-26-94; 8:45 am]
BILLING CODE 6717-01-M