[Federal Register Volume 59, Number 150 (Friday, August 5, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-19003]
[[Page Unknown]]
[Federal Register: August 5, 1994]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-4713-8]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 260-5076 OR (202) 260-5075.
Weekly receipt of Environmental Impact Statements Filed July 25,
1994 Through July 29, 1994 Pursuant to 40 CFR 1506.9.
EIS No. 940304, DRAFT EIS, DOE, WA, Safe Interim Storage of Hanford
Tank Wastes, Double Shell Tanks (DSTs) and Cross Site Transfer System
(CSTS) Construction, Hanford Site, Adams, Richland, Washington, Benton
and Franklin Counties, WA, Due: September 19, 1994, Contact: Dr. Don
Alexander (509) 372-2453.
EIS No. 940299, FINAL SUPPLEMENT, FHW, VA, VA-234 Bypass Corridor
Transportation Improvement, VA-619 at Independent Hill to US 15 at
Woolsey, Updated and New Information, Funding, City of Manassas, Prince
William County, VA, Due: September 06, 1994, Contact: James M. Tumlin
(804) 771-2371.
EIS No. 940300, DRAFT EIS, FHW, NH, Broad Street Parkway Project,
Construction, Board Street near Exit 6 of the FE Everett Turnpike on
the North to the West Hollis Street/ Kinsley Street area near Pine
Street on the South, Funding and Possible COE Section 404 Permit,
Hillsborough County, NH, Due: September 19, 1994, Contact: William F.
O'Donnell (603) 225-1608.
EIS No. 940301, DRAFT EIS, FHW, CA, US 101 Realignment Construction,
near Cushing Creek from Mile Post 20.3 to 22.3 South of Crescent City,
Funding and COE Permits, Del Norte County, CA, Due: September 19, 1994,
Contact: John R. Schultz (916) 551-1314.
EIS No. 940302, FINAL EIS, SFW, IN, Patoka River National Wetlands
Project, Land Acquisition for Fish and Wildlife Protection and
Management, Funding and COE Section 404 Permit, Gibson and Pike
Counties, IN, Due: September 06, 1994, Contact: William McCoy (812)
749-3199.
EIS No. 940303, LEGISLATIVE DRAFT EIS, AFS, NC, North Fork Mills, South
Fork Mills and Mills Rivers Wild and Scenic River Study, Designation
Nondesignation, into the National Wild and Scenic River System, Pisgah
National Forest, Henderson and Transylvania Counties, NC, Due:
September 30, 1994, Contact: Randle G. Phillips (704) 257-4200.
EIS No. 940305, FINAL SUPPLEMENT, USN, WA, US West Coast Homeporting
Program for Fast Combat Support Ships (AOE-6 Class), Updated
Information concerning Dredging and Dredge Disposal at Pier D Naval
Shipyard Puget Sound for the Berthing of (AOE-6 Class) Ships and
Temporary Berthing of Deep-Draft Vessels, Sincliar Inlet, Bremerton,
WA, Due: September 06, 1994, Contact: Peter W. Havens (206) 396-5976.
EIS No. 940306, FINAL EIS, DOE, WA, ID, WY, CO, CA, OR, MT, UT, NM, NV,
AZ, PacifiCorp Capacity Power Sale Contract for 1100 Megawatts (MW)
Long-Term Contract for Peaking Capacity, Implementation, WA, OR, ID,
MT, WY, UT, CO, CA, NV, AZ, NM and British Columbia, Due: September 06,
1994, Contact: Michael Ary (503) 230-4259.
EIS No. 940307, DRAFT SUPPLEMENT EIS, AFS, UT, Gardner Canyon Gypsum
Open Pit Mine, Development and Operation, Updated Information, Special-
Use-Permit and Possible COE Section 404 Permit, Mount Nebo Wilderness
Area, Uinta National Forest, Juab County, UT, Due: October 01, 1994,
Contact: Mark Sensibaugh (801) 798-3571.
EIS No. 940308, FINAL EIS, DOE, FL, Adoption Tampa Electric--Polk 1150
Megwatt Power Station Construction and Operation, NPDES and COE Section
404 Permits, Polk County, FL, Contact: Bruce Buvinger (304) 291-4379.
The US Department of Energy's has adopted the US Environmental
Protection Agency's final EIS filed on 6-03-94. The DOE was a
Cooperating Agency for the above final EIS. Recirculation of the
document is not necessary Under Sec. 1506.3(c) of the Council on
Environmental Quality Regulations.
EIS No. 940309, FINAL EIS, DOE, OR, Coyote Springs Cogeneration
Project, General Transmission Agreement Revision for Construction and
Operations of the Coyote Springs Interconnection, Implementation and
COE Permits, Morrow County, OR, Due: September 06, 1994, Contact: Ken
Barnhart (503) 230-3667.
EIS No. 940310, FINAL EIS, NPS, WA, Hanford Reach of the Columbia River
Comprehensive River Conservation Study, Designation or Nondesignation,
National Wildlife Refuge with Wild and Scenic River Overlay, Benton,
Grant and Franklin Counties, WA, Due: September 06, 1994, Contact: Ms.
Kristen Sycamore (206) 220-4115.
EIS No. 940311, DRAFT EIS, FRC, CA, Clavey River Hydroelectric Project
(FERC # 10081), Construction, Operation and Maintenance License, USFS
Special-Use-Permit, BLM Right-of-Way Permit and COE Section 404 Permit
Issuance, Tuolumne County, CA, Due: September 19, 1994, Contact: Mr.
Thomas Camp (202) 219-2832.
Dated: August 1, 1994.
William D. Dickerson,
Deputy Director, Office of Federal Activities.
[FR Doc. 94-19003 Filed 8-4-94; 8:45 am]
BILLING CODE 6560-50-U