DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Filed With the Commission
July 29, 1997.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Amendment of License.
b. Project No.: 6879-019.
c. Dates Filed: March 8, 1995 and July 8, 1997.
d. Applicant: Southeastern Hydro-Power, Inc.
e. Name of Project: W. Kerr Scott Project.
f. Location: On the Yadkin River in Wilkes County, North Carolina.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. Sec. 791(a)-
825(r).
h. Applicant Contact: Mr. Charles Mierek, Southeastern Hydro-Power,
Inc., 5250 Clifton-Glendale Road, Spartanburg, SC 29307-4618, (864)
579-4405.
i. FERC Contact: Paul Shannon, (202) 219-2866.
j. Comment Date: September 12, 1997.
k. Description of Filings: Southeastern Hydro-Power, Inc. filed an
application to modify the authorized configuration of the W. Kerr Scott
Project and amend the project's license. The licensee proposes to
install two Francis turbines instead of one Kaplan turbine, change the
location of the powerhouse from the right bank of the river to the left
bank (looking downstream), delete license articles 46 (requiring an
instream flow study) and 47 (maintaining an interim minimum flow below
the W. Kerr Scott Dam), and replace article 48 with another article
that addresses fishery resources.
1. This notice also consists of the following standard paragraphs:
B, C1, and D2.
B. Comments, Projects, or Motions to Intervene
Anyone may submit comments, a protest, or a motion to intervene in
accordance with the requirements of Rules of Practice and Procedure, 18
CFR 385.210, .211, .214. In determining the appropriate action to take,
the Commission will consider all protests or other comments filed, but
only those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
C1. Filing and Service of Responsive Documents
Any filings must bear in all capital letters the title
``COMMENTS'', ``RECOMMENDATIONS FOR TERMS AND CONDITIONS'',
``PROTEST'', OR ``MOTION TO INTERVENE'', as applicable, and the Project
Number of the particular application to which the filing refers. Any of
the above-named documents must be filed by providing the original and
the number of copies provided by the Commission's regulations to: The
Secretary, Federal Energy Regulatory Commission, 888 First Street,
N.E., Washington, D.C. 20426. A copy of any motion to intervene must
also be served upon each representative of the Applicant specified in
the particular application.
D2. Agency Comments
Federal state, and local agencies are invited to file comments on
the described application. A copy of the application may be obtained by
agencies directly from the Applicant. If an agency does not file
comments within the time specified for filing comments, it will be
presumed to have no comments. One copy of an agency's comments must
also be sent to the Applicant's representatives.
Lois D. Cashell,
Secretary.