94-19003. Environmental Impact Statements; Notice of Availability  

  • [Federal Register Volume 59, Number 150 (Friday, August 5, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-19003]
    
    
    [[Page Unknown]]
    
    [Federal Register: August 5, 1994]
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    [ER-FRL-4713-8]
    
     
    
    Environmental Impact Statements; Notice of Availability
    
    Responsible Agency: Office of Federal Activities, General 
    Information (202) 260-5076 OR (202) 260-5075.
    
        Weekly receipt of Environmental Impact Statements Filed July 25, 
    1994 Through July 29, 1994 Pursuant to 40 CFR 1506.9.
    
    EIS No. 940304, DRAFT EIS, DOE, WA, Safe Interim Storage of Hanford 
    Tank Wastes, Double Shell Tanks (DSTs) and Cross Site Transfer System 
    (CSTS) Construction, Hanford Site, Adams, Richland, Washington, Benton 
    and Franklin Counties, WA, Due: September 19, 1994, Contact: Dr. Don 
    Alexander (509) 372-2453.
    EIS No. 940299, FINAL SUPPLEMENT, FHW, VA, VA-234 Bypass Corridor 
    Transportation Improvement, VA-619 at Independent Hill to US 15 at 
    Woolsey, Updated and New Information, Funding, City of Manassas, Prince 
    William County, VA, Due: September 06, 1994, Contact: James M. Tumlin 
    (804) 771-2371.
    EIS No. 940300, DRAFT EIS, FHW, NH, Broad Street Parkway Project, 
    Construction, Board Street near Exit 6 of the FE Everett Turnpike on 
    the North to the West Hollis Street/ Kinsley Street area near Pine 
    Street on the South, Funding and Possible COE Section 404 Permit, 
    Hillsborough County, NH, Due: September 19, 1994, Contact: William F. 
    O'Donnell (603) 225-1608.
    EIS No. 940301, DRAFT EIS, FHW, CA, US 101 Realignment Construction, 
    near Cushing Creek from Mile Post 20.3 to 22.3 South of Crescent City, 
    Funding and COE Permits, Del Norte County, CA, Due: September 19, 1994, 
    Contact: John R. Schultz (916) 551-1314.
    EIS No. 940302, FINAL EIS, SFW, IN, Patoka River National Wetlands 
    Project, Land Acquisition for Fish and Wildlife Protection and 
    Management, Funding and COE Section 404 Permit, Gibson and Pike 
    Counties, IN, Due: September 06, 1994, Contact: William McCoy (812) 
    749-3199.
    EIS No. 940303, LEGISLATIVE DRAFT EIS, AFS, NC, North Fork Mills, South 
    Fork Mills and Mills Rivers Wild and Scenic River Study, Designation 
    Nondesignation, into the National Wild and Scenic River System, Pisgah 
    National Forest, Henderson and Transylvania Counties, NC, Due: 
    September 30, 1994, Contact: Randle G. Phillips (704) 257-4200.
    EIS No. 940305, FINAL SUPPLEMENT, USN, WA, US West Coast Homeporting 
    Program for Fast Combat Support Ships (AOE-6 Class), Updated 
    Information concerning Dredging and Dredge Disposal at Pier D Naval 
    Shipyard Puget Sound for the Berthing of (AOE-6 Class) Ships and 
    Temporary Berthing of Deep-Draft Vessels, Sincliar Inlet, Bremerton, 
    WA, Due: September 06, 1994, Contact: Peter W. Havens (206) 396-5976.
    EIS No. 940306, FINAL EIS, DOE, WA, ID, WY, CO, CA, OR, MT, UT, NM, NV, 
    AZ, PacifiCorp Capacity Power Sale Contract for 1100 Megawatts (MW) 
    Long-Term Contract for Peaking Capacity, Implementation, WA, OR, ID, 
    MT, WY, UT, CO, CA, NV, AZ, NM and British Columbia, Due: September 06, 
    1994, Contact: Michael Ary (503) 230-4259.
    EIS No. 940307, DRAFT SUPPLEMENT EIS, AFS, UT, Gardner Canyon Gypsum 
    Open Pit Mine, Development and Operation, Updated Information, Special-
    Use-Permit and Possible COE Section 404 Permit, Mount Nebo Wilderness 
    Area, Uinta National Forest, Juab County, UT, Due: October 01, 1994, 
    Contact: Mark Sensibaugh (801) 798-3571.
    EIS No. 940308, FINAL EIS, DOE, FL, Adoption Tampa Electric--Polk 1150 
    Megwatt Power Station Construction and Operation, NPDES and COE Section 
    404 Permits, Polk County, FL, Contact: Bruce Buvinger (304) 291-4379.
    
        The US Department of Energy's has adopted the US Environmental 
    Protection Agency's final EIS filed on 6-03-94. The DOE was a 
    Cooperating Agency for the above final EIS. Recirculation of the 
    document is not necessary Under Sec. 1506.3(c) of the Council on 
    Environmental Quality Regulations.
    
    EIS No. 940309, FINAL EIS, DOE, OR, Coyote Springs Cogeneration 
    Project, General Transmission Agreement Revision for Construction and 
    Operations of the Coyote Springs Interconnection, Implementation and 
    COE Permits, Morrow County, OR, Due: September 06, 1994, Contact: Ken 
    Barnhart (503) 230-3667.
    EIS No. 940310, FINAL EIS, NPS, WA, Hanford Reach of the Columbia River 
    Comprehensive River Conservation Study, Designation or Nondesignation, 
    National Wildlife Refuge with Wild and Scenic River Overlay, Benton, 
    Grant and Franklin Counties, WA, Due: September 06, 1994, Contact: Ms. 
    Kristen Sycamore (206) 220-4115.
    EIS No. 940311, DRAFT EIS, FRC, CA, Clavey River Hydroelectric Project 
    (FERC # 10081), Construction, Operation and Maintenance License, USFS 
    Special-Use-Permit, BLM Right-of-Way Permit and COE Section 404 Permit 
    Issuance, Tuolumne County, CA, Due: September 19, 1994, Contact: Mr. 
    Thomas Camp (202) 219-2832.
    
        Dated: August 1, 1994.
    William D. Dickerson,
    Deputy Director, Office of Federal Activities.
    [FR Doc. 94-19003 Filed 8-4-94; 8:45 am]
    BILLING CODE 6560-50-U
    
    
    

Document Information

Published:
08/05/1994
Department:
Environmental Protection Agency
Entry Type:
Uncategorized Document
Document Number:
94-19003
Pages:
0-0 (1 pages)