2013-21202. Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization  

  • Start Preamble

    Take notice that on August 13, 2013, Southern Star Central Gas Pipeline, Inc. (Southern Star), 4700 Highway 56, Owensboro, Kentucky 42301, filed a prior notice request pursuant to sections 157.205, 157.208, 157.213, and 157.216 of the Commission's regulations under the Natural Gas Act (NGA) for authorization to permanently abandon an injection/withdrawal gas storage well and revert two observation wells back to injection/withdrawal wells within its existing Elk City Gas Storage Field located in Elk, Chautauqua and Montgomery Counties, Kansas. Southern Star's prior notice request is more fully set forth in the application, which is on file with the Commission and open to public inspection under Docket No. CP13-531-000. The filing may also be viewed on the Web at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY, (202) 502-8659.

    Any questions regarding the application should be directed to David N. Roberts, Staff Analyst, Regulatory Compliance, Southern Star Central Gas Pipeline, Inc., 4700 Highway 56, Owensboro, Kentucky 42301, or call (270) 852-4654.

    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission's public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff's issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission's public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff's FEIS or EA.

    Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission's staff may, pursuant to section 157.205 of the Commission's regulations under the NGA (18 CFR 157.205), file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA.

    The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a) (1) (iii) and the instructions on the Commission's Web site (www.ferc.gov) under the “e-Filing” link. Persons unable to file electronically should submit an original and five (5) copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426.

    Start Signature

    Dated: August 23, 2013.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2013-21202 Filed 8-29-13; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
08/30/2013
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2013-21202
Pages:
53746-53746 (1 pages)
Docket Numbers:
Docket No. CP13-531-000
PDF File:
2013-21202.pdf