98-20671. Mid Louisiana Gas Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 63, Number 149 (Tuesday, August 4, 1998)]
    [Notices]
    [Page 41560]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-20671]
    
    
    
    [[Page 41560]]
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP98-687-000]
    
    
    Mid Louisiana Gas Company; Notice of Request Under Blanket 
    Authorization
    
    July 29, 1998.
        Take notice that on July 23, 1998, Mid Louisiana Gas Company (Mid 
    Louisiana), 1100 Louisiana Street, Suite 2950, Houston, Texas 77002, 
    filed in Docket No. CP98-687-000 a request pursuant to Sections 157.205 
    and 157.212 of the Commission's Regulations under the Natural Gas Act 
    (18 CFR 157.205, 157.212) for authorization to operate an existing tap 
    located in West Feliciana Parish, Louisiana, as a delivery point, the 
    accommodate natural gas transportation deliveries for Midcost 
    Marketing, Inc. (Midcoast), an existing customer, under Mid Louisiana's 
    blanket certificate issued in Docket No. CP82-539-000 pursuant to 
    Section 7 of the Natural Gas Act, all as more fully set forth in the 
    request that is on file with the Commission and open to public 
    inspection.
        Mid Louisiana seeks authorization to operate an existing tap and 
    install the necessary measurement and regulator facilities to 
    accommodate the delivery of transportation volumes for gas lift 
    operations under Mid Louisiana's currently effective interruptible 
    transportation agreement with Midcost dated September 1, 1998. Mid 
    Louisiana states that Midcoast has requested the installation of the 
    proposed facilities in order to effectuate a sales transaction to 
    riverside Pipeline.
        Mid Louisiana states that the estimated average daily deliveries 
    from the proposed facilities will be approximately to 50 MMBtu, with a 
    peak design capacity of 400 MMBtu. Mid Louisiana estimates the average 
    annual quantity to be 15,000 MMBtu.
        Mid Louisiana states that the estimated cost to install the 
    facilities will be $1,800, which will include the necessary metering 
    and regulation equipment all of which will be reimbursed by Midcoast.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205) of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefore, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 98-20671 Filed 8-3-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
08/04/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-20671
Pages:
41560-41560 (1 pages)
Docket Numbers:
Docket No. CP98-687-000
PDF File:
98-20671.pdf