2019-18672. Commission Information Collection Activities (FERC-511); Consolidated Comment Request; Extension  

  • Start Preamble August 23, 2019.

    AGENCY:

    Federal Energy Regulatory Commission.

    ACTION:

    Notice of information collections and request for comments.

    SUMMARY:

    In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the requirements and burden of the information collections described below.

    DATES:

    Comments on the collections of information are due October 28, 2019.

    ADDRESSES:

    You may submit comments (identified by Docket No. IC19-39-000) by either of the following methods:

    Please reference the specific collection number and/or title in your comments.

    Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: http://www.ferc.gov/​help/​submission-guide.asp. For user assistance contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676 (toll-free), or (202) 502-8659 for TTY.

    Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at http://www.ferc.gov/​docs-filing/​docs-filing.asp.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Ellen Brown may be reached by email at DataClearance@FERC.gov, telephone at (202) 502-8663, and fax at (202) 273-0873.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Type of Request: Three-year extension of the information collection requirements for all collections described below with no changes to the current reporting requirements. Please note the three collections are distinct.

    Comments: Comments are invited on: (1) Whether the collections of information are necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency's estimates of the burden and cost of the collections of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collections; and (4) ways to minimize the burden of the collections of information on those who are to respond, including the use of automated collection techniques or other forms of information technology.

    Title: FERC-511, Transfer of Electric License.

    OMB Control No.: 1902-0069.

    Abstract: The Commission uses the information collected under the requirements of FERC-511 to implement the statutory provisions of Sections 4(e) and 8 of the Federal Power Act (FPA).[1] Section 4(e) authorizes the Commission to issue licenses for the construction, operation and maintenance of reservoirs, powerhouses, and transmission lines or other facilities necessary for the development and improvement of navigation and for the development, transmission, and utilization of power.[2] Section 8 of the FPA provides that the voluntary transfer of any license is made only with the written approval of the Commission. Any successor to the licensee may assign the rights of the original licensee but is subject to all of the conditions of the license. The information filed with the Commission is a mandatory requirement contained in the format of a written application for transfer of license, executed jointly by the parties of the proposed transfer. The sale or merger of a licensed hydroelectric project may occasion the transfer of a license. The Commission's staff uses the information collection to determine the qualifications of the proposed transferee to hold the license and to prepare the transfer of the license order. Approval by the Commission of transfer of a license is contingent upon the transfer of title to the properties under license, delivery of all license instruments, and evidence that such transfer is in the public interest. The Commission implements these filing requirements in the Code of Federal Regulations (CFR) under 18 CFR part 9.

    Type of Respondent: Hydropower Project Licensees.

    Estimate of Annual Burden: The Commission estimates the annual public reporting burden and cost [3] for the information collection as:

    Start Printed Page 45490

    FERC-511—Transfer of Electric License

    Number of respondentsAnnual number of responses per respondentTotal number of responsesAverage burden hrs. & cost per responseTotal annual burden hours & total annual costCost per respondent ($)
    (1)(2)(1) * (2) = (3)(4)(3) * (4) = (5)(5) ÷ (1)
    Hydropower Project Licensees4614640 hrs.; $3,2001,840 hrs.; $147,000$3,200
    Start Signature

    Kimberly D. Bose,

    Secretary.

    End Signature End Supplemental Information

    Footnotes

    2.  Refers to facilities across, along, from, or in any of the streams or other bodies of water over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States, or upon any part of public lands and reservations of the United States, or for the purpose of utilizing the surplus water or water power from any Government dam.

    Back to Citation

    3.  The FERC 2019 average salary plus benefits for one FERC full-time equivalent (FTE) is $167,091/year (or $80.00/hour). Commission staff estimates that the industry's skill set (wages and benefits) for completing and filing FERC-511 is comparable to the Commission's skill set.

    Back to Citation

    [FR Doc. 2019-18672 Filed 8-28-19; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
08/29/2019
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Action:
Notice of information collections and request for comments.
Document Number:
2019-18672
Dates:
Comments on the collections of information are due October 28, 2019.
Pages:
45489-45490 (2 pages)
Docket Numbers:
Docket No. IC19-39-000
PDF File:
2019-18672.pdf