[Federal Register Volume 59, Number 149 (Thursday, August 4, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-19052]
[[Page Unknown]]
[Federal Register: August 4, 1994]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Environmental Impact Statement: Henry, Johnson and Lafayette
Counties, MO
AGENCY: Federal Highway Administration (FHWA), Department of
Transportation (DOT).
ACTION: Notice of Intent.
-----------------------------------------------------------------------
SUMMARY: The FHWA is issuing this notice to advise the public that an
environmental impact statement will be prepared for a proposed project
in Henry, Johnson and Lafayette Counties, Missouri.
FOR FURTHER INFORMATION CONTACT:
Mr. Donald Neumann, Federal Highway Administration, P.O. Box 1787,
Jefferson City, MO 65102, Telephone Number 314-636-7104; or Mr. Bob
Sfreddo, Design Engineer, Missouri Highway and Transportation
Department, P.O. Box 270, Jefferson City, MO 65102, Telephone Number
314-751-2876.
SUPPLEMENTARY INFORMATION: The FHWA, in cooperation with the Missouri
Highway and Transportation Department (MHTD) and the U.S. Army Corps of
Engineers, will prepare an environmental impact statement (EIS) on a
proposal to improve a portion of Missouri Route 13 in Henry, Johnson
and Lafayette Counties, Missouri. Improvements would involve the
reconstruction of existing Route 13 from Lexington to south of Clinton,
a total distance of approximately 154.7 kilometers (70 miles).
1. The proposed improvement is considered necessary to meet
anticipated traffic demand and to improve roadway safety. The project
would serve as an alternative access to Whiteman Air Force Base.
2. In Missouri, alternatives under consideration include (1) a ``no
build'' option, (2) improvement of the existing alignment, and (3)
alternatives on new alignments. Authorization pursuant to Section 404
of the Clean Water Act will be required. Concurrent with preparation of
the EIS, the Corps of Engineers will evaluate the alternatives and
associated impacts that would result from the project. Comments
received during the EIS process will be considered by the Corps of
Engineers in the evaluation.
3. To date, preliminary information has been issued to local
officials and other interested parties. The scoping process has been
initiated with Federal, State, and local agencies. A formal scoping
meeting is scheduled for August 10, 1994, in Warrensburg, Missouri. In
addition, public hearings will be held. Public notice will be given in
advance of the date and time of each meeting. The draft EIS will be
available prior to the public hearing for public review and comment. To
ensure that the full range of issues related to this proposed action
are addressed and all significant issues identified, comments and
suggestions are invited from all interested parties. Any comments or
questions concerning this proposed action and the EIS should be
directed to the FHWA or the Missouri Highway and Transportation
Department at the addresses provided above.
Issued on: July 28, 1994.
Gerald J. Reihsen, P.E.,
Division Administrator, Jefferson City.
[FR Doc. 94-19052 Filed 8-3-94; 8:45 am]
BILLING CODE 4910-22-M