[Federal Register Volume 63, Number 149 (Tuesday, August 4, 1998)]
[Notices]
[Pages 41543-41544]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-20735]
-----------------------------------------------------------------------
DEPARTMENT OF AGRICULTURE
Rural Utilities Service
Associated Electric Cooperative, Inc.; Notice of Intent
AGENCY: Rural Utilities Service, USDA.
ACTION: Notice of intent to hold scoping meeting and prepare an
Environmental Assessment and/or Environmental Impact Statement.
-----------------------------------------------------------------------
SUMMARY: Notice is hereby given that the Rural Utilities Service (RUS),
pursuant to the National Environmental Policy Act of 1969 (NEPA) (42
U.S.C. 4321 et seq.), the Council on Environmental Quality (CEQ)
Regulations for Implementing NEPA (40 CFR Parts 1500-1508), and RUS
Environmental Policies and Procedures (7 CFR Part 1794) proposes to
prepare an Environmental Assessment and/or an Environmental Impact
Statement (EIS) for its Federal action related to a proposal by
Associated Electric Cooperative, Inc., to construct two, 100 megawatt
simple cycle electric turbines in Northwest Missouri.
MEETING INFORMATION: RUS will conduct a scoping meeting in an open
house forum on Tuesday, September 8, 1998, from 6 p.m. until 8 p.m at
the headquarters of United Electric Cooperative in Maryville, Missouri.
The headquarters is located on Highway 136 East approximately 2.5 miles
east of Maryville.
FOR INFORMATION CONTACT: Bob Quigel, Engineering and Environmental
Staff, Rural Utility Service, Stop 1571, 1400 Independence Avenue, SW,
Washington, DC 20250-1571, telephone (202) 720-0468. Bob's E-mail
address is bquigel@rus.usda.gov.
SUPPLEMENTARY INFORMATION: Associated Electric Cooperative, Inc.,
proposes to construct the plant at one of two potential sites. These
sites are in the Nodaway County, Missouri. One site is approximately
5.5 miles southeast of Maryville about 0.5 miles south of the
intersection of County Highways N and F along County Highway N. The
other site is located approximately 1.5 miles east of Graham along
County Highway A then 1 mile north up a gravel road.
The proposed project will be composed of two nominal 100 megawatt
simple cycle combustion turbines. They will be primarily gas-fired
combustion turbines with the option to burn fuel oil. The combustion
turbines will be used for peaking capacity. The hours of operation of
the combustion turbines will be limited. The number of operating hours
will depend on the emission rates ultimately guaranteed by
[[Page 41544]]
the vendor. The project will be permitted as a minor air pollution
source (less than 250 tons of any criteria pollutant). The simple cycle
gas-fired combustion turbines require minimal water for operation.
Depending on temperature and humidity conditions, there may be some
water discharges from the site. Such discharges will be permitted under
the Missouri National Pollutant Discharge Elimination System program.
Alternatives considered by RUS and Associated Electric Cooperative,
Inc., to constructing the generation facility proposed include: (a) No
action, (b) purchase of power, (c) load management, (d) construction of
additional base load capacity, and (e) renewable energy.
To be presented at the public scoping meeting will be a siting and
alternative study prepared by Associated Electric Cooperative, Inc. The
siting and alternative study is available for public review at RUS at
the address provided in this notice or at Associated Electric
Cooperative, Inc., 2814 South Golden, Springfield, Missouri, 65801-
0754, phone (417) 881-1204. This document will also be available at the
Maryville Public Library which is located at 5th and Main Street in
Maryville.
Government agencies, private organizations, and the public are
invited to participate in the planning and analysis of the proposed
project. Representatives from RUS and Associated Electric Cooperative,
Inc., will be available at the scoping meeting to discuss RUS's
environmental review process, describe the project and alternatives
under consideration, discuss the scope of environmental issues to be
considered, answer questions, and accept oral and written comments.
Written comments will be accepted for at least 30 days after the public
scoping meeting. Written comments should be sent to RUS at the address
provided in this notice.
From information provided in the siting and alternative study,
input that may be provided by government agencies, private
organizations, and the public, Associated Electric Cooperative, Inc.,
and Burns and McDonnell will prepare an environmental analysis to be
submitted to RUS for review. If significant impacts are not evident
based on a review of the environmental analysis and other relevant
information, RUS will prepare an environmental assessment to determine
if the preparation of an EIS is warranted.
Should RUS determine that the preparation of an EIS is not
warranted, it will prepare a finding of no significant impact (FONSI).
The FONSI will be made available for public review and comment for 30
days. Public notification of a FONSI would be published in the Federal
Register and in newspapers with a circulation in the project area. RUS
will not take its final action related to the project prior to the
expiration of the 30-day period.
Any final action by RUS related to the proposed project will be
subject to, and contingent upon, compliance with environmental review
requirements as prescribed by CEQ and RUS environmental policies and
procedures.
Dated: July 29, 1998.
Lawrence R. Wolfe,
Acting Director, Engineering and Environmental Staff.