96-19775. Koch Gateway Pipeline Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 61, Number 151 (Monday, August 5, 1996)]
    [Notices]
    [Page 40630]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-19775]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP96-654-000]
    
    
    Koch Gateway Pipeline Company; Notice of Request Under Blanket 
    Authorization
    
    July 30, 1996.
        Take notice that on July 24, 1996, Koch Gateway Pipeline Company 
    (Koch), 600 Travis Street, Houston, Texas, 77251-1478, filed in Docket 
    No. CP96-654-000 a request pursuant to Sections 157.205 and 157.211 of 
    the Commission's Regulations under the Natural Gas Act (18 CFR 157.205 
    and 157.211) for approval and permission to install a four-inch tap and 
    meter station, under the blanket certificate issued in Docket No. CP82-
    430-000, pursuant to Section 7(c) of the Natural Gas Act (NGA), all as 
    more fully set forth in the request which is on file with the 
    Commission and open to public inspection.
        Koch states that it proposes to install a four-inch tap and to 
    provide a new delivery point and meter station to serve Promix, Inc. 
    (Promix) in Assumption Parish, Louisiana for refining and processing at 
    its plant. Koch states that Promix will construct approximately 25 feet 
    of four-inch pipeline which will connect Koch's tap and metering 
    facilities on an existing Promix line. Koch indicates that it will 
    transport natural gas on an interruptible basis to the proposed tap 
    pursuant to Part 284 of the Commission's Regulations once the 
    construction of the tap has been completed. It is asserted that the 
    service provided through the proposed facilities will be within the 
    entitlements of shippers providing service to Promix under those 
    shippers' existing ITS agreements with Koch. Koch indicates that the 
    estimated cost of construction is $43,999 for which Promix will 
    reimburse Koch.
        Any person or Commission Staff may, within 45 days of the issuance 
    of the instant notice by the Commission, file pursuant to Rule 214 of 
    the Commission's Rules of Practice and Procedure (18 CFR 385.214), a 
    motion to intervene and pursuant to Section 157.205 of the regulations 
    under the Natural Gas Act (18 CFR 157.205), a protest to the request. 
    If no protest is filed within the time allowed therefor, the proposed 
    activities shall be deemed to be authorized effective the day after the 
    time allowed for filing a protest. If a protest is filed and not 
    withdrawn 30 days after the time allowed for filing a protest, the 
    instant request shall be treated as an application for authorization 
    pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-19775 Filed 8-2-96; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
08/05/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-19775
Pages:
40630-40630 (1 pages)
Docket Numbers:
Docket No. CP96-654-000
PDF File:
96-19775.pdf