E7-17239. Bangor Water District; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or Motions To Intervene
-
Start Preamble
August 22, 2007.
Take notice that the following application has been filed with the Commission and is available for public inspection:
a. Application Type: Declaration of Intention.
b. Docket No.: DI07-11-000.
c. Date Filed: July 24, 2007.
d. Applicant: Bangor Water District.
e. Name of Project: Bangor Water District Hydropower Project.
f. Location: The proposed Bangor Water District Hydropower Project will be located in the District's existing water transmission pipe, in Penobscot County, near Bangor, Maine.
g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b).
h. Applicant Contact: Kathy Moriarty, General Manager, Bangor Water District, P.O. Box 1129, 614 State Street, Bangor, ME 04402-1129; telephone: (207) 947-4516; e-mail: http://moriarty@bangorwater.org.
i. FERC Contact: Any questions on this notice should be addressed to Henry Ecton, (202) 502-8768, or e-mail address: henry.ecton@ferc.gov.
j. Deadline for filing comments, protests, and/or motions: September 24, 2007.
All documents (original and eight copies) should be filed with: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comments, protests, and/or interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site at http://www.ferc.gov under the “e-Filing link.”
Please include the docket number (DI07-11-000) on any comments, protests, and/or motions filed.
k. Description of Project: The proposed Bangor Water District Hydropower Project will include: (1) Two 36-inch-diameter, one-mile-long water intake pipes, connected to a water treatment plant; (2) a 30-inch, 15-mile-long reinforced concrete pipe from the water treatment plant to a point under the Penobscot River, where it splits into two 24-inch reinforced concrete water pipes; (3) a 75-kW Canyon turbine/generator horizontal shaft unit, which will be installed in one of the 24-inch pipes, replacing a pressure reducing valve; (4) the two pipes rejoin, forming a 30-inch main, which conveys water to storage tanks for distribution into the Bangor water system; and (5) appurtenant facilities. The proposed project will not occupy any tribal or federal lands.
When a Declaration of Intention is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the interests of interstate or foreign commerce would be affected by the project. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy or affect public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) if applicable, has involved or would involve any construction subsequent to 1935 that may have increased or would increase the project's head or generating capacity, or have otherwise significantly modified the project's pre-1935 design or operation.
l. Locations of the Application: Copies of this filing are on file with the Commission and are available for public inspection. This filing may be viewed on the Web at http://www.ferc.gov using the “eLibrary” link, select “Docket#” and follow the instructions. For assistance, please contact FERC Online Start Printed Page 50360Support at FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676, or TTY, contact (202) 502-8659.
m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions To Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, 385.214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filings must bear in all capital letters the title “COMMENTS”, “PROTESTS”, AND/OR “MOTIONS TO INTERVENE”, as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application.
p. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representatives.
Start SignatureKimberly D. Bose,
Secretary.
[FR Doc. E7-17239 Filed 8-30-07; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Comments Received:
- 0 Comments
- Published:
- 08/31/2007
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- E7-17239
- Pages:
- 50359-50360 (2 pages)
- Docket Numbers:
- Docket No. DI07-11-000
- EOCitation:
- of 2007-08-22
- PDF File:
- e7-17239.pdf