    Thunder Bay Power Co.; Notice of Intention to Hold Project Site 
    Visit
    
    August 23, 1995.
        Thunder Bay Power Company (applicant) filed on December 30, 1991, a 
    new license application to continue to operate and maintain its Thunder 
    Bay and Hillman Hydro Projects located on the Thunder Bay River in 
    Alpena, Alcona, and Montmorency Counties, Michigan. The applicant has 
    requested that the Commission combine the two licensed projects into a 
    new license.
        The Thunder Bay and Hillman Hydro Project as presently licensed 
    consists of the following:
    
    A. Thunder Bay Hydro Project FERC No. 2404
    
        This project consists of the following five developments:
        The Ninth Street Development which includes: (1) An existing 
    retaining wall, 6 feet high by 285 feet long; (2) an existing 
    buttressed retaining wall, 145 feet long; (3) an existing abandoned 
    fishway; (4) an existing concrete uncontrolled spillway section, 47 
    feet long; (5) an existing gated spillway section, 131 feet long, 
    containing seven tainter gates, each 14 feet long by 12 feet high; (6) 
    an existing concrete gravity non-overflow section, 47 feet long; (7) an 
    existing reinforced concrete non-overflow section (a retaining wall 
    about 20 feet long); (8) an existing reservoir with a surface area of 
    700 acres and a total storage volume of 6,000 acre-feet at the normal 
    maximum surface elevation of 598.5 feet NGVD; (9) an existing 
    reinforced concrete and masonry powerhouse, 92 feet long by 84 feet 
    wide, containing (a) three horizontal shaft Sampson runner turbines 
    with a combined hydraulic capacity of 1620 cfs, manufactured by James 
    Leffel Company and rated at 600 hp each, and (b) three General Electric 
    generators, each rated at 400 kW, providing a total plant rating of 
    1,200 kW; and (10) existing appurtenant facilities.
    
    [[Page 44865]]
    
        The Four Mile Development which includes: (1) An existing concrete 
    ogee spillway (constructed immediately downstream from the original 
    rock filled timber dam), 445 feet long, topped by needle beams, 
    containing (a) a log chute bay, and (b) an abandoned fishway bay; (2) 
    an existing reservoir with a surface area of 90 acres and a total 
    storage capacity of 900 acre-feet at the normal maximum surface 
    elevation of 634.9 feet NGVD; (3) an existing concrete and masonry 
    powerhouse, 72 feet by 72 feet, containing (a) a concrete forebay, (b) 
    three existing horizontal shaft Sampson runner turbines with a combined 
    hydraulic capacity of 1790 cfs, rated at 850 hp each, and (c) three 
    existing General Electric generators, each rated at 600 kW, providing a 
    total existing plant rating of 1,800 kW; and (4) existing appurtenant 
    facilities.
        Norway Point Development which includes: (1) Two existing earth 
    dikes, 1,460 feet long and 500 feet long yielding a total length of 
    1,960 feet; (2) an existing abandoned fishway; (3) an existing beartrap 
    gate section, 120 feet long, containing three beartrap gates, each 26 
    feet long by 27 feet high; (4) an existing mass concrete multiple 
    barrel arch spillway section with removable needle beams, 320 feet 
    long; (5) an existing reservoir with a surface area of 1,700 acres and 
    a total storage volume of 27,550 acre-feet at the normal maximum 
    surface elevation of 671.6 feet NGVD; (6) an existing reinforced 
    concrete and masonry powerhouse, 86 feet long by 49 feet wide, 
    containing (a) two vertical shaft Francis turbines with a combined 
    hydraulic capacity of 1650 cfs, the first manufactured by Wellman-
    Seaver-Morgan Company and rated at 3,350 hp and the second rated at 
    1,400 hp, and (b) two General Electric generators, rated at 2,800 kW 
    and 1,200 kW, providing a total point rating of 4,000 kW; and (7) 
    existing appurtenant facilities.
        Hubbard Lake Development which includes: (1) An existing reinforced 
    concrete spillway section, 20 feet long, containing two needle beam 
    controlled bays; (2) two existing 45 foot long earth embankment 
    sections, each overlapped on the upstream and downstream sides with 
    concrete wing walls extending from both sides of the spillway; (3) an 
    existing reservoir with a surface area of 9,280 acres and a total 
    storage volume of 57,000 acre-feet at the normal maximum surface 
    elevation of 710.5 feet NGVD; and (4) existing appurtenant facilities.
        Upper South Development which includes: (1) Two existing earth 
    embankment sections, 220 feet long and 40 feet long for a total length 
    of 260 feet; (2) an existing reinforced concrete spillway section, 40 
    feet long, containing (a) four needle beam controlled bays, and (b) 
    concrete wing walls on the upstream and downstream sides overlapping 
    the earth embankments on both sides of the spillway; (3) an existing 
    reservoir with a surface area of 7,000 acres and a total storage volume 
    of 55,000 acre-feet at the normal maximum surface elevation of 731.0 
    feet NGVD; (4) two proposed submersible Flygt Corporation turbines with 
    a combined hydraulic capacity of 170 cfs, each equipped with a siphon 
    penstock and an elbow draft tube; and (5) existing appurtenant 
    facilities.
    B. Hillman Hydro Project FERC No. 2419
    
        This project consists of: (1) An existing earth fill section, 
    approximately 50 feet long; (2) an existing concrete gated spillway 
    section, approximately 38 feet long, containing (a) three needle beam 
    controlled bays, (b) a concrete training wall extending upstream of the 
    spillway along the right side, and (b) a reinforced concrete apron, 
    constructed along the downstream toe of the spillway; (3) an existing 
    non-overflow section which includes part of the Hillman grist mill 
    house, 26 feet long, constructed of upstream and downstream concrete 
    gravity walls with pressure grouted earth and rock fill between the two 
    walls; (4) an existing concrete uncontrolled spillway section, 27 feet 
    long, (formerly the intake structure of the grist mill in the early 
    1900's); (5) an existing non-overflow section, 20 feet long, 
    constructed of upstream and downstream concrete gravity walls with 
    pressure grouted earth and rock fill between the two walls; (6) an 
    existing reservoir with a surface area of 160 acres and a total storage 
    volume of 500 acre-feet at the normal maximum surface elevation of 
    747.2 feet NGVD; (7) an existing reinforced concrete and masonry 
    powerhouse, 17 feet by 21 feet, containing (a) a vertical shaft Francis 
    turbine with a hydraulic capacity of 270 cfs, manufactured by James 
    Leffel Company, and (b) a vertical shaft generator, manufactured by 
    Westinghouse and rated at 250 kW; and (8) existing appurtenant 
    facilities.
        The applicant proposes increasing capacity at the Upper South 
    Development by 200 kW as well as increasing the capacity at the Four 
    Mile Development by 600 kW, with the addition of three new generators, 
    respectively. The applicant estimates that the proposed total installed 
    project capacity would be 8.25 MW with a total average annual 
    generation of 8.26 GWH. The dam and existing project facilities of each 
    development are owned by the applicant. Project power would be utilized 
    by the applicant for sale to its customers.
    
    Project Site Visit
    
        The Commission staff will conduct a three day project site visit of 
    the Thunder Bay and Hillman Hydro Projects. The site meeting will be 
    held starting at 2:00 P.M. on September 5, 1995 at the entrance of the 
    Hillman Development and continue the next day (on September 6, 1995) at 
    8:00 A.M. at the Ninth Street Development, and finish on September 7, 
    1995 with the start at 8:30 A.M. at the Fletcher Floodwater and 
    conclusion at 12:30 P.M. at the Hillman Development. All interested 
    individuals, organizations, and agencies are invited to attend. All 
    participants are responsible for their own transportation to and from 
    the project site. For more details, interested parties should contact 
    Patrick Murphy, FERC, at (202) 219-2659 and Steve Naugle, FERC, at 
    (202) 219-2805, prior to the site visit date.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-21337 Filed 8-28-95; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
08/29/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-21337
Pages:
44864-44865 (2 pages)
Docket Numbers:
Projects Nos. 2404-017 & 2419-007--Michigan
PDF File:
95-21337.pdf