[Federal Register Volume 60, Number 169 (Thursday, August 31, 1995)]
[Notices]
[Page 45408]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-21601]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP95-693-000]
Florida Gas Transmission Company, et al.; Notice of Application
August 25, 1995.
Take notice that on August 17, 1995, Florida Gas Transmission
Company (FGT), P.O. Box 1188, Houston, Texas 77251-1188, and Texas Gas
Transmission Corporation (Texas Gas) P.O. Box 1160, Owensboro, Kentucky
42302, filed in Docket No. CP95-693-000 a joint application pursuant to
Section 7(b) of the Natural Gas Act for permission and approval to
abandon two natural gas exchange services which were authorized in
Docket Nos. CP73-33-000 and CP73-306-000, all as more fully set forth
in the application which is on file with the Commission and open to
public inspection.
The applicants propose to abandon the following two exchange
services:
1. An exchange agreement under FGT's Rate Schedule E-4 and Texas
Gas' Rate Schedule X-45, that involved the operation of facilities and
exchange of gas on an emergency basis, during the period July 10 to
November 21, 1972.
2. An exchange agreement under FGT's Rate Schedule E-5 and Texas
Gas' Rate Schedule X-48 that authorized the exchange of gas, during
emergencies, at the Eunice Compressor Station located in Louisiana.
FGT and Texas Gas state that they signed a letter agreement on May
30, 1995 that terminates the exchange agreements listed above,
effective June 30, 1995.
Any person desiring to be heard or to make any protest with
reference to said application should on or before September 15, 1995,
file with the Federal Energy Regulatory Commission, Washington, D.C.
20426, a motion to intervene or a protest in accordance with the
requirements of the Commission's Rules of Practice and Procedure (18
CFR 385.214 or 385.211) and the Regulations under the Natural Gas Act
(18 CFR 157.10). All protests filed with the Commission will be
considered by it in determining the appropriate action to be taken but
will not serve to make the protestants parties to the proceeding. Any
person wishing to become a party to a proceeding or to participate as a
party in any hearing therein must file a motion to intervene in
accordance with the Commission's Rules.
Take further notice that, pursuant to the authority contained in
and subject to the jurisdiction conferred upon the Federal Energy
Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and
the Commission's Rules of Practice and Procedure, a hearing will be
held without further notice before the Commission or its designee on
this application if no motion to intervene is filed within the time
required herein, if the Commission on its own review of the matter
finds that permission and approval for the proposed abandonment are
required by the public convenience and necessity. If a motion for leave
to intervene is timely filed, or if the Commission on its own motion
believes that a formal hearing is required, further notice of such
hearing will be duly given.
Under the procedure herein provided for, unless otherwise advised,
it will be unnecessary for FGT and Texas Gas to appear or be
represented at the hearing.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 95-21601 Filed 8-30-95; 8:45 am]
BILLING CODE 6717-01-M