95-21338. Tennessee Gas Pipeline Co.; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 60, Number 167 (Tuesday, August 29, 1995)]
    [Notices]
    [Page 44864]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-21338]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP95-691-000]
    
    
    Tennessee Gas Pipeline Co.; Notice of Request Under Blanket 
    Authorization
    
    August 23, 1995.
        Take notice that on August 17, 1995, Tennessee Gas Pipeline Company 
    (Tennessee), P.O. Box 2511, Houston, Texas 77252, filed in Docket No. 
    CP95-691-000 a request pursuant to Sections 157.205 and 157.216 of the 
    Commission's Regulations under the Natural Gas Act (18 CFR 157.205, 
    157.216) for authorization to abandon by removal a sales tap and meter 
    facility located in Madison County, Kentucky under Tennessee's blanket 
    certificate issued in Docket No. CP82-413-000 pursuant to Section 7 of 
    the Natural Gas Act, all as more fully set forth in the request that is 
    on file with the Commission and open to public inspection.
        Tennessee proposes to abandon by removal the facility at the 
    Richmond Emergency Sales Meter Station No. 2-0503 located in Madison 
    County, Kentucky. Tennessee states that the sales meter station was 
    placed in service in November, 1970 to be used as an emergency delivery 
    point on Tennessee's system to provide backup protection for natural 
    gas service Columbia Gas Transmission Corporation (Columbia) (formerly 
    United Fuel Gas Company) was rendering in the Lexington, Kentucky area. 
    Tennessee states that this facility has been inactive since March, 
    1988. Columbia, the only customer served by the facility prior to the 
    meter becoming inactive, consented to the abandonment and removal by 
    signature dated July 12, 1995.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-21338 Filed 8-28-95; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
08/29/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-21338
Pages:
44864-44864 (1 pages)
Docket Numbers:
Docket No. CP95-691-000
PDF File:
95-21338.pdf